Completed April 2025
Siding & Exterior Painting in Woods Of Brushy Creek, Austin, TX (April 2025)
We replaced siding and completed exterior painting at a home in Woods Of Brushy Creek, Austin, TX. New fiber cement siding, painted brick, and finished trim brought the exterior work together.
- Trades
- Siding, Exterior Painting
- Location
- Woods Of Brushy Creek, Austin, TX
- Completed
- Brands installed
- James Hardie, Sherwin Williams
Standout outcome — The siding replacement was paired with painting across several other exterior surfaces.
Timeframe — April 13–16, 2025; four days of on-site work.
Neighborhood and city — Woods Of Brushy Creek, Austin, TX 78717.
Vendor and product — James Hardie Select Cedar Mill siding and Sherwin Williams SuperPaint for the siding.
Job APS-4389
Drag to Compare
Before & After


Scope of Work
What We Did
James Hardie 7.25-Inch Select Cedar Mill Fiber Cement Siding · Sherwin Williams Siding Paint and Two-Coat Brick Painting
Siding
This Siding in Austin, TX project included wall sheathing and James Hardie fiber cement siding. The crew used the 7.25-inch Select Cedar Mill profile, a primed material ready for the planned paint work. Fiber cement was a practical choice for an exterior exposed to Austin's intense summer heat. Garage door jamb wraps and removal of a half-round window completed the siding-related scope.
Learn more about our siding replacement →Exterior Painting
This Exterior Painting in Austin, TX project covered siding, brick, fascia, soffit, gutters, and downspouts. Sherwin Williams SuperPaint was specified for the new siding. The brick scope called for a sealer or primer coat before two paint coats. Painting these surfaces together gave the home's updated exterior a coordinated finish.
Learn more about our exterior house painting →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
December 31, 2024The homeowner found Austin Pro through an online search and reached out on December 31, 2024. The conversation began a siding and exterior painting project in Woods Of Brushy Creek; installation was still months away.
Evaluation
January 8, 2025We inspected the home on January 8, 2025, and began the estimate. The scope included wall sheathing, siding, garage door jamb wraps, removal of a half-round window, and paint work across several exterior surfaces.
Planning & approval
February 15, 2025The homeowner approved the project on February 15, 2025. The plan specified James Hardie 7.25-inch Select Cedar Mill fiber cement siding and Sherwin Williams SuperPaint for the siding, along with a separate coating sequence for the brick.
Installation
April 16, 2025The crew was on site from April 13 through April 16, 2025. Over those four days, the work covered sheathing, siding, garage door jamb wraps, and exterior painting. An electrician was also included in the project scope.
Completion
April 16, 2025The crew finished its on-site work on April 16, 2025. The scope included punch-out items and two yard cleanups alongside the completed siding and painting work.
5 Photos
Project Photos
Every photo is this job, shot on site by our crew in Woods Of Brushy Creek, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Woods Of Brushy Creek project include more than new siding?
The planned work reached beyond the main wall surfaces. It included garage door jamb wraps, removal of a half-round window, and paint work on brick and roofline trim. Those details matter on a siding job: a newly finished wall can still look incomplete if the surfaces beside it are left out.
- The garage door scope called for both a standard jamb wrap and a double jamb wrap.
- The fascia and soffit painting scope covered sections up to 24 inches wide.
- Gutters and downspouts were included by linear foot, rather than treated as part of the siding area.
The homeowner found us through an online search and reached out on December 31, 2024. We inspected the home and began the estimate on January 8, 2025. That visit gave us a way to plan the siding and paint work as one exterior project, well before the crew arrived in April.
What went behind the James Hardie siding?
The siding scope included wall sheathing and 7/16-inch OSB, not just visible boards. We accounted for that layer while planning the wall work, then used primed 7.25-inch Select Cedar Mill fiber cement siding for the finish surface. A homeowner comparing siding bids could easily focus on the profile alone and miss the sheathing listed behind it. Here, both belonged in the plan.
- Select Cedar Mill provided the specified textured face; the 7.25-inch measurement identified the siding profile.
- The boards were primed before the siding paint work, so the crew was not starting with an unprimed finish surface.
- Fiber cement was a sensible material choice for an Austin exterior that faces 100°+ summer days.
The material choice did not replace careful work around the openings. The scope also called for removing a half-round window and wrapping the garage door jambs. Those areas needed attention alongside the broad siding runs because they interrupt the wall surface and remain easy to see from outside.
How did the four on-site days unfold?
The crew worked from April 13 through April 16, 2025. That was a multi-day siding and painting installation, not a same-day changeover. The work covered sheathing, siding, paint, and detail items; an electrician was also part of the project scope.
- April 13 was the first day of on-site installation, separate from the January inspection.
- The siding scope included both the James Hardie boards and the garage door jamb wraps.
- The painting scope extended beyond the walls to brick and other exterior surfaces.
- April 16 was the last day of crew work at the home.
Exterior work in Austin has to account for changing conditions, including heat, hail, and cedar pollen. We do not treat those conditions as proof of damage at this house. They are reasons to keep material choices and the order of work grounded in what the home actually needs.
What did the exterior painting cover?
Sherwin Williams SuperPaint was specified for the new siding. The brick had its own coating sequence: one sealer or primer coat, followed by two paint coats. That distinction matters because siding and brick are different surfaces, even when both are part of the same exterior painting project.
- Fascia and soffit sections were included where the specified width was up to 24 inches.
- Gutters and downspouts were separate line items measured by length.
- The scope also allowed for painting other specified exterior surfaces by area.
Planning the brick coats separately from the siding paint helped keep the work clear. A single phrase such as “paint the exterior” would not tell you that the brick called for three coating steps. The detailed scope made that difference visible before installation began.
Which small details mattered at the end?
This project included two yard cleanups and punch items, not only the main installation tasks. We also had a separate punch-out scope for the last details. On a job involving siding, brick paint, and gutter paint, those finishing steps deserve their own attention.
- The half-round window removal was part of the exterior scope, rather than a window replacement project.
- Garage door jamb wrapping addressed a defined opening beside the new siding.
- An electrician was included among the trades for the job; no electrical changes are assumed here.
The crew finished on April 16. The completed scope combined new wall material with paint on the siding and other listed surfaces. For this homeowner, the result was one coordinated exterior project instead of separate siding and painting visits.
Straight Answers
Questions About This Project
When did the homeowner approve the work?
The homeowner approved the project on February 15, 2025. Installation began on April 13, so the weeks between approval and on-site work were not counted as installation days.
Why pair fiber cement siding with painting in Austin?
This job specified primed James Hardie siding and Sherwin Williams SuperPaint for the siding finish. Pairing the two let us plan the new wall surface and its paint work together for this Austin home.
What was the project value range?
The combined siding and exterior painting project fell in the $25,000–$30,000 range. That range covers this home's scope, including sheathing, multiple painted surfaces, and finishing details; it is not a price for every siding job.
Was a warranty or later follow-up included?
The project scope identifies punch-out work and two yard cleanups, with on-site work finished April 16, 2025. For warranty terms or later follow-up on this project, ask Austin Pro to confirm the applicable details.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address