Schedule Appointment
James Hardie
NT Windows

Recent Project: Austin | Wells Branch | Siding & Windows | 08-12-25 | APS-4488

Complete James Hardie Select Cedar Mill Fiber Cement Siding Installation | Energy-Efficient NT Executive Vinyl Window Replacement

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

We wrapped this 78728 home in 8.25-inch James Hardie Select Cedar Mill fiber cement siding. The crew primed the boards, then finished them in Sherwin Williams SuperPaint for lasting color. Fiber cement was chosen because it resists Austin's brutal heat, hail, and moisture swings without warping. We also painted fascia, soffit, gutters, garage doors, and front pillars for a full exterior refresh.

Learn More About Our Siding

Windows

NT Windows

This project included NT Executive vinyl windows from NT Windows, a Central Texas manufacturer. Vinyl frames handle 100-degree summers without expanding or cracking like older units do. The tighter seals block cedar pollen and lower cooling costs during long Austin summers. Paired with the new siding, the windows finished off a clean, updated look.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through a community webpage and reached out on May 2, 2025. The early conversation focused on aging exterior siding and windows that no longer held up to Central Texas weather. We set up a visit to look over the full exterior.

Evaluation

By May 5 the project moved to the prospect stage after our on-site review. We inspected the existing cladding, trim, fascia, soffit, and windows for wear from sun, hail, and moisture. The findings pointed to full re-cladding and new vinyl windows rather than a surface repaint.

PLanning & Approval

We walked the homeowner through material options and finish choices over the following weeks. James Hardie Select Cedar Mill siding and NT Executive vinyl windows were selected, with Sherwin Williams SuperPaint for the finish. The project was approved on August 5, 2025.

Installation

Crews mobilized on August 12, 2025 and completed the exterior in one day. Work included installing 8.25-inch primed Select Cedar Mill siding, setting the new windows, wrapping garage door jambs, and painting siding, fascia, soffit, gutters, and pillars. Two yard cleanups kept the site tidy through the job.

Completion

We ran a final punch-out to catch every last detail before wrapping up. The home was invoiced on August 12 and formally closed on August 27, 2025. The finished exterior now stands ready for years of Austin heat, hail, and pollen.

Siding & Windows in Wells Branch, Austin | Austin Pro

We replaced the exterior siding and windows on this Austin home in the 78728 area, swapping worn cladding for 8.25-inch James Hardie fiber cement and installing new NT Executive vinyl windows. The whole exterior came together in a single day on August 12, 2025.

Project at a glance

  • Services: Siding and windows
  • Location: Austin, TX (ZIP 78728)
  • Vendors & products: James Hardie Select Cedar Mill fiber cement; NT Windows Executive vinyl
  • Material: 8.25" primed Select Cedar Mill, finished in Sherwin Williams SuperPaint
  • Timeframe: Lead in May, approved August 5, completed August 12, 2025
  • Standout outcome: A full exterior refresh built to shrug off Central Texas heat and hail

Why did this Austin home need new siding?

Homes in this part of Austin were built to last, but the original cladding was showing its age. Sun, hail, and swings in humidity had worn down the surface over the years. The homeowner wanted a material that would hold up better and look sharp for decades.

  • Old siding no longer held paint cleanly
  • Fascia and soffit needed repair and repainting
  • Garage door jambs called for fresh wrapping
  • Front pillars had faded finish

What did the crew find on site?

When we walked the home before the August 12 start, the details told the story. The exterior had taken a beating from years of direct sun and the occasional hailstorm that rolls through Central Texas. Older wood-based trim tends to soak up moisture and swell, and that movement cracks paint long before the color itself gives out. That is exactly what a homeowner would miss if they only repainted without fixing the underlying material. We planned for full re-cladding plus new windows so the fixes would actually last.

What materials did we use, and why?

We clad the home in 8.25-inch James Hardie Select Cedar Mill fiber cement. Fiber cement was the clear pick for this climate. It will not warp in 100-degree summers, and it stands up to hail far better than wood or vinyl siding.

The boards arrived primed, then we finished them in Sherwin Williams SuperPaint for a tough, color-stable coat. Fiber cement also shrugs off the moisture swings that come with Austin's limestone soil and sudden downpours. That mix of durability and low upkeep is why so many local homeowners make the switch.

  • Boards delivered through ABC Supply Co. (plain-text supplier, no direct order needed from you)
  • Cedar Mill texture gives a natural wood grain look
  • SuperPaint applied to siding, fascia, soffit, and pillars
  • Two yard cleanups plus a punch list closed out the details

How did the windows tie in?

We installed NT Executive vinyl windows to match the exterior upgrade. NT Windows builds these units right here in Texas, so they are designed for our heat. Vinyl frames stay tight and true where older frames tend to leak air and let cedar pollen creep in each spring.

  • Vinyl frames resist expansion in extreme heat
  • Tighter seals cut cooling costs through long summers
  • Cleaner sightlines to match the new siding

What were the results?

The home now has a fully refreshed exterior that reads clean from the street. New siding, new windows, and freshly painted trim, gutters, garage doors, and pillars all came together on the same day. The finish is built to handle whatever a Central Texas year throws at it.

  • Garage door jambs wrapped (including a double jamb)
  • Gutters and downspouts repainted by the linear foot
  • Garage doors repainted for a uniform look
  • Final punch-out completed before close on August 27, 2025

Frequently asked questions

How long did the siding and window project take?

The on-site work finished in a single day on August 12, 2025. The full timeline ran from the first lead in early May to project close on August 27.

Why is fiber cement a smart choice for Austin homes?

It holds its shape in triple-digit heat and resists hail damage far better than wood. The material also handles moisture from Austin's clay and limestone soils without rotting or swelling.

What did this exterior project cost?

This retail project fell in the $30,000 to $40,000 range. That covered siding, new windows, full painting, and all the trim and cleanup work.

Do the new windows help with energy bills?

Yes. The NT Executive vinyl units seal tighter than aging frames, which reduces heat gain and cooling strain during Austin summers.

GAF shingle roofGAF Master Elite Certificate

HERE sOME OF THE PROJECT IMAGES

After image
Before image
Before
After
No items found.