Schedule Appointment
James Hardie
Sherwin Williams

Recent Project: Austin | Northeast Austin | Siding | 12-11-25 | APS-4641

James Hardie 8.25" Select Cedar Mill Fiber Cement Siding Installation | Full Exterior Repaint with Sherwin Williams SuperPaint

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

This Northeast Austin project centered on a full siding replacement with James Hardie 8.25" Select Cedar Mill fiber cement. We rebuilt the wall system with new 7/16" OSB sheathing and replaced failing 1x2 trim. Fiber cement was chosen because it shrugs off Austin's 100-degree summers, hail, and moisture. The finished exterior has a warm cedar grain and far better durability.

Learn More About Our Siding
Gutters to a House

Exterior Painting

Sherwin Williams

We finished the home with a full exterior repaint using Sherwin Williams SuperPaint. The scope covered the new primed Hardie siding, fascia, and soffit up to 24 inches. SuperPaint was picked for its UV and fade resistance under relentless Texas sun. Every surface got sealed for a crisp, protected finish that lasts.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through an internet search and reached out on September 16, 2025. The first conversation covered the aging exterior siding and the plan to repaint after installation.

Evaluation

We inspected the home in late September and moved it to prospect status on September 23, 2025. The assessment turned up failing trim and areas where the 7/16" OSB wall sheathing had softened from moisture over the years.

PLanning & Approval

We scoped a full James Hardie 8.25" Select Cedar Mill replacement plus a complete exterior repaint. The homeowner approved the plan on October 1, 2025, including sheathing repairs and new 1x2 trim.

Installation

The crew tore off the old siding, replaced damaged sheathing and trim, and installed the primed Cedar Mill boards. Once the siding was set, they painted the siding, fascia, and soffit with Sherwin Williams SuperPaint over multiple days.

Completion

We wrapped the job on December 11, 2025, with two rounds of yard cleanup and punch-out items. The final walkthrough confirmed clean lines, full coverage, and a rebuilt wall system. The project closed on January 8, 2026.

Siding in Northeast Austin, Austin | Austin Pro

We tore off the old siding on a 1980s-era Northeast Austin home, rebuilt the wall system, and installed James Hardie 8.25" Select Cedar Mill fiber cement — then painted the whole exterior. The home went from tired and weather-worn to solid and sharp in a single build.

Project at a glance

  • Services: Siding replacement and exterior painting
  • Location: Northeast Austin, Austin, TX (78724)
  • Vendor & product: James Hardie 8.25" Select Cedar Mill
  • Material: Primed fiber cement lap siding over new 7/16" OSB sheathing
  • Timeframe: Approved Oct 1, 2025; installed and painted by Dec 11, 2025
  • Standout outcome: A cedar-textured exterior sealed with Sherwin Williams SuperPaint, built for Central Texas weather

Why did this Northeast Austin home need new siding?

The old siding had reached the end of its life. Moisture had crept behind it, and the trim was breaking down.

  • Failing exterior boards with visible wear
  • Rotted 1x2 trim that needed full replacement
  • Sections where the wall sheathing had gone soft

What did we find behind the old siding?

Once we pulled the old cladding, the real story showed up. Parts of the 7/16" OSB wall sheathing had absorbed water over the years and lost their structural bite. That is common on older Austin homes, where limestone soil shifts and slow leaks go unnoticed for a long time. We replaced the bad sheathing before a single new board went up. Skipping that step is the mistake most homeowners never see coming — new siding over rotten sheathing just hides the problem.

  • New 7/16" OSB wall sheathing installed in the worst areas
  • Fresh 1x2 trim to give the new siding clean edges
  • Full inspection of fascia and soffit before paint

What materials did we use, and why?

We went with James Hardie 8.25" Select Cedar Mill fiber cement. It carries a real cedar wood-grain texture without the upkeep of actual wood. Fiber cement holds up where Austin punishes most: 100-degree summers, spring hail, and the constant swing between wet and bone-dry. It will not warp, and it does not feed rot or pests the way old wood siding can. That mix of looks and durability is why it is our go-to for homes in this part of town.

  • 8.25" Primed Select Cedar Mill lap boards for wide, clean lines
  • Primed material, ready to hold paint tight
  • Materials delivered through ABC Supply Co. for the build

How did the exterior painting go?

After the siding was up, we painted every surface with Sherwin Williams SuperPaint. That covered the new boards plus fascia and soffit up to 24 inches.

  • Full siding coat in Sherwin Williams SuperPaint
  • Fascia and soffit sealed and finished
  • Even coverage for UV and fade resistance under Texas sun

What were the results?

The home now has a durable, uniform exterior that reads clean from the street. Cedar-mill texture gives it warmth, and the sealed paint protects every seam. Multiple days of siding and paint work wrapped up on December 11, 2025.

  • One cohesive color across siding, fascia, and soffit
  • Yard cleaned and punch items handled twice before sign-off
  • A wall system rebuilt to last, not patched

Frequently asked questions

Why is fiber cement a good fit for Austin weather?

It resists the heat, hail, and moisture swings that wear out wood and vinyl here. Cedar pollen and hard rain wash off it without staining or breaking it down.

How long did the whole project take?

The siding and painting ran over several working days and finished on December 11, 2025. The job was approved on October 1, 2025, after the fall inspection.

What did this project cost?

This retail siding and painting project fell in the $10,000 to $15,000 range. Final pricing depends on wall condition, sheathing repairs, and paint scope.

Do you paint fascia and soffit too, or just the siding?

We painted both. This scope included fascia and soffit up to 24 inches, so the whole exterior matched and stayed protected.

GAF shingle roofGAF Master Elite Certificate

HERE sOME OF THE PROJECT IMAGES

After image
Before image
Before
After
No items found.