Completed September 2026
Windows in East Oak Hill, Austin, TX (September 2026)
Plus Siding, Gutters, Exterior Painting on the same job
We installed seven windows and updated the siding at a home in East Oak Hill, Austin, TX. The finished exterior pairs black window frames with cedar-look fiber cement siding, plus new gutters and exterior paint.
- Trades
- Windows, Siding, Gutters, Exterior Painting
- Location
- East Oak Hill, Austin, TX
- Completed
- Brands installed
- NT Windows, James Hardie, Sherwin Williams
Standout outcome — Seven windows now share a black interior and exterior finish.
Vendors and products — NT Windows Twinsulator; James Hardie 8.25-inch Select Cedar Mill; Sherwin Williams SuperPaint.
On-site timeframe — September 11–14, 2026; four days from installation start to finish.
Job APS-4813
Drag to Compare
Before & After


Scope of Work
What We Did
Seven Black-Finish NT Windows Twinsulator Aluminum Windows · James Hardie 8.25-Inch Select Cedar Mill Fiber Cement Siding
Windows
For this Windows in Austin, TX project, we installed NT Windows Twinsulator aluminum windows. The scope included window installation, technician measurements, and work at a wide patio-door opening. Black interior and exterior frames kept the selections consistent across the openings. The aluminum frames fit the homeowner’s chosen look while the installation addressed each opening’s listed size.
Learn more about our windows →Siding
For this Siding in Austin, TX project, we used James Hardie 8.25-inch Select Cedar Mill fiber cement. The cedar-grain profile gave the homeowner a wood-look siding option. Fiber cement was a practical choice for an exterior exposed to Austin’s long, hot summers. Exterior painting and gutter work were also part of the coordinated project.
Learn more about our siding →Gutters
This Gutters in Austin project included seamless aluminum gutters. Aluminum was the specified gutter material. Sherwin Williams SuperPaint appeared in the related exterior painting scope, not as a gutter product. The gutter work was coordinated with the home’s windows, siding, and painting.
Learn more about our gutters →Exterior Painting
This Exterior Painting in Austin project specified Sherwin Williams SuperPaint. Painting was included as a separate service in the four-day exterior update. The work accompanied fiber cement siding, new windows, and seamless gutters. Its inclusion addressed painted exterior surfaces as part of the combined scope.
Learn more about our exterior painting →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what windows typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
April 27, 2026The homeowner found us through an online search and reached out on April 27, 2026. We discussed an exterior project centered on windows and siding, with gutters and painting also included.
Evaluation
We inspected the East Oak Hill home on April 28 and began the estimate. The window scope called for a technician measurement, and we accounted for both standard window labor and a wider sliding patio door opening.
Planning & approval
May 6, 2026The homeowner approved the project on May 6, 2026. The selections included seven black-interior, black-exterior NT Windows Twinsulator units and James Hardie Select Cedar Mill siding. An order for the seven windows followed on May 14.
Installation
September 14, 2026On-site installation ran from September 11 through September 14, 2026. The crew worked across the window and siding scope, which also included interior trim at a wide sliding patio door opening. Gutters and exterior painting were part of the four-day exterior project.
Completion
September 14, 2026The crew finished on-site work on September 14, 2026. The completed scope included black-framed windows, fiber cement siding, seamless aluminum gutters, and exterior painting. No later service visit or specific warranty terms are stated for this project.
6 Photos
Project Photos
Every photo is this job, shot on site by our crew in East Oak Hill, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
How did the East Oak Hill window project begin?
The homeowner found us through an online search and reached out on April 27, 2026. We visited the next day to inspect the home and start an estimate. That early visit mattered because the work involved more than choosing a window style: the siding, paint, and gutters also needed a place in the plan.
- The homeowner approved the project on May 6, well before the September installation.
- An order for seven windows was placed on May 14.
- The window scope called for black on both sides of each frame.
- A technician measurement was included before installation labor.
An approval date and an installation date answer different questions. For this home, the spring decisions came first; the on-site work ran across the September dates shown above. If you are planning several exterior trades at once, that distinction helps you set a realistic calendar without counting product ordering as crew time at your house.
What did the window measurements tell us?
