Schedule Appointment
James Hardie

Recent Project: Austin | Balcones | Siding | 10-02-23 | APS-3702

Complete James Hardie HardiePlank Fiber Cement Siding Replacement | Single-Day Full Exterior Tear-Off and Install

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

This Austin siding project swapped worn-out cladding for James Hardie fiber cement in the HardiePlank profile. We chose HardiePlank because fiber cement shrugs off 100-degree heat, hail, and the moisture swings that split lesser materials. The install wrapped in a single day after months of careful planning and color selection. The result is a durable, clean exterior that fits the older Balcones-area home and needs almost no upkeep.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through Yelp and reached out on May 10, 2023, about replacing the tired exterior siding on their Balcones-area home. We talked through the failing cladding and what fiber cement could do for a house dealing with Austin heat and hail.

Evaluation

By May 12, 2023, the project moved into our prospect stage for a full exterior assessment. We inspected the old siding on every elevation and found heat-brittle sun-facing walls plus moisture-softened boards on the shaded north side, made worse by damp limestone soil near the foundation.

PLanning & Approval

The homeowner approved the project on May 19, 2023. From there we finalized the James Hardie HardiePlank selection, coordinated trim and finish details with Sherwin Williams products, and locked in the install schedule.

Installation

On October 2, 2023, our crew completed the full tear-off and new install in a single day. They stripped the old cladding to the sheathing, added a fresh weather barrier, then set the HardiePlank lap boards with proper flashing at every trim and penetration.

Completion

We wrapped and invoiced the same day, October 2, 2023, after a final walkthrough of the finished exterior. The home closed out on January 3, 2024, now protected by a rot-proof, hail-resistant Hardie shell backed by the manufacturer's fiber cement warranty.

Siding in Balcones, Austin | Austin Pro

We stripped the old, failing cladding off a home near Balcones Drive in Austin and installed James Hardie fiber cement siding in the HardiePlank profile. The house now wears a tough, heat-ready shell that handles Central Texas weather without complaint.

Project at a glance

  • Service: Full exterior siding replacement
  • Location: Balcones Drive area, Austin, TX (78731)
  • Vendor & product: James Hardie fiber cement, HardiePlank lap siding
  • Material: Fiber cement HardiePlank
  • Timeframe: Approved May 19, 2023; installed October 2, 2023
  • Standout outcome: A one-day install that left the home with a rot-proof, hail-resistant exterior

Why did this Austin home need new siding?

The original cladding had taken a beating. Years of 100-degree summers and spring hail had left it faded, cracked, and pulling away in spots. Homes in this part of Austin often date to the 1980s and 1990s, and their first-generation siding rarely survives that long in good shape.

  • Sun exposure had bleached and chalked the old boards
  • Moisture had crept behind failing seams near the base
  • The homeowner wanted a material that would outlast the next round of hail

What did we find during the inspection?

When we walked the exterior, the trouble was worse up close than from the curb. Old siding along the shaded north side showed the early softness that signals moisture damage, while the sun-facing walls had gone brittle. Limestone-heavy soil around the foundation also kept the lower courses damp longer after rain, which speeds up decay on wood-based products. That combination made a full replacement the honest call rather than a patch job. Fiber cement solved both problems at once because it does not feed rot and does not warp in heat.

What materials did we use, and why?

We went with James Hardie HardiePlank fiber cement lap siding for the whole home. Fiber cement is engineered for climates exactly like ours, and Hardie builds its Texas product for heat and humidity swings.

  • HardiePlank lap for the main wall field, a clean traditional look
  • Baked-on factory finish to resist Austin's harsh UV
  • Non-combustible fiber cement, a real plus in dry Hill Country summers
  • Coordinated trim and caulking with Sherwin Williams products

Cedar pollen season is another quiet reason fiber cement wins here. The dense, smooth surface wipes clean far easier than rough wood, so the yellow-green dusting that coats Austin every winter rinses right off.

How did the installation go?

Our crew completed the tear-off and new install in a single day on October 2, 2023. That pace comes from planning the layout and staging materials before anyone touched the wall. Fiber cement is heavy and precise work, so a tight crew and good prep matter more than speed alone.

  • Full removal of the old cladding down to the sheathing
  • Fresh weather barrier before any new board went up
  • Proper gap and flashing details at trim and penetrations
  • Materials sourced through local suppliers including ABC Supply

What were the results?

The home came out clean, straight, and built for the long haul. The new HardiePlank exterior resists the heat, hail, and moisture that wore down the old siding, and it needs little more than an occasional rinse. The project fell in the $25k–$30k range for a complete replacement.

  • A uniform, modern finish that suits the neighborhood
  • Far lower upkeep than the wood-based material it replaced
  • Backed by James Hardie's fiber cement product warranty

Frequently asked questions

How long does James Hardie siding last in Austin's climate?

Fiber cement is built to handle decades of Central Texas heat and hail. It will not rot, warp, or feed termites, which is why it holds up so well on older Austin homes.

Why replace all the siding instead of just the damaged sections?

The old material had aged past the point of clean patching, with both heat-brittle and moisture-soft areas. A full replacement gave the home one consistent, watertight surface instead of mismatched repairs.

How long did the actual siding work take?

The on-site install ran a single day on October 2, 2023. The longer timeline before that covered color selection, planning, and scheduling after approval in May.

Does the new siding need painting or sealing?

Hardie's factory finish handles the color and UV protection, so no immediate repaint is needed. Down the road, it takes paint well if the homeowner ever wants a new look.

GAF shingle roofGAF Master Elite Certificate

HERE sOME OF THE PROJECT IMAGES

After image
Before image
Before
After
No items found.