Completed April 2026
Windows in Sette Tierra, Austin, TX
We installed new windows at a home in Sette Tierra, Austin, TX. The result was a completed aluminum window installation across the planned openings.
- Trades
- Windows
- Location
- Sette Tierra, Austin, TX
- Completed
- Brands installed
- NT Windows
Standout outcome — Installation completed for all 26 windows
Timeframe — April 15–16, 2026; two days on site
Neighborhood and city — Sette Tierra, Austin, TX
Vendor and product — NT Windows Twinsulator
Job APS-4744
Drag to Compare
Before & After


Scope of Work
What We Did
26 NT Windows Twinsulator Aluminum Windows Installed · Two-Day Installation Planned for Multiple Window Sizes
Windows
This Windows in Austin, TX project used NT Windows aluminum windows in a Sette Tierra home. The scope covered openings both up to and over 120 united inches. Separate labor categories let us plan for those different installation sizes. The crew completed the on-site work over April 15–16, 2026.
Learn more about our windows →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what windows typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
January 13, 2026The homeowner found Austin Pro through an online search and reached out on January 13, 2026. The conversation focused on window work for the Sette Tierra home.
Evaluation
January 15, 2026We inspected the home and began the estimate on January 15, 2026. The planned installation accounted for aluminum windows both up to and over 120 united inches, along with a technician measure.
Planning & approval
February 24, 2026The homeowner approved the window project on February 24, 2026. The plan called for NT Windows Twinsulator aluminum units, installation materials, and scaffolding.
Installation
The crew worked at the home on April 15 and 16, 2026. Window installation labor covered the two specified size categories, with delivery and scaffolding included in the scope.
Completion
April 16, 2026The crew finished its on-site work on April 16, 2026. The completed project covered 26 windows at the Sette Tierra home.
7 Photos
Project Photos
Every photo is this job, shot on site by our crew in Sette Tierra, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
How did this Sette Tierra window project begin?
The homeowner found Austin Pro through an online search and reached out on January 13, 2026. The request was for window work at a home in Austin’s 78759 area. We arranged an in-person look before settling on the installation plan.
- The scope covered windows only; it did not include siding, doors, or roofing.
- This was an installation project, not a glass-only repair.
- The January conversation came well before any crew work at the house.
- An on-site evaluation gave us a chance to plan around the actual openings rather than assume every window was alike.
That last point matters on a multi-window job. A product choice is only part of the work; the opening sizes and how the crew reaches them shape the installation, too.
What did we check before planning the window installation?
We inspected the home and began the estimate on January 15. The installation scope called for two labor categories: aluminum windows up to 120 united inches and windows over that mark. United inches means a window’s width plus its height, measured in inches. That split told us to plan for different unit sizes rather than treat the house as a run of identical openings.
- A window technician measure was included to check dimensions for the units.
- The scope also accounted for scaffolding, so access was part of the plan.
- Larger units needed their own installation labor category.
- We considered handling and access alongside the window count when preparing the work.
If you are comparing window estimates, count alone will not tell you how the job will go. Twenty-six openings can call for different handling when their sizes vary. On this home, the two size categories and planned access equipment were practical details, not small print.
Why were Twinsulator aluminum windows used here?
The homeowner approved the project on February 24, and the selected units were NT Windows Twinsulator aluminum windows. Aluminum was the specified frame material for this house. I would not judge a window for an Austin home by its product name alone: correct sizing and installation matter during 100°+ summers. That is why the technician measure and size-based labor plan belonged alongside the material selection.
- The approved work covered window installation, not an added exterior service.
- Installation materials were part of the scope, separate from the window units.
- The plan included labor for both stated size categories.
- The February approval happened weeks before the crew’s April visit; that interval was not on-site installation time.
A homeowner might expect every aluminum window to go in the same way. Here, the scope called out a size threshold and access equipment. Those details shaped how we prepared the crew’s work, without making claims about energy performance that the project does not establish.
How did the two-day installation go?
The crew worked at the Sette Tierra home on April 15 and 16. Window installation labor covered the planned units, while scaffolding supported the access plan. We treated the visit as a multi-day installation, not a single-day changeout.
- The first on-site day was April 15.
- The crew finished its work at the house on April 16.
- Delivery was included in the installation scope.
- Installation materials were accounted for alongside the labor.
On a job this size, delivery, access, and fitting each affect the day’s pace. The two dates describe time spent working at the home; they do not include the earlier inspection or the time between approval and installation. Keeping those periods separate gives homeowners a more useful picture of the schedule.
What happened to material removed during the work?
The window scope included a dump fee as well as delivery and installation. That matters because installing new units also calls for a plan for material leaving the site. We included that handling in the work rather than describing the job as windows alone.
- The listed work included a separate windows section and material cost.
- Installation labor was specified for aluminum units in both size groups.
- The crew’s final on-site day was the end of the installation window.
- No siding, painting, or roofing work formed part of this project.
Cedar pollen and dust are familiar parts of life in Austin, but this project was not a cleaning or maintenance visit. Its scope was the installation of aluminum window units. That distinction helps if you are deciding whether you need replacement work or care for windows you already have.
What was the finished result for this Austin home?
By the end of the second on-site day, the planned window installation was complete. The home received NT Windows Twinsulator units across the project scope. For the homeowner, the result was a finished window job, rather than an estimate or a partial first-day installation.
- The completed work was confined to the Sette Tierra property.
- The project involved one trade: windows.
- The installation plan accounted for units on both sides of the 120-united-inch threshold.
- The crew completed the work on site, rather than counting earlier planning days as installation.
Austin homes from the 1980s through the 2000s often prompt questions about exterior updates. This project offers a narrower, useful example: start with the openings, select the specified units, and allow enough on-site time to install the full window scope. The documented result is the completed installation, not a claimed utility-bill change.
Straight Answers
Questions About This Project
What was the project’s price range?
The window project fell in the $30k–$40k range. That range describes this 26-window scope, including installation work; it is not a price per window.
Does the time between approval and installation count as crew time?
No. The homeowner approved the work in February, while the on-site window installation took place in April. Planning and material lead time should not be counted as days spent installing windows at the house.
Why does a technician measure matter on a project like this?
A technician measure helps check dimensions before installing the units. For a job with two window-size labor categories, that check supports a plan based on the actual openings rather than a single assumed size.
Get Your Free Windows Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5
Keep Exploring
More Austin Pro Work
Windows
Windows
WindowsOther work near this address