The window scope included technician measurements and an aluminum-window labor category for units up to 120 united inches. That figure describes an installation category; it does not tell you the dimensions of every window in the home. We also planned labor for a 5- or 6-foot-wide sliding patio door, including interior trim, plus a knock-down door assembly. Those separate lines matter because a wide door opening is not handled like a standard window opening.
A homeowner could easily read one size range and assume every opening was the same. It would be a mistake to do that here. The seven ordered windows and the wider door-related work had distinct installation requirements, so we treated the measurements and labor descriptions separately. We cannot turn a labor category into a claim about an exact opening size or the condition of the surrounding wall.
Why use these windows and siding in Austin?
The selected Twinsulator units have aluminum frames, while the siding uses James Hardie's 8.25-inch Select Cedar Mill fiber cement profile. Black on both sides of the windows keeps the frame color consistent when viewed indoors or outside. The siding offers a cedar-look surface without calling for natural cedar boards. That is a useful distinction in Austin, where 100°+ summer days put exterior material choices under close scrutiny.
Material choice still needs to match the actual project, not a broad claim about every house in Central Texas. This homeowner's plan paired seven aluminum windows with a specific fiber cement siding profile. Neither the product name nor the siding texture tells you how the home performed before installation. Hail is a real concern in Austin, but this project does not establish hail damage or a hail-resistance rating for the finished exterior.
How did the four days of on-site work run?
The installation window began September 11 and ended when the crew finished on September 14, 2026. We coordinated window and siding work as a multi-day exterior project, not a same-day replacement. The scope also included door-related labor, installation supplies, and a dump fee.
- Window labor covered aluminum units in the listed size category.
- The wider sliding patio door labor included interior trim installation.
- Door labor separately accounted for assembling a knock-down door.
- Delivery and disposal were included alongside the installation work.
Those items help explain why a combined project takes more planning than a count of seven windows suggests. The door opening brings its own trim task, and the siding is a separate trade. The four-day window describes on-site work; it does not include the months between the homeowner's first call and the crew's arrival.
What else was included in the exterior update?
Seamless aluminum gutters and SuperPaint exterior painting were also part of this East Oak Hill project. They served different purposes: the gutters provide a path for roof runoff, while paint finishes exterior surfaces. Sherwin Williams was the specified paint vendor; that does not mean SuperPaint was the material used to make the gutters.
- The gutter material was seamless aluminum.
- The named paint product was Sherwin Williams SuperPaint.
- Siding was the secondary service, alongside the primary window work.
- Doors appeared in the installation scope, though they were not a listed primary or secondary service.
Around Austin, drainage deserves attention even when the main project is windows and siding. Limestone soil is common in the area, but this project does not document a soil or drainage problem at the home. Likewise, cedar pollen is familiar to local homeowners; it is a reason to think about exterior upkeep, not proof of a problem we found here.
What was finished by September 14?
The crew completed its on-site work on September 14. The result brought seven black-framed windows together with the selected cedar-look siding, seamless aluminum gutters, and exterior paint. Each material has a defined role, so the finished project is more useful to describe by its actual parts than by a promise about performance we did not test.
- The window product was NT Windows Twinsulator in aluminum.
- The siding profile was 8.25-inch Select Cedar Mill fiber cement.
- The exterior paint selection was SuperPaint.
- The completed on-site window ran from Friday through Monday.
If you are comparing a similar project for an aging Austin home, look past the headline service. Ask which openings need technician measurements, whether door trim is included, and how siding and paint fit into the same schedule. Those were practical scope questions on this job, and answering them makes the installation plan easier to understand.
Straight Answers
Questions About This Project
Did the installation take from April until September?
No. The homeowner reached out in April and approved the project in May, but the crew's on-site window was September 11–14. The earlier dates cover inspection, planning, and the window order—not months of installation.
Was this only a window replacement?
No. The listed services also included fiber cement siding, seamless aluminum gutters, and exterior painting. The scope separately identified work at a wide sliding patio door opening.
What was the project's cost range?
The overall project fell in the $20,000–$25,000 range. That covers a mix of exterior services, so it should not be read as a price for seven windows alone.
Is there a documented warranty or follow-up visit?
The supplied scope names the products and records the September 14 completion, but it does not specify a warranty term or a follow-up visit. Ask for the terms that apply to each selected product before comparing coverage.
Get Your Free Windows Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5
Keep Exploring
More Austin Pro Work
Windows
Windows
WindowsOther work near this address