Schedule Appointment
NT Windows
Pella

Recent Project: Austin | Belvedere | Windows & Doors | 10-18-24 | APS-4236

Full-Home NT Windows Executive Series Replacement | Oversized Window & Custom Frame Expander Install

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Windows

NT Windows

This Belvedere project swapped out aging windows for the NT Windows Executive series, built in Texas for Texas weather. We handled both standard openings and oversized units greater than 132 united inches, along with a door install and a frame expander. The Executive line's insulated glass cuts heat gain during 100-degree Austin summers. The result is a quieter, more comfortable home with cleaner sightlines and tighter seals.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner reached out to Austin Pro on July 30, 2024, through a customer referral passed along by one of our salesmen. That first conversation focused on replacing aging windows across the Belvedere home. Referral leads like this usually mean the homeowner already trusts the process going in.

Evaluation

We walked the home to measure every opening and check the condition of the existing units. The crew found a mix of standard windows and several oversized openings greater than 132 united inches. One opening didn't match a stock size, which flagged the need for a frame expander later on.

PLanning & Approval

The project was approved on August 13, 2024, and moved into the prospect stage the same day. We finalized the NT Windows Executive selection and confirmed the scope, including a door and the frame expander.

Installation

Windows were ordered in late August and arrived by late September. Installation ran over several days in early October, wrapping up on October 18, 2024. The crew handled disposal of the old units, set the oversized windows carefully, fit the frame expander, and hung the new door.

Completion

We closed out the project on October 31, 2024, after confirming every opening sealed cleanly. The home now blocks far more heat and glare, with tighter frames throughout. The homeowner ended up with a quieter, cooler house ready for the next Austin summer.

Windows in Austin | Austin Pro

We replaced every window in a Belvedere home off Brittany Point Lane with the NT Windows Executive line, added a new door, and fit a frame expander where an opening didn't match standard sizing. The home now blocks far more summer heat and glare than its original glass ever did.

Project at a glance

  • Service: Full-home windows replacement, plus one door
  • Where: Belvedere neighborhood, Austin, TX 78738
  • Vendor & product: NT Windows Executive series
  • Material: Vinyl-framed insulated glass, several units over 132 united inches
  • Timeframe: Approved mid-August, installed over several days in early October, closed October 31, 2024
  • Standout outcome: Tighter seals and lower heat gain across every room

Why did this Belvedere home need new windows?

The original windows had aged past their useful life. Belvedere sits west of the city where afternoon sun hits hard, and old glass lets that heat pour right in.

The homeowner came to us through a customer referral in late July. That kind of lead tells you a lot — people don't refer window jobs unless they're happy with the result.

  • Lead came in July 30, 2024 via a salesman referral
  • West-facing rooms took the worst of the Hill Country afternoon sun
  • Older seals had started to fail, letting in outside air
  • Value range for the full project landed between $40k and $50k

What did the crew find during the walkthrough?

Most of the openings were standard, but a few weren't. Several units came in over 132 united inches, which changes both the product order and the labor. Big windows carry more weight and need more careful support during the swap.

We also found one opening that didn't match a stock size. Rather than force a smaller window and leave a gap, we planned a frame expander to fill it cleanly. Skipping that step is a common mistake — a poorly sized window looks off and leaks air around the edges. The expander lets the new unit sit true in the wall, sealed on every side. That detail matters most in Austin, where summer heat finds any weak point in a home's envelope.

  • Mix of standard openings and oversized units past 132 UI
  • One opening required a custom frame expander
  • A door replacement was folded into the same scope
  • Full disposal of the old windows handled by our crew

Why the NT Windows Executive line?

We chose the NT Windows Executive series because it's built in Texas, for Texas conditions. That's not a small thing. Local production means shorter lead times and glass rated for the heat load we actually see here.

The Executive line uses insulated glass that slows heat transfer during 100-degree stretches. The vinyl frames won't warp, rot, or fade the way older materials do under constant UV. For a west-facing Belvedere home, that combination keeps interior rooms cooler and cuts strain on the AC through the long summer.

  • Executive series insulated glass units built for high heat gain
  • Vinyl frames resist warping under strong Central Texas UV
  • Texas-based manufacturing kept the order timeline tight
  • Same product used for both standard and oversized openings

How did the install go?

We ordered the windows in late August and received them by late September. Install ran over several days in early October, wrapping on October 18, 2024.

Oversized units always take longer to set safely, and this home had a handful. Our crew pulled the old windows, prepped each opening, set the frame expander where needed, and sealed everything against air and water.

  • Windows ordered late August, delivered late September
  • Installation spread across multiple days in early October
  • Oversized units set with extra support and sealing time
  • New door hung and adjusted as part of the same visit

What were the results?

The home feels tighter and quieter, with cleaner sightlines through fresh glass. Every opening now seals properly, including the one that once needed the expander.

The biggest change shows up in comfort during peak heat. Rooms that used to bake in the afternoon now hold their temperature far better.

  • Reduced heat gain across west-facing rooms
  • Consistent seals on every replaced opening
  • Improved sound dampening from the outside
  • Project formally closed October 31, 2024

Frequently asked questions

How long did the whole project take from start to finish?

The lead came in on July 30 and got approved on August 13, 2024. From there we ordered, waited on delivery, and installed in early October — with the file closed by month's end.

Are NT Windows a good fit for Austin weather?

Yes. The Executive line's insulated glass and vinyl frames are made to handle the region's brutal summer sun and temperature swings. Building the product in Texas also means it's spec'd for local conditions.

What is a frame expander, and why did this home need one?

A frame expander fills the gap when a wall opening is larger than a standard window size. It lets the new unit sit centered and fully sealed, instead of leaving a sloppy edge that leaks air.

What did a full-home window replacement like this cost?

This project fell in the $40k to $50k range. That reflects a whole home of windows, several oversized units, a door, disposal, and the custom frame expander work.