James Hardie Siding & Windows in Spicewood At Bullcreek, Austin — completed project by Austin Pro

Completed January 2025

Siding in Spicewood At Bullcreek, Austin, TX (January 2025)

Plus Windows, Exterior Painting on the same job

We replaced siding, installed eight windows, and painted the exterior of a home in Spicewood At Bullcreek, Austin, TX. The work brought the new siding and surrounding painted surfaces into one clean, finished exterior.

Trades
Siding, Windows, Exterior Painting
Location
Spicewood At Bullcreek, Austin, TX
Completed

Standout outcome — Eight new windows and finished siding formed two coordinated phases of exterior work.

Vendors and products — James Hardie JH 8.25-inch Smooth siding and NT Windows Twinsulator windows.

On-site timeframe — Windows went in November 25, 2024; siding and paint ran January 27–30, 2025.

Job APS-4296

Scope of Work

What We Did

James Hardie JH 8.25-inch Smooth Fiber Cement Siding · Eight NT Windows Twinsulator Aluminum Window Replacements

Siding

This Siding in Austin, TX project included tear-off, wall sheathing, and new James Hardie fiber cement siding. We used JH 8.25-inch Smooth boards for a clean profile suited to the home's exterior. Fiber cement was a practical choice for an Austin home exposed to long, hot summers. Sherwin Williams paint completed the siding finish.

James HardieJH 8.25" SmoothFiber Cement Siding$15k–$20k
Learn more about our siding replacement →

Windows

The Windows in Austin, TX portion used NT Windows Twinsulator aluminum windows. We coordinated the window work with the new siding so both parts of the exterior could be completed together. Aluminum frames provided the specified material for this home. The finished project brought the window and siding updates into one four-day installation.

NT WindowsTwinsulatorAluminum Windows$5k–$10k
Learn more about our window replacement →

Exterior Painting

Exterior Painting in Austin finished the new siding and other specified surfaces. Sherwin Williams Super Paint was selected for the siding. The scope also covered fascia and soffit areas up to 24 inches. Gutters and downspouts were included in the paint work.

Learn more about our exterior house painting →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

September 16, 2024

The homeowner reached out on September 16, 2024, after a James Hardie referral. We discussed the siding work and the windows they wanted replaced at their Spicewood At Bullcreek home.

Evaluation

September 19, 2024

We inspected the home and began the estimate on September 19, 2024. The siding plan accounted for tear-off and wall sheathing, while the window portion covered eight replacements. We also included paint work on the siding and nearby exterior surfaces.

Planning & approval

October 11, 2024

The homeowner approved the project on October 11, 2024. We planned for James Hardie JH 8.25-inch Smooth siding, NT Windows Twinsulator aluminum windows, and Sherwin Williams SuperPaint. The windows were ordered on October 20 and received on November 7.

Installation

November 25, 2024

We installed the eight windows on November 25, 2024, in a separate one-day visit. The siding and paint crew worked from January 27 through January 30, 2025. Their scope included tear-off, wall sheathing, new siding, painting, and final cleanup.

Completion

January 30, 2025

The crew finished on-site work on January 30, 2025. The home had its eight replacement windows, new fiber cement siding, and painted exterior details in place. Final cleanup and punch items were included before the crew left.

10 Photos

Project Photos

Every photo is this job, shot on site by our crew in Spicewood At Bullcreek, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

What did we assess at this Spicewood At Bullcreek home?

The homeowner came to us through a James Hardie referral on September 16, 2024. We inspected the home and began the estimate on September 19. The proposed siding work involved more than fastening new boards over the existing exterior: it included tear-off and wall sheathing. That distinction matters on an Austin home, where a neat finish depends on what sits behind the visible siding, not just the paint color you see from the street.

  • The removal scope included a double-layer tear-off, so we planned for more than a single layer of existing material.
  • The estimate covered siding and windows as separate trades rather than treating new windows as part of a siding-only job.
  • Painting extended beyond the siding to fascia, soffit, gutters, and downspouts.

Why use smooth fiber cement siding here?

We used JH 8.25-inch Smooth fiber cement siding for the replacement. Its smooth face set a clear direction for the exterior, while the planned paint work tied it to the home's other finished surfaces. In Austin's 100°+ summers, material choice matters, but the backing matters too. A homeowner comparing siding bids could miss the difference between a scope that addresses wall sheathing and one that covers the old wall without addressing it.

  • The sheathing scope specified 7/16-inch OSB, a detail worth checking when you compare proposed work.
  • Primed 8.25-inch smooth boards were included in the siding materials before the finish coat.
  • The project also called for primed Select Cedar Mill material in the exterior scope; the main siding selection remained smooth.
  • Sherwin Williams SuperPaint was specified for the new siding finish.

When were the windows installed, and how did the later work proceed?

The homeowner approved the project on October 11, 2024. We ordered the NT Windows Twinsulator units on October 20, received them on November 7, and installed them on November 25. That window visit was one day; it was not the start of the four-day siding and paint installation in January. Keeping those dates separate gives you a more useful picture of the time crews spent at the house.

  • The window portion involved eight aluminum units, not a whole-home window replacement.
  • Siding and paint work began on-site January 27 and continued through January 30.
  • The siding scope included tear-off, new boards, wall sheathing, and finish work across that later visit.
  • Two yard cleanups and punch items were part of the final work, not a substitute for the main installation.

What did the exterior painting cover?

The exterior painting work gave the replacement siding its finished color. We also addressed nearby surfaces so the new boards would not sit beside visibly unfinished trim. That mattered here because the paint scope reached beyond one wall material; it included several parts you notice together when you look at the house.

  • Fascia and soffit painting was included up to 24 inches, a defined limit in this project's scope.
  • Gutters and downspouts were included by length rather than assumed to be part of the siding boards.
  • Siding paint used Sherwin Williams SuperPaint after the primed material was in place.
  • The crew's final punch work covered remaining finish items before leaving the site on January 30.

What was finished by January 30?

The crew finished its on-site siding and painting work on January 30, 2025. By then, the November window installation and the later exterior work were both complete. The result was not just a new siding surface: the project brought the window replacement, wall work, and painted details together without calling the earlier planning period installation time.

  • The finished exterior paired smooth James Hardie siding with the eight NT Windows units installed earlier.
  • Painted fascia, soffit, gutters, and downspouts supported a consistent look around the new boards.
  • The January siding-and-paint visit lasted four on-site days, from the 27th through the 30th.

Straight Answers

Questions About This Project

Did this project replace every window in the house?

No. The window scope covered eight NT Windows Twinsulator aluminum units. It did not call for a whole-home window replacement.

How long did the siding installation take?

The siding and paint crew worked on-site from January 27 through January 30, 2025. The earlier November 25 window visit was a separate installation day, not part of that four-day window.

What was the project's price range?

The combined siding, windows, and exterior painting project fell in the $30k–$40k range. That range reflects all three services, not a price for siding alone.

Why check the tear-off and sheathing details in a siding proposal?

This scope included double-layer tear-off and 7/16-inch OSB wall sheathing. Those details tell you whether a proposal accounts for work behind the finished James Hardie boards, where a simple exterior photo cannot show the difference.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment