Completed February 2025
Windows in Davenport Ranch, Austin, TX
Plus Doors, Exterior Painting on the same job
We installed windows and completed doors and exterior painting at a Davenport Ranch home in Austin, TX. The finished project included new window groups, door work, and painted exterior surfaces.
- Trades
- Windows, Doors, Exterior Painting
- Location
- Davenport Ranch, Austin, TX
- Completed
- Brands installed
- NT Windows, Provia, Sherwin Williams
Standout outcome — The window plan included both three-window and two-window field-mulled groups.
Vendors and product — NT Windows Twinsulator windows, Provia doors, and Sherwin Williams paint.
Window material — Aluminum frames, plus wood trim at windows set in siding.
On-site timeframe — February 9–10, 2025; two days.
Job APS-4318
Drag to Compare
Before & After


Scope of Work
What We Did
NT Twinsulator Aluminum-Framed Windows with Field-Mulled Groups · Coordinated Provia Door Work and Sherwin Williams Exterior Painting
Windows
We installed NT Windows Twinsulator aluminum-framed windows in Davenport Ranch, Austin. Several windows needed field mulling, and those set in siding received wood trim. The entry window required scaffolding, so access was part of the installation plan. Closed-cell spray foam and caulk completed the window installation details.
Learn more about our window replacement →Doors
We completed Provia door work as part of this Davenport Ranch exterior project. The door selection accompanied new windows and Sherwin Williams exterior painting. Coordinating those trades kept the related work within the same two-day site visit. The Provia door work was finished by February 10, 2025.
Exterior Painting
Exterior Painting in Austin was one part of this three-service Davenport Ranch project. The painting portion used Sherwin Williams products. It was coordinated with new aluminum-framed windows and Provia door work. The crew finished its on-site work on February 10, 2025.
Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what windows typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
August 21, 2024The homeowner reached out on August 21, 2024, after a past customer referred us. The conversation led to an evaluation of window work alongside doors and exterior painting.
Evaluation
September 25, 2024We inspected the Davenport Ranch home and began the estimate on September 25, 2024. The window plan accounted for field-mulled groups, wood trim at windows in siding, and scaffolding for the entry window.
Planning & approval
October 31, 2024The homeowner approved the project on October 31, 2024. The plan brought together NT Windows Twinsulator aluminum-framed windows, Provia door work, and Sherwin Williams exterior painting.
Installation
The crew worked on site February 9–10, 2025. Window tasks included joining two groups in the field, installing wood trim at siding openings, and using scaffolding to reach the entry window. Door work and exterior painting were also part of the two-day project.
Completion
February 10, 2025The crew finished on-site work on February 10, 2025. The completed exterior project included installed windows with their planned trim and joined groups, plus Provia door work and Sherwin Williams painting.
3 Photos
Project Photos
Every photo is this job, shot on site by our crew in Davenport Ranch, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
How did this Davenport Ranch project take shape?
The homeowner reached out on August 21, 2024, after a past customer referred us. We inspected the home and began the estimate on September 25, then received approval on October 31. Those planning dates came well before the February installation.
- A window technician’s measurement was part of the window scope.
- The project brought three trades together: windows, doors, and painting.
- The approved window work included a separate delivery allowance.
- The crew completed its on-site work on February 10, 2025.
What did the window inspection tell us to plan for?
The window work was more involved than setting individual units into openings. Our scope called for three windows to be mulled together in the field and another group of two to be joined the same way. That meant the crew had to account for assembled window groups, not just count openings. At the entry window, scaffolding was included so installers could reach the work area.
Windows set in siding also needed wood trim installed around them. That detail matters on a home exterior because the finished edge must work with the surrounding siding, not simply cover the gap. A homeowner comparing window proposals could miss that difference if one price covers the units but leaves out trim and access. Here, both the siding trim and entry-window scaffolding were part of the planned work.
Why use these window materials and installation methods?
We used NT Twinsulator aluminum-framed windows for the window portion of this Austin project. The scope paired them with OSI closed-cell spray foam, installation materials, and caulk. Foam belongs around the installed window, where the opening meets the frame; it is not a substitute for setting the window correctly. In Austin’s 100°+ summers, those small installation details deserve as much attention as the window selection.
The scope also included clear caulk for black or dark bronze window applications. Sealant choice should follow the frame detail rather than default to a contrasting color. For windows surrounded by siding, wood trim provided a planned finish at that transition. The crew also had OSI foam cleaner in the materials list, a practical detail for working with spray foam during installation.
How did the two-day window installation work?
The crew worked on site from February 9 through February 10, 2025. That was a two-day installation window, not a same-day window replacement. The field-mulled groups and elevated entry window each had their own place in the work.
- Standard-size window installation covered units up to 132 united inches under the scope.
- Scaffolding provided access for the entry window.
- Installers joined a three-window group and a separate two-window group in the field.
- The window scope included installation labor, delivery, and debris disposal.
How did the doors and painting fit alongside the windows?
Provia door work and Sherwin Williams exterior painting were part of the same Davenport Ranch project. We coordinated those trades with the window installation during the February 9–10 site window. The door scope identifies the vendor but does not specify a door model or material, so the window product details should not be applied to the doors.
- Provia supplied the door portion of the project.
- Sherwin Williams supplied the paint used for exterior painting.
- Door work was a separate service from the NT Windows installation.
- The painting portion added another exterior trade to the completed job.
What was finished by February 10?
By February 10, the crew had finished the on-site window, door, and exterior painting work. The completed window scope included installed aluminum-framed units, joined window groups, and trim where windows met siding. For this home, the result was a coordinated exterior project rather than three unrelated site visits.
- The homeowner found us through a past-customer referral before the work began.
- Window access planning accounted for the entry location.
- Provia doors and Sherwin Williams paint were included alongside the primary window service.
Straight Answers
Questions About This Project
Did the project take from August to February to install?
No. The homeowner first contacted us on August 21, 2024, and approved the project on October 31. On-site installation ran only from February 9 to February 10, 2025.
Why did some windows need field mulling?
The NT Windows scope called for one three-window group and one two-window group to be joined in the field. That is different from installing every window as a separate unit and needs to be included in the labor plan.
What was the project’s budget range?
The combined windows, doors, and exterior painting project fell in the $40k–$50k range. That range covers this specific Davenport Ranch scope, including items such as entry-window scaffolding and siding trim.
Was a door model or warranty specified?
Provia was the door vendor, but no door model or warranty terms are specified for this project. Ask for the selected door’s product details and applicable warranty terms before comparing it with another Austin door proposal.
Get Your Free Windows Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Doors
Windows
WindowsOther work near this address