Completed August 2023
Siding & Windows in Milwood, Austin, TX (August 2023)
We re-clad a 1980s-era Milwood home in James Hardie fiber cement siding and replaced its tired windows and kitchen patio door. The result is a tougher, cooler, better-looking house built for Central Texas weather.
- Trades
- Siding, Windows
- Location
- Milwood, Austin, TX
- Completed
- Project value
- $50k–$60k
- Brands installed
- James Hardie, Simonton
Standout outcome — A hail- and heat-ready exterior with a bright, reworked kitchen entry
Timeframe — Windows in late April, siding in mid-July, painted right after
Job APS-3585
Drag to Compare
Before & After


Scope of Work
What We Did
James Hardie Cedar Mill 8.25" Fiber Cement Siding Installation · Simonton Daylight Max Windows with Reframed Kitchen Patio Door
Siding
This project replaced the exterior with James Hardie HardiePlank Select Cedar Mill 8.25" fiber cement siding. Fiber cement holds up to Austin's 100-degree summers and cedar pollen far better than old wood siding. We installed the primed boards over multiple days, then painted them to finish the look. Homeowners looking for durable siding in Austin, TX get a wood grain texture that resists warping and pests for decades.
Learn more about our siding →Windows
This Milwood home got new Simonton Daylight Max vinyl replacement windows across the house. We ordered them in mid-March and installed once they arrived, working over several days. Vinyl frames resist the heat and cedar pollen that wear on older Austin homes. We also reframed the kitchen opening and set a new 60-by-80-inch sliding patio door for cleaner light and easy access.
Learn more about our windows →Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
The homeowner reached out to us in September 2022 as a returning customer who already knew our work. That trust made the early conversations easy and focused on scope rather than sales.
Evaluation
By late November 2022, we had walked the property and reviewed the aging exterior and windows. We noted weathering typical of a 1980s Milwood home and mapped out both the siding and window replacement needs.
Planning & approval
February 14, 2023The project was approved on February 14, 2023. We finalized the James Hardie profile, the Simonton window package, and the kitchen door reframe, then ordered windows in mid-March.
Installation
Windows arrived in late April and we installed them over multiple days, including the reframed 60" x 80" kitchen slider. At the homeowner's request, we returned in mid-July to install the fiber cement siding over several days and painted shortly after.
Completion
August 10, 2023The full project was completed and invoiced on August 10, 2023. After a final walkthrough of the new exterior and windows, the job closed out in early January 2024.
7 Photos
Project Photos
Every photo is this job, shot on site by our crew in Milwood, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Milwood home need new siding?
The old cladding had taken years of Austin punishment. Summer heat and spring hail leave older exteriors cracked, faded, and warped. This homeowner wanted something that would stop the cycle of repairs.
- Home dates to the 1980s, common for the Milwood area
- Original siding showed weathering typical of decades in 100-degree summers
- The client was a returning customer who trusted our earlier work
- Goal was a low-maintenance exterior, not another patch job
What materials did we use, and why?
We chose James Hardie Primed Select Cedar Mill in the 8.25" width for a reason. Fiber cement does not soften or swell the way wood and older composites do when the thermometer sits above 100. It also stands up to hail and cedar pollen better, so it stays looking clean with far less upkeep. The Cedar Mill texture gives the home a natural wood-grain look without the rot and repainting cycle real cedar demands in this climate. The primed boards let our painters lock in a finish that bonds tight and resists Texas UV.
- 8.25" exposure for clean, modern lap lines
- Fiber cement rated for the freeze-thaw and heat swings of Central Texas
- Primed surface prepped for a full paint finish
- Paint applied by our crew shortly after siding wrapped
What happened with the windows and kitchen door?
We pulled every old window and the kitchen slider, then hauled it all off. The new Simonton Daylight Max windows went in over multiple days in late April. The bigger job was the kitchen: we changed the opening height and width to fit a new 60" wide by 80" tall Alside sliding patio door.
- Full removal and disposal of old windows and doors
- New Simonton Daylight Max units for lower heat gain
- Kitchen opening reframed to 60" x 80"
- Standard sliding patio door install at both 5' and 6' sizes in scope
How did the timeline work?
This job ran on the homeowner's schedule, not ours, and that shaped the pacing. We ordered windows in mid-March and had them by late April, then installed shortly after. The client asked us to hold off on siding until later in the summer, so we returned in mid-July to install the boards over several days and paint right after. Splitting the work this way is unusual, but it let the homeowner manage the project around his own timeline without rushing either trade.
What were the results?
The home now has a sealed, uniform exterior and a brighter, more open kitchen entry. Heat gain is down, the finish is fresh, and there is far less maintenance ahead. Everything was completed and invoiced by August 10, 2023.
- Tighter envelope for cooler summers and lower energy loss
- Reworked kitchen slider that opens the room to the yard
- A painted James Hardie shell that shrugs off hail and UV
- Project value in the $50k–$60k range
Straight Answers
Questions About This Project
Why is fiber cement a good fit for Austin homes?
It handles the extremes Central Texas throws at it. Fiber cement does not warp in triple-digit heat, resists hail impact, and won't rot from moisture the way wood siding can.
How long did the whole project take?
The work was split by choice. Windows arrived in late April and went in soon after, while siding and paint came in mid-July, all completed by August 10, 2023.
Do the new windows help with energy bills?
Yes. The Simonton Daylight Max glass reduces heat gain during long Austin summers, which eases the load on your AC and helps keep indoor temps steady.
What did the kitchen door change involve?
We reframed the existing opening to 60" wide by 80" tall so a new Alside sliding patio door would fit properly. That kind of structural change needs careful framing to keep the header sound.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address