
Completed May 2026
Siding in Great Hills, Austin, TX
Plus Exterior Painting, Gutters on the same job
We re-clad a Great Hills home in Austin with James Hardie HardiePlank fiber cement siding, then followed with 5-inch seamless aluminum gutters. The result is a fresh, sealed exterior built to handle Central Texas heat and hail.
- Trades
- Siding, Exterior Painting, Gutters
- Location
- Great Hills, Austin, TX
- Completed
- Brands installed
- James Hardie, Sherwin Williams
Standout outcome — A warp-proof front elevation with seamless gutters hung in a single day
Timeframe — Siding began May 5; punch and gutters wrapped May 25, 2026
Job APS-4781
Drag to Compare
Before & After


Scope of Work
What We Did
James Hardie HardiePlank Select Cedar Mill Siding Installation · 5-Inch Seamless Aluminum Gutters with Debris Screens
Siding
This Austin siding project used James Hardie HardiePlank Select Cedar Mill in an 8.25" board width. Fiber cement holds up far better than wood against 100°-plus summers, hail, and cedar pollen buildup. Our crew wrapped the garage door jambs, sided the front, sides, and back, then painted the boards and porch ceiling with Sherwin Williams Super Paint. The finished exterior looks like real cedar without the warping or rot older 1980s and 2000s homes often see.
Learn more about our siding replacement →Exterior Painting
Gutters
This Austin gutter install featured 5" Senox seamless aluminum gutters fitted right after the new siding was done. Seamless runs limit leaks, which matters on Central Texas limestone soil that shifts when water pools near the foundation. We added 3" x 4" downspouts for the single-story roofline and standard gutter screens to block cedar pollen and leaf clogs. The whole gutter system went in cleanly in one day.
Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
March 17, 2026The homeowner found Austin Pro through an internet search and reached out on March 17, 2026. That first conversation focused on tired front siding and a plan to stop the repaint cycle for good.
Evaluation
We inspected the front elevation and found sun-faded boards, soft spots from moisture, and debris packed around the garage jamb. Those findings shaped the scope: full re-clad in fiber cement plus a fresh gutter system.
Planning & approval
April 4, 2026We walked through James Hardie profiles, the Select Cedar Mill look, and a Sherwin Williams Super Paint finish. The homeowner approved the retail project on April 4, 2026, with siding, paint, and gutters bundled together.
Installation
Siding began May 5 and ran several days, with the double garage door jamb wrapped to seal a known weak point. Paint followed on the siding, fascia, soffit, and porch ceiling. The gutter crew then hung 5-inch seamless aluminum runs and downspouts in a single day.
Completion
May 25, 2026Punch items and two yard cleanups wrapped on May 25, 2026, followed by a final walkthrough. The job closed out June 15, 2026, with James Hardie's product warranty in place.
17 Photos
Project Photos
Every photo is this job, shot on site by our crew in Great Hills, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Great Hills home need new siding?
Older homes around Great Hills often carry original wood or engineered siding that gives out after two decades of Texas sun. Heat, hail, and swelling from summer storms take a real toll. This homeowner wanted a fix that would stop the cycle of repainting and patching.
- Neighborhood: 78759, a pocket of aging homes near the Balcones canyonlands
- Homeowner found us through an internet search and reached out on March 17, 2026
- Approved for work on April 4, 2026
- Retail project in the $20k–$25k range
What did the crew find on site?
When we pulled the old cladding, the front elevation showed the usual North Austin story: sun-faded boards and soft spots where moisture had crept behind the paint. Cedar pollen and grit had also packed into gaps around the garage, which speeds up rot on wood trim. We wrapped the double garage door jamb to seal that weak point for good. Trim details like this get skipped by rushed crews, and that's exactly where the next leak starts. Sealing the jamb before new siding goes up is the difference between a ten-year job and a two-year callback.
What materials did we use, and why?
We chose James Hardie HardiePlank in the 8.25" Select Cedar Mill profile because fiber cement handles Austin conditions that wood can't. It won't swell in humidity, won't feed termites, and holds paint through 100-degree summers. The Cedar Mill texture gives you the look of real wood grain without the upkeep.
- Boards arrived primed, then finished on site with Sherwin Williams Super Paint
- Fascia and soffit painted up to 24 inches for a clean, matched edge
- Porch ceiling painted to tie the whole front together
- Siding install ran multiple days, with paint following before punch
How did the gutter install go?
Once the siding and paint cured, we brought in the gutter crew and finished the whole system in one day. We ran 5-inch seamless aluminum gutters on the front, right, left, and back of the home. Fewer seams means fewer places for water to sneak through over the years.
- 3" x 4" downspouts sized for a single-story roof to move water fast during hard rain
- Standard gutter screens installed across all runs
- Screens keep cedar pollen and oak leaves from clogging the system
- Materials sourced through local suppliers including ABC and Southern Shingles
What were the results?
The home now has a sealed, low-maintenance front that will hold up to hail and heat for decades. We completed punch items and two yard cleanups on May 25, 2026. Everything got a final walkthrough before we called it done.
- Double garage jamb wrapped and sealed against moisture
- Full-perimeter gutter system draining away from the limestone-heavy soil
- Project closed out on June 15, 2026
Straight Answers
Questions About This Project
Why is fiber cement better than wood siding in Austin?
Fiber cement doesn't swell, crack, or rot the way wood does under our heat and sudden storms. It also resists hail and holds paint far longer, which cuts down on repaint cycles.
How long did the whole project take?
Siding work started May 5 and ran several days, followed by paint. Gutters went up in a single day once the siding was complete, with punch finished May 25, 2026.
What does a project like this cost?
This retail job fell in the $20k–$25k range. Final pricing depends on your home's size, the elevations covered, and gutter footage.
Why add gutter screens?
Great Hills sits near heavy cedar and oak cover, so debris builds up fast. Screens keep the runs clear and stop overflow that can undermine soil around the foundation.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address










