James Hardie Siding & Doors in Adirondack, Austin — completed project by Austin Pro

Completed October 2024

Siding in Adirondack, Austin, TX

Plus Doors, Exterior Painting on the same job

We replaced siding , handled doors , and painted exterior surfaces at this Adirondack home in Austin, TX. The finished work brought the siding section, trim, and garage-facing details into a more consistent finish.

Trades
Siding, Doors, Exterior Painting
Location
Adirondack, Austin, TX
Completed

Standout outcome — The siding work and painted garage doors were completed together.

Timeframe — September 30–October 3, 2024; four days of on-site work.

Vendors and products — James Hardie 8.25-inch Primed Select Cedar Mill; Pella doors; Sherwin Williams SuperPaint.

Job APS-4157

Drag to Compare

Before & After

After: James Hardie siding & doors completed in Adirondack, Austin
Before the siding & doors project — home exterior in Adirondack, Austin
Before
After

Scope of Work

What We Did

Double-Layer Tear-Off and James Hardie Fiber Cement Siding · Pella Front Door with Coordinated Exterior Paint Work

Siding

This siding project in Austin, TX, included a double-layer tear-off and a new siding section. We used James Hardie fiber cement in 8.25-inch Primed Select Cedar Mill. Fiber cement was a practical choice for an exterior exposed to Austin's long, hot summers. Four-inch James Hardie trim and a Sherwin Williams painted finish completed the work.

James Hardie8.25" Primed Select Cedar MillFiber Cement Siding$10k–$15k
Learn more about our siding replacement →

Doors

Pella doors were part of this Austin, TX, exterior project. The door work took place alongside siding and painting, so the crew could finish the affected areas together. We also wrapped the garage door jambs and painted the garage doors. The result was a more consistent finish across the worked-on parts of the exterior.

Pella$5k–$10k
Learn more about our door replacement →

Exterior Painting

Exterior painting in Austin completed the siding and garage-facing work on this project. We used Sherwin Williams SuperPaint for the primed siding. The garage doors were painted as part of the same scope. That final coat gave the worked-on surfaces a consistent finish.

Learn more about our exterior house painting →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

May 12, 2024

The homeowner reached out on May 12, 2024, after a referral from a past customer. The conversation centered on exterior work that would include siding and doors at the Adirondack home.

Evaluation

We inspected the home on May 13 and began the estimate. The siding scope called for a double-layer tear-off, a new siding section, and James Hardie trim. We also assessed the door and painting work as part of the same project.

Planning & approval

June 5, 2024

The homeowner approved the project on June 5, 2024. The plan included James Hardie Primed Select Cedar Mill siding, Pella door work, Sherwin Williams paint, and garage door jamb wrapping. A permit fee was included in the scope.

Installation

October 3, 2024

The crew worked on site from September 30 through October 3, 2024. We handled the tear-off, installed the siding section and trim, and carried out the door work. The crew also wrapped the garage door jambs and painted the specified siding and garage doors.

Completion

October 3, 2024

The crew finished on-site work on October 3, 2024. Yard cleanup and punch items were part of the final scope. The completed areas brought the new siding, door work, and painted surfaces together.

7 Photos

Project Photos

Every photo is this job, shot on site by our crew in Adirondack, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why did this Adirondack home need more than new siding?

The homeowner reached out on May 12, 2024, after a referral from a past customer. The request became a coordinated siding, door, and painting project rather than a siding-only job. That distinction matters when several exterior surfaces meet: finishing one part while leaving the nearby work for later can make the result feel disconnected.

Our scope included a double-layer tear-off in the siding work area. Removing those layers was the planned first step, not something to cover with another course of boards. A homeowner comparing siding proposals might focus on the new material alone; here, removal and surface preparation were part of what made the installation workable. We also accounted for trim and the garage-facing details before the crew arrived.

What did we assess before choosing the exterior materials?

We inspected the home and began the estimate on May 13, 2024. The siding section needed removal, new boards, and trim; the project also included Pella door work. For an Austin exterior that sees 100°+ summer days, fiber cement gave us a practical material for the planned siding section.

We chose the primed Select Cedar Mill boards with a Sherwin Williams painted finish. Primed siding still needs that finish step; it is not the same as a fully painted wall. The 8.25-inch board size and 4-inch trim gave the crew defined materials for the field and its edges. Those details are easy to miss if you look only at a siding sample instead of the full scope.

How did we plan the siding, doors, and paint together?

The homeowner approved the project on June 5, 2024. We planned the tear-off, siding section, Pella door work, and painting as parts of the same exterior job. That let the crew address the garage door jambs and adjacent finishes within the on-site window.

  • The scope included a permit fee for the Adirondack project.
  • A delivery charge was included for materials going to the home.
  • Garage door jamb wrapping was listed as a double-jamb detail.
  • Sherwin Williams SuperPaint was specified for the siding paint work.

What happened during the four days on site?

The crew began installation on September 30 and finished on October 3. We handled the planned tear-off before installing the new siding section and trim. Door work and paint were also part of those four days; this was not a same-day siding installation.

  • The removal scope called for both tear-off and double-layer tear-off work.
  • Primed Select Cedar Mill boards went into the siding portion of the project.
  • The painting scope included the garage doors, not just the new siding.
  • Two yard cleanups and final punch items were included in the finishing work.

Why do the trim and garage details matter?

Four-inch James Hardie trim gave the siding section its defined edges. We also wrapped the garage door jambs, where an unfinished transition would stand out beside fresh paint. Those are separate tasks from setting the main siding boards, and each affects how the worked-on areas read from the street.

  • The siding material was fiber cement, while the Pella work was a separate door service.
  • The garage doors received paint; the project did not call for garage door replacement.
  • The finishing scope included punch-out work after the main installation tasks.
  • Austin's cedar pollen can collect on exterior surfaces, so keeping painted areas clean remains part of normal upkeep.

What was finished by October 3?

The crew completed its on-site work on October 3, 2024. The result combined new siding, door work, wrapped jambs, and painted surfaces in one project. For the homeowner, the key difference was not one isolated upgrade but a more unified finish across the areas we worked on.

  • The siding section used the selected James Hardie boards and matching trim scope.
  • Sherwin Williams paint covered the specified siding and garage door work.
  • The final scope included yard cleanup and punch items.
  • The completed job covered siding, doors, and exterior painting in Adirondack.

Straight Answers

Questions About This Project

Does a double-layer tear-off mean new siding goes over the old layers?

No. This project's removal scope called for a double-layer tear-off before the new siding section was installed. Covering those layers would not have followed the planned approach.

How long was the crew at this Austin home?

The on-site window ran from September 30 through October 3, 2024. Earlier inspection and approval dates were part of planning, not four extra months of installation.

Were the garage doors replaced too?

No garage door replacement was part of this job. The crew painted the garage doors and wrapped their jambs as part of the exterior scope.

What was the overall project value range?

The siding, door, and painting project fell in the $20k–$25k range. That range covers the combined work, rather than a price for siding alone.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment