
Completed January 2025
Windows in Springwoods, Austin, TX (January 2025)
We installed windows in Springwoods, Austin, TX, using NT Windows Presidential vinyl replacements. The two-day job finished with new white windows, sealed installation gaps, and stone mortar repair.
- Trades
- Windows
- Location
- Springwoods, Austin, TX
- Completed
- Brands installed
- NT Windows
Standout outcome — The window work included repair to the surrounding stone mortar.
Vendor and product — NT Windows Presidential
On-site timeframe — January 13–14, 2025; two days
Job APS-4317
Scope of Work
What We Did
21 NT Windows Presidential Vinyl Replacement Windows · Three-Day Installation with Stone Mortar Repair
Windows
This Windows in Austin, TX project used NT Windows Presidential vinyl replacement windows. White interiors and exteriors kept the finish consistent on both sides. Vinyl offers a low-maintenance frame choice for a home facing Austin’s long, hot summers. The two-day installation included sealing and stone mortar repair around the window work.
Learn more about our window replacement →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what windows typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
September 19, 2024The homeowner reached out on September 19, 2024, after a referral from a past customer. We discussed the requested window replacement and arranged to look at the Springwoods home.
Evaluation
September 23, 2024We inspected the home and began the estimate on September 23, 2024. The window scope called for technician measurements and included stone mortar repair around the installation work.
Planning & approval
October 29, 2024The homeowner approved the project on October 29, 2024. The selection was NT Windows Presidential vinyl replacement windows with white interiors and exteriors. We planned for delivery, installation materials, labor, and disposal.
Installation
January 14, 2025The crew worked at the home from January 13 through January 14, 2025. They installed the replacement windows and used the specified foam and white caulk around the installation. Stone mortar repair was also part of the work.
Completion
January 14, 2025The crew finished on January 14, 2025. The completed project included the new white vinyl windows, sealing materials, and stone mortar repair. No measured energy savings or separate labor warranty was established for this job.
4 Photos
Project Photos
Every photo is this job, shot on site by our crew in Springwoods, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
How did this Springwoods window project begin?
The homeowner reached out to Austin Pro on September 19, 2024, after a referral from a past customer. Our first step was to learn about the requested window replacement, not to assume every opening needed the same treatment. In Austin, many homes from the 1980s through the 2000s have details around their windows that deserve a close look before anyone orders replacements.
- The request was for windows only; this project did not include siding, roofing, or doors.
- The Springwoods location placed the work in northwest Austin’s 78729 ZIP code.
- The homeowner contacted us months before the crew’s January installation dates.
What did we check before ordering the replacement windows?
We inspected the home and began the estimate on September 23, 2024. The scope also called for a window technician to measure the openings. That matters because a replacement window must fit the opening in front of us, not a size assumed from the age or style of the house. The work included stone mortar repair, so the surrounding finish had to be part of the installation plan rather than an afterthought. The project details do not establish the condition of every opening, and we would not treat them all as identical without measuring.
- The labor scope covered installation of standard-size windows up to 132 united inches.
- United inches add a window’s width and height; the limit describes an installation category, not the measured size of every unit here.
- Window cost and installation labor were both included in the replacement scope.
Why use Presidential vinyl windows on this home?
The selected product was the Presidential vinyl replacement window, finished white on both the room side and the exterior. Vinyl gives the homeowner a frame material that does not need painting, a practical consideration through Austin’s 100°+ summers. Color matters, too: choosing white on both sides kept the specification clear for the windows being ordered and installed. We did not treat the product choice as a promise about energy savings or hail resistance; neither was measured on this job. The more immediate task was to pair the selected windows with a sound fit and properly finished edges.
- The project called for Sherwin Williams Power House 60-year white caulk.
- Closed-cell spray foam and foam cleaner were included among the installation materials.
- The scope identified Presidential as the NT Windows product, rather than leaving the line unspecified.
What happened between the estimate and installation?
The homeowner approved the project on October 29, 2024. We then had an agreed window selection and a scope that covered the units, delivery, installation materials, and labor. That approval date was not the start of work at the house; the crew came on site in January.
- The selected interior color was white.
- The exterior color was also white.
- Delivery was included so the replacement units could be brought to the project.
- The plan accounted for disposal after the old windows came out.
A replacement-window schedule includes more than the days you see a crew at your home. Measurements, selection, and the approved scope came first on this Springwoods job. Those steps should not be counted as installation days, even though they shaped what the crew would do once the windows arrived.
How did the two-day window installation go?
The crew began on January 13 and finished on January 14, 2025. Installation covered the replacement units and the materials used around their openings. Foam and caulk served different parts of that work: the closed-cell foam addressed installation gaps, while the white caulk provided a finish at visible joints. Neither product makes a poorly sized window fit, which is why the technician’s measurements mattered before the crew started.
- Window installation labor was part of the on-site work.
- Stone mortar repair was included alongside the window installation.
- The project scope provided for removal and disposal of job debris.
The January dates describe two days of work at the home, not a single-day swap. That distinction is useful if you are planning access to rooms during a window project. This scope involved both interior-facing finishes and exterior work, so the homeowner had more to plan around than a delivery appointment.
What was the finished result for this Austin home?
The crew finished the window project on January 14. The homeowner had Presidential replacements with matching white finishes inside and out, plus the sealing and mortar work included in the installation. Those are the results this project supports; it does not include a measured change in utility bills or indoor temperature.
- The completed service was windows, with no second exterior trade on this job.
- Both the window units and their surrounding installation materials were part of the finished scope.
- The final on-site date was the second day of the January installation window.
Straight Answers
Questions About This Project
Did the September visit count as an installation day?
No. We inspected the home and started the estimate in September, but the window crew worked on site for two days in January. For scheduling your own replacement project, keep planning time separate from days when installers need access to the house.
Does white vinyl mean these windows are hail-proof?
No such claim was established for the Presidential windows on this project. Hail is a real Austin concern, but the documented choice here was a vinyl replacement window with white finishes, not a tested hail-performance result.
What does “60-year” mean on the caulk listed for this job?
It is part of the Sherwin Williams Power House caulk’s product description. It should not be read as a 60-year warranty on the windows, the labor, or the entire Springwoods installation.
What was the approximate project value?
The overall project was in the $15,000–$20,000 range. That range covered this home’s window scope; it is not a price per window or a quote for another house.
Get Your Free Windows Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Windows
Windows
WindowsOther work near this address










