Recent Project: Austin | Milwood | Siding & Windows | 01-05-23 | APS-3251

Full-Home James Hardie HardiePlank Fiber Cement Siding with Paint | NT Presidential Double-Hung Window Replacement Throughout

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

This Milwood siding project used James Hardie HardiePlank fiber cement across the full home exterior. Fiber cement resists warping, rot, and hail damage that plague older cladding in Central Texas. We installed the siding over two days, then applied paint to seal and finish the job. The result is a durable, low-maintenance exterior built for Austin weather.

Learn More About Our Siding

Windows

NT Windows

We paired the siding work with NT Presidential double-hung window replacements from NT Windows. These vinyl units help block heat gain during long triple-digit summers. Our crew installed the windows across four days, squaring and sealing each opening. The homeowner gained tighter, quieter, more efficient windows throughout.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through an internet search and reached out in March 2022. The lead came in on March 10, 2022, and we opened an early conversation about a full exterior refresh for their Milwood home.

Evaluation

Our team assessed the home's aging exterior and dated windows. We measured every window opening for replacement units and reviewed the wall cladding for a full re-side. The findings pointed to a complete envelope upgrade rather than spot repairs.

PLanning & Approval

We built a scope combining James Hardie HardiePlank siding with NT Presidential double-hung windows. The project was approved on April 1, 2022, and windows were ordered April 20, 2022. Material selections and paint were locked in during this phase.

Installation

Window delivery was delayed by COVID-era manufacturer backlogs until October 4, 2022. Our crew installed the windows over four days starting November 6, then set the siding over two days in mid-December. Paint followed shortly after the siding went up.

Completion

We completed a punch-out walkthrough in early January, with on-site work finishing January 5, 2023. The home was invoiced the next day and the file closed February 7, 2023. The homeowner received a durable, weather-ready exterior.

Siding in Austin | Austin Pro

We re-clad a Milwood home in Austin, TX with James Hardie fiber cement siding and installed new NT Presidential double-hung windows throughout. The result is a tougher, tighter exterior built for Central Texas heat and hail.

Project at a glance

  • Services: Siding and windows
  • Location: Milwood neighborhood, Austin, TX (78727)
  • Vendor & product: James Hardie HardiePlank siding; NT Windows Presidential double-hung units
  • Material: Fiber cement siding with full paint; vinyl replacement windows
  • Timeframe: Windows set over 4 days starting Nov 6, 2022; siding over 2 days in mid-December; punch-out early January 2023
  • Standout outcome: A low-maintenance exterior that shrugs off 100°+ summers, hail, and moisture

Why did this Milwood home need new siding and windows?

Many Milwood homes date to the 1980s and 1990s, and their original exteriors show it. This home's old cladding and windows were tired, drafty, and no match for Austin weather. The homeowner wanted a full refresh that would last decades, not a patch job.

  • Original windows leaked air and let in summer heat
  • Old siding showed wear from years of sun and storms
  • Goal: a unified, durable exterior in one coordinated project

What did we find when we inspected the home?

Our evaluation confirmed the exterior was ready for a complete overhaul. The window openings needed careful measuring so the new NT units would sit square and seal tight. Central Texas homes fight two enemies at once: relentless summer heat and sudden hail. Both punish cheap materials fast. We planned the scope to address the whole envelope so the homeowner would not revisit these issues in a few years.

  • Full exterior walls slated for new siding
  • Every window opening measured for replacement units
  • Paint scheduled as a sealing step, not an afterthought

What materials did we use, and why?

We chose James Hardie HardiePlank fiber cement for the walls. Fiber cement is the right call for Austin because it does not warp in triple-digit heat and it resists hail far better than vinyl or old wood. It also holds paint well and stands up to moisture and pests. That combination means fewer callbacks and a longer service life. For the windows, we installed NT Presidential double-hung units, a vinyl line that helps block solar heat gain and cuts down on drafts.

  • HardiePlank fiber cement: hail-resistant and non-combustible
  • Factory-grade paint applied on site by our crew
  • NT Presidential double-hung windows: energy-efficient vinyl frames
  • Paint materials sourced through Sherwin Williams

How did the installation go?

The windows came first. Our crew set them over four days starting November 6, 2022, working opening by opening to keep each unit square and sealed. Supply timing was a real factor here, which we cover below.

  • Windows ordered April 20, 2022; received October 4, 2022
  • Window install: 4 on-site days from Nov 6
  • Siding install: 2 days in mid-December, paint following shortly after
  • Punch-out walkthrough completed early January 2023

How did COVID-era delays affect the timeline?

This project ran long, and the reason matters. The windows were ordered in April 2022 but did not arrive until October, thanks to manufacturer backlogs that hit the whole industry during that period. We kept the homeowner informed the entire time rather than starting work we could not finish. Once materials landed, the on-site pace was steady and predictable. Patience on the front end let us do the job right instead of rushing around missing parts.

  • Roughly six months between order and delivery on windows
  • No siding started until windows were in hand
  • Sequenced work to avoid rework and wasted trips

What were the results?

The home now wears a clean, durable James Hardie exterior with fresh paint and efficient new windows. On-site work wrapped by January 5, 2023, with invoicing the next day. The homeowner ended up with an exterior built to handle whatever Central Texas throws at it.

Frequently asked questions

How long did the project take?

On-site work spanned several phases. Windows went in over four days in early November, siding took two days in mid-December, and paint and final punch-out wrapped by early January 2023.

Why is fiber cement siding a good choice for Austin?

HardiePlank fiber cement resists warping in extreme heat and holds up to hail better than vinyl or wood. It also fights moisture, rot, and pests, which means far less upkeep over the years.

What did this project cost?

This retail project fell in the $30,000 to $40,000 range. That reflected full-home siding, paint, and a complete set of NT Presidential windows.

Why did the windows take so long to arrive?

The units were ordered in April 2022 but arrived in October due to COVID-era manufacturer delays.