Holiday Savings

10% off every exterior project, and it stacks up to 25% off.10% off exterior projects

43 days leftSee the deals
Simonton Windows & Siding in Brodie Lane, Austin — completed project by Austin Pro

Completed February 2025

Windows in Brodie Lane, Austin, TX (February 2025)

Plus Siding, Doors on the same job

We replaced the windows and completed siding work at a home in Brodie Lane, Austin, TX. The work also included an entry door, stone mortar repair, and a painted finish on the new siding.

Trades
Windows, Siding, Doors
Location
Brodie Lane, Austin, TX
Completed
Brands installed
Simonton, James Hardie, Pella

Standout outcome — The homeowner could move ahead with the windows, then wait until February for the siding work.

Timeframe — Windows went in over three days starting November 12, 2024. The final on-site siding and paint window ran February 4–7, 2025.

Vendor and product — Simonton Daylight Max windows, James Hardie JH 8.25-inch Select Cedar Mill siding, and a Pella entry door.

Job APS-4220

Drag to Compare

Before & After

After: Simonton windows & siding completed in Brodie Lane, Austin
Before the windows & siding project — home exterior in Brodie Lane, Austin
Before
After

Scope of Work

What We Did

Simonton Daylight Max Vinyl Window Replacement with Stone Mortar Repair · James Hardie Select Cedar Mill Fiber Cement Siding and Paint

Windows

We removed the existing windows and installed Simonton Daylight Max vinyl replacement windows. Vinyl offers a low-maintenance choice for Windows in Austin, TX, where summer temperatures often top 100°. The window scope also included stone mortar repair and haul-off. The finished openings brought the window work and surrounding masonry together.

SimontonDaylight MaxVinyl Replacement Windows$10k–$15k
Learn more about our window replacement →

Siding

We installed James Hardie JH 8.25" Select Cedar Mill fiber cement siding on this Brodie Lane home. Fiber cement was a practical choice for an Austin exterior exposed to long, hot summers. Its cedar-mill texture gave the siding a distinct finish. The work complemented the project's replacement windows and Pella entry door.

James HardieJH 8.25" Select Cedar MillFiber Cement Siding$30k–$40k
Learn more about our siding replacement →

Doors

The Doors in Austin portion of this project called for a Pella entry door. We included it in the same exterior plan as the windows and siding. The completed door work formed part of the four-day on-site project. No specific door model was provided.

PellaEntry Door$2k–$5k
Learn more about our door replacement →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what windows typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

July 13, 2023

The homeowner found us through an online search and reached out on July 13, 2023. The conversation began around exterior work that would ultimately include windows, siding, and an entry door.

Evaluation

July 17, 2023

We inspected the Brodie Lane home on July 17, 2023, and started the estimate. The window scope included removing existing units, installing replacements, and repairing stone mortar.

Planning & approval

July 28, 2024

The homeowner approved the project on July 28, 2024. We ordered the Simonton windows on August 7, and they arrived on November 7. The homeowner chose to hold the siding work until February.

Installation

November 12, 2024

The window crew installed the replacements over three on-site days starting November 12, 2024. We returned for the siding phase from February 4 through February 7, 2025, installing and painting the siding during that four-day window. The overall project also included a Pella entry door.

Completion

February 7, 2025

The crew finished its on-site work on February 7, 2025. By then, the home had its Simonton replacement windows and painted James Hardie siding, along with the entry door included in the project.

8 Photos

Project Photos

Every photo is this job, shot on site by our crew in Brodie Lane, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why was this Brodie Lane project done in two parts?

The homeowner wanted to wait on the siding, so we did not force the windows and exterior finish into one visit. That choice shaped the job: the windows were installed first, while the siding and paint followed in February. For a project covering two major exterior surfaces, the schedule needs to reflect when each part actually happened. Calling February the start of the window installation would miss the three days our window crew had already spent at the home in November.

  • The homeowner found us through an online search and reached out on July 13, 2023.
  • We inspected the home and began the estimate on July 17, 2023.
  • The homeowner approved the project on July 28, 2024, before the window order was placed.

What did the window work include beyond new units?

The window scope called for removing the existing units, hauling them off, and installing vinyl replacements. It also included stone mortar repair. That detail matters because window work at a stone opening is not just a matter of setting a new frame in place. You need to account for the surrounding material rather than overlook a repair because it falls outside the window itself. The mortar work was part of this job, not an assumed feature of every replacement project.

  • The Simonton windows were ordered on August 7 and received on November 7, 2024.
  • Installation began November 12 and took three on-site days.
  • The window scope separately included removal, disposal, installation labor, and stone mortar repair.

Why use these materials on an Austin exterior?

Simonton Daylight Max provided the vinyl replacement windows for this home. James Hardie's Select Cedar Mill product provided the fiber cement siding chosen for the later phase. Both choices put material selection ahead of a one-size-fits-all approach, especially on an Austin exterior that faces 100°+ summer days. The siding profile was an 8.25-inch product; that is the specified product size, not a measurement of the home's wall area.

  • Daylight Max is the named window line for the Brodie Lane installation.
  • Select Cedar Mill identifies the siding's finish pattern, while fiber cement identifies its material.
  • A Pella entry door was also included in the project's exterior work.

How did the February installation unfold?

Our crew returned for the siding phase on February 4, 2025, and finished its on-site work on February 7. Installation and painting took place during that four-day window, after the homeowner's requested wait. That distinction matters if you are planning work around your home: the approval date, a material order, and the days a crew is on site are different parts of the schedule.

  • February 7 was the last day of work at the property.
  • The siding was painted as part of the February work, rather than during the November window visit.
  • The entry door was part of the overall project, though no separate door-install date is specified.

What should homeowners take from the finished project?

This Brodie Lane job brought together window replacement, siding, and a Pella entry door without treating them as a single-day installation. The scope also accounted for the less visible work around the windows: old-unit removal and stone mortar repair. If you are comparing exterior projects on an aging Austin home, look past the product names and ask what happens at the openings and how each phase is scheduled.

  • The window installation was complete before the homeowner moved ahead with siding.
  • The final siding phase included paint, so the exterior finish was part of the planned work.
  • The full project covered three services, even though windows and siding were the two main areas of work.

Straight Answers

Questions About This Project

Did the windows and siding go in during the same week?

No. The window crew worked for three days starting November 12, 2024. The homeowner chose a later siding installation, which finished on February 7, 2025.

Does fiber cement siding make sense in Austin's heat?

It was the material selected for the James Hardie siding on this Brodie Lane home. Austin's 100°+ summers make material choice worth discussing, but this project does not establish a measured change in indoor temperature.

What was the budget range for the whole project?

The stated range for the windows, siding, and entry door together was $50k–$60k. The siding was the largest service by value band, followed by the windows and then the door.

Was a warranty or follow-up visit included?

No warranty terms or follow-up visit are specified for this project. If you are considering Simonton windows, James Hardie siding, or a Pella door, ask for the terms that apply to the exact products and installation.

Get Your Free Windows Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment