Schedule Appointment
James Hardie
Sherwin Williams

Recent Project: Austin | South Austin | Siding | 08-19-25 | APS-4498

James Hardie HardiePlank Select Cedar Mill Fiber Cement Siding Replacement | Full Exterior Repaint in Sherwin Williams SuperPaint

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

This South Austin project used James Hardie HardiePlank Select Cedar Mill siding in the 8.25" profile. The fiber cement boards came pre-primed and ready for a durable field-applied finish. We chose Hardie because it resists warping, rot, and hail damage common in the 78745 area. The finished siding gave the home a straight, uniform look built for decades of Texas weather.

Learn More About Our Siding
Gutters to a House

Exterior Painting

Sherwin Williams

We painted the new siding with Sherwin Williams SuperPaint after the boards were installed and primed. The coating locks in color and shields the fiber cement from harsh UV and heat. SuperPaint was picked for its fade resistance and clean, even coverage. The exterior now reads as one crisp, finished surface across the whole home.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through an internet search and reached out on April 20, 2025. They were dealing with aging exterior siding on their South Austin home and wanted a lasting fix rather than another repaint. We set up a visit to look at the exterior in person.

Evaluation

During the on-site assessment, we inspected the full exterior in the 78745 area. The home's structure was sound, but the original wood siding had reached the end of its life after years of Texas heat and moisture. We recommended a full siding section replacement in James Hardie fiber cement rather than a surface repair.

PLanning & Approval

We walked the homeowner through material options, the 8.25" Select Cedar Mill profile, and the Sherwin Williams SuperPaint finish. The project was approved on May 21, 2025. Materials were coordinated through ABC Supply and Gtown Lumber and Supply ahead of the start.

Installation

The crew began the siding phase in late July, removing the old boards and installing pre-primed HardiePlank Select Cedar Mill. The paint phase started August 6 with a full field coat of Sherwin Williams SuperPaint. Two rounds of yard cleanup kept the site tidy throughout.

Completion

We completed the punch list on August 19, 2025, confirming clean lines, sealed seams, and even paint coverage across the exterior. The home now has a durable, uniform exterior built for Central Texas weather.

Siding in South Austin, Austin | Austin Pro

We re-sided a South Austin home in the 78745 area with James Hardie HardiePlank Select Cedar Mill and finished it in Sherwin Williams SuperPaint. The old exterior came off, new fiber cement went up, and the home now stands ready for years of Central Texas weather.

Project at a glance

  • Services: Siding and exterior painting
  • Location: South Austin, Austin, TX (78745)
  • Vendor & product: James Hardie HardiePlank Select Cedar Mill
  • Material: 8.25" pre-primed fiber cement lap siding
  • Finish: Sherwin Williams SuperPaint
  • Timeframe: Siding began late July, paint on August 6, punch done August 19, 2025
  • Standout outcome: A straight, uniform exterior that shrugs off heat, hail, and cedar pollen

Why did this South Austin home need new siding?

Homes in 78745 tend to date from the 1980s through the early 2000s. Their original wood siding takes a beating here. Between 100-degree summers, spring hail, and swings in humidity, wood cups, splits, and holds paint poorly over time.

  • Old boards showed the wear you'd expect for the home's age
  • Wood movement in the heat had opened seams and edges
  • The homeowner wanted a fix that would last, not another repaint on failing boards

What did we find during the inspection?

We walked the whole exterior before quoting anything. The bones of the home were solid, but the siding itself had reached the end of its service life. That's a common story in this part of Austin. A quick repaint would have looked fine for a season, then the same problems would surface again.

The smarter move was a full siding section replacement, not a patch. Fiber cement solves the root issue instead of hiding it. It doesn't feed moisture the way aging wood does, and it holds a paint finish for far longer. The homeowner agreed once we walked through the trade-offs on site.

What materials did we use, and why?

We went with James Hardie HardiePlank in the Select Cedar Mill texture, 8.25 inches wide. Fiber cement is built for exactly this climate. It won't warp under extreme heat, it resists hail impact, and it stands up to the moisture swings that wreck wood.

  • 8.25" Select Cedar Mill boards for a clean, wood-grain look
  • Boards arrived pre-primed, which speeds a strong paint bond
  • Delivery handled through ABC Supply and Gtown Lumber and Supply
  • Fiber cement resists the rot and pest issues that plague older wood siding

The Cedar Mill texture matters here. It gives you the warmth of real wood grain without the maintenance headache. That was the look the homeowner wanted to keep.

How did the paint phase go?

After the siding went up, we moved into painting on August 6. We used Sherwin Williams SuperPaint over the primed boards for a tough, even finish. The pre-primed surface let the coating grip cleanly and cover in a consistent tone.

  • Full field coat of SuperPaint across all new siding
  • Applied after install so seams and edges were fully sealed
  • SuperPaint chosen for its UV and fade resistance under the South Austin sun

Color holding power is the whole point in this climate. The Austin sun bleaches cheaper coatings fast. SuperPaint buys the homeowner far more years between repaints.

How did the timeline come together?

Siding work started in late July and ran a few days. Painting followed on August 6. We wrapped the punch list on August 19, 2025, which is when the project invoiced and closed out.

  • Two rounds of yard cleanup paired with the punch items
  • Final punch-out walkthrough confirmed clean lines and full coverage
  • Approved back on May 21 after the spring inspection

Frequently asked questions

Why is fiber cement siding a good fit for Austin?

It handles the extremes here. Our 100-plus degree summers, sudden hail, and cedar pollen all wear down wood siding quickly. Fiber cement doesn't warp, rot, or feed pests, so it lasts far longer with less upkeep.

How long did this South Austin project take?

The active siding and paint work spanned late July through mid-August. The final punch was completed on August 19, 2025.

What did this siding and painting project cost?

This job fell in the $10k–$15k range. Final pricing depends on the size of the home, the siding profile, and the paint scope. We give every homeowner a firm number after an on-site look.

Do you paint the siding right after installing it?

Yes. We install the pre-primed Hardie boards first, then apply the Sherwin Williams finish coat once everything is sealed. Painting after install protects every seam and edge from the start.

GAF shingle roofGAF Master Elite Certificate

HERE sOME OF THE PROJECT IMAGES

After image
Before image
Before
After
No items found.