Completed January 2023
Siding & Windows in Milwood, Austin, TX (January 2023)
We re-clad a Milwood home in Austin, TX with James Hardie fiber cement siding and installed new NT Presidential double-hung windows throughout. The result is a tougher, tighter exterior built for Central Texas heat and hail.
- Trades
- Siding, Windows
- Location
- Milwood, Austin, TX
- Completed
- Brands installed
- James Hardie, NT Windows
Standout outcome — A low-maintenance exterior that shrugs off 100°+ summers, hail, and moisture
Timeframe — Windows set over 4 days starting Nov 6, 2022; siding over 2 days in mid-December; punch-out early January 2023
Job APS-3251
Scope of Work
What We Did
Full-Home James Hardie HardiePlank Fiber Cement Siding with Paint · NT Presidential Double-Hung Window Replacement Throughout
Siding
This Milwood project got a full wrap of James Hardie HardiePlank fiber cement siding. We chose fiber cement because it shrugs off 100-degree summers, cedar pollen, and the hail that wears down softer materials. The crew installed it over two days, then handled painting and a careful punch-out. For siding in Austin, TX, fiber cement gives 1980s and 90s homes a tougher, longer-lasting exterior.
Learn more about our siding replacement →Windows
This Milwood home received NT Windows Presidential double-hung vinyl replacement windows. We like NT because it's a Texas manufacturer that builds for our climate, and vinyl frames handle heat and humidity without warping. Supply issues from COVID stretched the wait, so we installed once the units arrived over a four-day window. For window replacement in Austin, TX, these frames cut energy loss and hold up in extreme summer heat.
Learn more about our window replacement →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
March 10, 2022The homeowner found Austin Pro through an internet search and reached out in March 2022. Their request came in on March 10, 2022, and we opened an early conversation about a full exterior refresh for the Milwood home.
Evaluation
Our team assessed the home's aging exterior and dated windows. We measured every window opening for replacement units and reviewed the wall cladding for a full re-side. The findings pointed to a complete envelope upgrade rather than spot repairs.
Planning & approval
April 1, 2022We built a scope combining James Hardie HardiePlank siding with NT Presidential double-hung windows. The project was approved on April 1, 2022, and windows were ordered April 20, 2022. Material selections and paint were locked in during this phase.
Installation
October 4, 2022Window delivery was delayed by COVID-era manufacturer backlogs until October 4, 2022. Our crew installed the windows over four days starting November 6, then set the siding over two days in mid-December. Paint followed shortly after the siding went up.
Completion
January 5, 2023We completed a punch-out walkthrough in early January, with on-site work finishing January 5, 2023. The homeowner received a durable, weather-ready exterior.
6 Photos
Project Photos
Every photo is this job, shot on site by our crew in Milwood, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Milwood home need new siding and windows?
Many Milwood homes date to the 1980s and 1990s, and their original exteriors show it. This home's old cladding and windows were tired, drafty, and no match for Austin weather. The homeowner wanted a full refresh that would last decades, not a patch job.
- Original windows leaked air and let in summer heat
- Old siding showed wear from years of sun and storms
- Goal: a unified, durable exterior in one coordinated project
What did we find when we inspected the home?
Our evaluation confirmed the exterior was ready for a complete overhaul. The window openings needed careful measuring so the new NT units would sit square and seal tight. Central Texas homes fight two enemies at once: relentless summer heat and sudden hail. Both punish cheap materials fast. We planned the scope to address the whole envelope so the homeowner would not revisit these issues in a few years.
- Full exterior walls slated for new siding
- Every window opening measured for replacement units
- Paint scheduled as a sealing step, not an afterthought
What materials did we use, and why?
We chose James Hardie HardiePlank fiber cement for the walls. Fiber cement is the right call for Austin because it does not warp in triple-digit heat and it resists hail far better than vinyl or old wood. It also holds paint well and stands up to moisture and pests. That combination means fewer callbacks and a longer service life. For the windows, we installed NT Presidential double-hung units, a vinyl line that helps block solar heat gain and cuts down on drafts.
- HardiePlank fiber cement: hail-resistant and non-combustible
- Factory-grade paint applied on site by our crew
- NT Presidential double-hung windows: energy-efficient vinyl frames
- Paint materials sourced through Sherwin Williams
How did the installation go?
The windows came first. Our crew set them over four days starting November 6, 2022, working opening by opening to keep each unit square and sealed. Supply timing was a real factor here, which we cover below.
- Windows ordered April 20, 2022; received October 4, 2022
- Window install: 4 on-site days from Nov 6
- Siding install: 2 days in mid-December, paint following shortly after
- Punch-out walkthrough completed early January 2023
How did COVID-era delays affect the timeline?
This project ran long, and the reason matters. The windows were ordered in April 2022 but did not arrive until October, thanks to manufacturer backlogs that hit the whole industry during that period. We kept the homeowner informed the entire time rather than starting work we could not finish. Once materials landed, the on-site pace was steady and predictable. Patience on the front end let us do the job right instead of rushing around missing parts.
- Roughly six months between order and delivery on windows
- No siding started until windows were in hand
- Sequenced work to avoid rework and wasted trips
What were the results?
The home now wears a clean, durable James Hardie exterior with fresh paint and efficient new windows. On-site work wrapped by January 5, 2023. The homeowner ended up with an exterior built to handle whatever Central Texas throws at it.
Straight Answers
Questions About This Project
How long did the project take?
On-site work spanned several phases. Windows went in over four days in early November, siding took two days in mid-December, and paint and final punch-out wrapped by early January 2023.
Why is fiber cement siding a good choice for Austin?
HardiePlank fiber cement resists warping in extreme heat and holds up to hail better than vinyl or wood. It also fights moisture, rot, and pests, which means far less upkeep over the years.
What did this project cost?
This retail project fell in the $30,000 to $40,000 range. That reflected full-home siding, paint, and a complete set of NT Presidential windows.
Why did the windows take so long to arrive?
The units were ordered in April 2022 but arrived in October due to COVID-era manufacturer delays.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address