James Hardie Siding & Exterior Painting in Block House Creek, Leander — completed project by Austin Pro

Completed September 2026

Siding & Exterior Painting in Block House Creek, Leander, TX

We replaced siding and completed exterior painting on a home in Block House Creek, Leander, TX. The result brought new wall surfaces and several surrounding exterior details into one coordinated finish.

Trades
Siding, Exterior Painting
Completed

Standout outcome — The siding work and paint finish addressed the walls and selected features around them.

Vendors and products — James Hardie Select Cedar Mill 8.25-inch siding and Sherwin Williams SuperPaint

On-site timeframe — September 26–29, 2026; four days

Job APS-4915

Drag to Compare

Before & After

After: James Hardie siding & exterior painting completed in Block House Creek, Leander
Before the siding & exterior painting project — home exterior in Block House Creek, Leander
Before
After

Scope of Work

What We Did

James Hardie Select Cedar Mill Fiber Cement Siding with Wall Sheathing · Sherwin Williams SuperPaint Exterior Finish Across Siding and Selected Trim

Siding

This siding project in Leander, TX, included wall sheathing, gable work, and new James Hardie fiber cement boards. We used the Select Cedar Mill 8.25-inch profile to give the home a defined wood-grain look. Fiber cement was a practical choice for exterior walls exposed to Central Texas heat. The completed work brought the siding and its surrounding details into one planned exterior update.

James HardieSelect Cedar Mill 8.25"Fiber Cement Siding$10k–$15k
Learn more about our siding replacement →

Exterior Painting

This exterior painting project in Leander, TX, followed the siding installation. We used Sherwin Williams SuperPaint exterior paint on the new boards. The scope also included selected trim areas, doors, gutters, downspouts, and the porch ceiling. Painting those surfaces together gave the finished exterior a more consistent appearance.

Sherwin WilliamsSuperPaintExterior Paint$2k–$5k
Learn more about our exterior house painting →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

October 17, 2019

The homeowner returned to Austin Pro for another project and reached out on October 17, 2019. The initial conversation concerned siding and other exterior work at the Leander home.

Evaluation

October 17, 2019

We inspected the home on October 17, 2019, and began the estimate. The resulting scope accounted for siding, wall sheathing, a gable vent opening, and exterior painting.

Planning & approval

July 24, 2026

The plan specified James Hardie Select Cedar Mill fiber cement siding and Sherwin Williams SuperPaint for the paint work. The homeowner approved the project on July 24, 2026, before the on-site installation began.

Installation

September 29, 2026

The crew worked on site from September 26 through September 29, 2026. Over those four days, the work covered wall sheathing, siding, gable details, and painting. The scope also included wrapping the double garage-door jamb and installing shutters and gable vents.

Completion

September 29, 2026

The crew finished on-site work on September 29, 2026. Yard cleanups and punch-out items were part of the finishing scope. The completed project paired the new siding with paint on the specified exterior surfaces.

6 Photos

Project Photos

Every photo is this job, shot on site by our crew in Block House Creek, Leander, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

How did this Block House Creek exterior project take shape?

The homeowner had worked with us before and reached out again on October 17, 2019. We inspected the home and began an estimate that same day. The homeowner approved the siding and painting project on July 24, 2026. Those early dates describe the conversation and planning, not time spent installing materials at the house.

The approved work went beyond fastening new boards to the walls:

  • Wall sheathing was part of the siding scope, so the work accounted for what sat behind the finished surface.
  • The plan called for removing and framing in a gable vent opening, rather than treating that area as a simple paint detail.
  • A 3-by-5-foot Galvalume chimney cap was also included among the exterior items.

Why did the wall beneath the new siding matter?

A siding job needs a sound, suitable surface behind the visible boards. This project included 7/16-inch OSB wall sheathing, which we had to account for before the finished siding could go on. A homeowner may focus on the cedar-look face and miss that part of the work. In Leander's 100°+ summers, it makes little sense to plan the outer finish while overlooking how the wall assembly goes together.

The openings and edges needed their own attention:

  • The gable vent work involved framing the opening, not just placing a vent over existing siding.
  • Installing shutters and gable vents was included in the exterior scope.
  • The garage area called for wrapping a double garage-door jamb, a detail separate from replacing the garage door.

What siding did we choose for this Leander home?

We used primed Select Cedar Mill fiber cement siding for the wall finish. Its wood-grain face gave the homeowner the look specified for this project, while the primed surface fit the planned painting work. Fiber cement was a sensible material to use on these exposed walls; that choice does not remove the need to get the sheathing, openings, and paint details right.

A few specifications shaped the installation:

  • The selected boards had an 8.25-inch profile, which set the pattern across the sided areas.
  • The scope listed both the primed boards and the finished siding work, so painting was part of the planned result.
  • Material delivery was included before the crew could put the wall components in place.

Which parts of the exterior did we paint?

The painting was not limited to the new siding. We used SuperPaint on the siding and included other specified surfaces so the fresh wall finish did not stop abruptly at nearby features. That matters on a Block House Creek home where older exterior surfaces remain next to newly installed boards.

The paint scope identified several distinct areas:

  • Fascia and soffits, in areas listed up to 24 inches
  • Doors included in the exterior paint work
  • Gutters and downspouts, measured by linear foot
  • The porch ceiling

How did the four on-site days come together?

The crew worked from September 26 through September 29, 2026. Siding, wall details, and painting all belonged to that multi-day visit; this was not a same-day replacement. The crew also had finishing tasks to handle after the main installation, rather than treating the last board as the end of the job.

Those final tasks were part of the scope:

  • Two yard cleanups were listed alongside the punch items.
  • A separate punch-out step covered remaining finish details.
  • The crew finished its on-site work on September 29.

What did the finished work accomplish?

This project updated more than the broad wall areas. The siding, painted surfaces, framed opening, and garage-jamb detail were handled as parts of the same exterior job. For a Leander homeowner planning similar work, that is the useful distinction: the visible boards are only one part of the scope you should review.

The completed plan had clear boundaries:

  • The primary service was siding; exterior painting was the second service.
  • The work covered specified exterior features, not a whole-house interior renovation.
  • Shingle and metal roofing replacements were not part of this project, despite the chimney-cap item.

Straight Answers

Questions About This Project

Why are the first inspection and installation dates so far apart?

The homeowner first contacted us, and we inspected the home, on October 17, 2019. Approval came on July 24, 2026. The project details do not establish a reason for that gap, so it should not be counted as installation time.

What was the overall project value range?

The combined siding and exterior painting work fell in the $15,000–$20,000 range. That range covers this project's scope; it is not a price for every Block House Creek home.

Did the garage door itself get replaced?

No garage-door replacement was included. The listed work addressed the double garage-door jamb wrap, which is the trim area around the opening.

Was this only a siding-board replacement?

No. The scope also included 7/16-inch OSB wall sheathing, vent work, paint, and a Galvalume chimney cap. If you are comparing siding plans, check those supporting items instead of comparing board names alone.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5