Siding in South Austin, Austin, TX — completed Austin Pro project

Completed September 2023

Siding in South Austin, Austin, TX

Plus Windows, Shingle Roofing on the same job

We re-sided a South Austin home in Austin, TX with James Hardie fiber cement and replaced its windows, turning a tired 78748 exterior into a tight, low-maintenance shell built for Texas weather.

Trades
Siding, Windows, Shingle Roofing
Completed
Project value
$40k–$50k
Brands installed
James Hardie, Simonton, GAF

Standout outcome — A sealed, repainted exterior that shrugs off heat, hail, and cedar pollen

Timeframe — Approved April 2023, windows set in August, siding and paint finished by September 18, 2023

Neighborhood / City — South Austin, Austin, TX (ZIP 78748)

Job APS-3654

Drag to Compare

Before & After

After: Siding in South Austin, Austin, TX by Austin Pro
Before: Siding in South Austin, Austin, TX
Before
After

Scope of Work

What We Did

James Hardie HardiePlank Select Cedar Mill Fiber Cement Siding Installation · Coordinated Replacement Window Install with Full Exterior Repaint

Siding

This South Austin project got a full siding upgrade with James Hardie HardiePlank Select Cedar Mill 8.25" fiber cement. We handled fascia, soffit, a new porch ceiling, and the finish paint over several days on site. Fiber cement was the smart pick here because it shrugs off Austin's 100°-plus summers and hail. The result is a crisp, low-maintenance exterior built to last decades. For siding in Austin, TX, this is the standard we trust.

James HardieHardiePlank Select Cedar Mill 8.25"Fiber Cement Siding$15k–$20k
Learn more about our siding →

Windows

This project included new Simonton Daylight Max vinyl windows across the home in South Austin, TX. The Daylight Max line uses a narrower frame, so you get more glass and better views without a bigger opening. Vinyl windows resist Austin's heat and cedar pollen while cutting energy loss during those long 100-degree stretches. We set the windows in August, then started siding in early September for a clean, sealed finish.

SimontonDaylight MaxVinyl Windows$20k–$25k
Learn more about our windows →

Shingle Roofing

The roofing portion of this South Austin project covered the front entry flat roof and GAF Timberline HDZ shingle work. We rebuilt the low-slope area with Flintlastic SBS self-adhered base and cap sheets, then added galvanized gravel guard and headwall flashing. Modified bitumen was chosen for the flat entry because standard shingles can't seal a low pitch against Austin rain. The result is a leak-proof entry roof tied cleanly into the rest of the home.

GAFTimberline HDZAsphalt Shingle RoofingUnder $2k
Learn more about our shingle roofing →

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

February 21, 2023

The homeowner found Austin Pro through an internet search and reached out on February 21, 2023. Within two days, by February 23, the project moved into the prospect stage. Early talks centered on replacing failing siding and old windows on a South Austin home in the 78748 area.

Evaluation

We inspected the exterior and found swollen wood siding, soft fascia, and a worn front-entry flat roof. The windows were due for replacement, and the porch ceiling needed new panels. These findings shaped a combined siding, window, and paint scope with a small roofing repair.

Planning & approval

April 12, 2023

The scope was approved on April 12, 2023. We locked in James Hardie HardiePlank Select Cedar Mill and ordered the replacement windows in late April. Material selections included the porch ceiling panels, 6-inch Hardie fascia, and Sherwin Williams paint colors.

Installation

Windows arrived in late June and were installed in August so every opening could be flashed and sealed first. Siding began in early September using the primed 8.25-inch Cedar Mill lap. The crew also replaced the front-entry modified bitumen roof and painted the fascia, soffit, and garage doors across multiple days.

Completion

September 18, 2023

We invoiced and completed the project on September 18, 2023. A final walkthrough covered punch items, and two yard cleanups left the site clean. The job officially closed on January 18, 2024, with the home fully re-clad, sealed, and repainted.

5 Photos

Project Photos

Every photo is this job, shot on site by our crew in South Austin, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why did this South Austin home need new siding?

The old cladding had taken years of abuse from 100-degree summers and spring storms. Wood siding in this part of Austin tends to cup, split, and soak up moisture over time. This home was ready for a material that holds its shape.

  • Original boards showed swelling and paint failure
  • Fascia edges were soft and needed full replacement
  • The front porch ceiling required new panels
  • The garage doors were faded and out of step with the plan

What did we choose, and why fiber cement?

We went with James Hardie HardiePlank Select Cedar Mill at 8.25 inches wide. Fiber cement was the clear winner here for a simple reason. Wood swells and rots in our humidity, and vinyl can distort against a west-facing wall in July heat. Hardie holds a straight line through 100-degree afternoons and stands up to hail that would dent softer products. The Cedar Mill texture also gives you the look of real cedar grain without the constant upkeep that real cedar demands in this climate.

  • Primed 8.25-inch Select Cedar Mill lap siding
  • 6-inch Hardie fascia with a 1x2 trim detail
  • 4x8 Select Cedar Mill porch ceiling, installed and painted
  • Fascia and soffit painted up to 24 inches

How did the window and siding sequence work?

Windows drive the schedule on a job like this. We ordered them in late April, and they arrived in late June after a standard manufacturing lead time. That gap is normal for replacement windows, so we planned around it. We installed the windows in August, well before a single siding board went up. Setting them first let us flash each opening and tuck the new Hardie tight to the frames, which is how you keep wind-driven rain out for the long haul.

  • Windows ordered late April 2023
  • Windows delivered late June 2023
  • Windows installed August 2023
  • Siding began early September, ahead of paint

What else did the crew handle on site?

The front entry had a small flat roof that needed attention before we could call the exterior done. We tore off and replaced it with modified bitumen, using a CertainTeed Flintlastic SBS self-adhered system. That kind of low-slope detail is easy to overlook, but skipping it invites leaks right at the entry.

  • R&R modified bitumen over the front entry
  • CertainTeed Flintlastic SBS SA cap sheet plus base ply
  • Galvalume headwall flashing and a 26GA galvanized gravel guard
  • Karnak asphalt primer to prep the substrate

What were the results?

The home now wears one cohesive, freshly painted exterior. Siding, fascia, porch ceiling, and garage doors all match, and the new windows sit clean inside their trim. Two rounds of yard cleanup and punch-out closed the job on September 18, 2023.

  • Full exterior painting tie-in with Sherwin Williams coatings
  • Garage doors repainted to match the new palette
  • Two yard cleanups plus a punch list walkthrough
  • Project value in the $40k–$50k range

Straight Answers

Questions About This Project

Why install the windows before the siding?

Order matters. Setting the windows first lets the crew flash and seal each opening, then lap the siding over that flashing. Do it the other way and you fight leaks at every frame.

How well does Hardie hold up in Austin?

Very well. Fiber cement doesn't swell in humidity or soften in 100-degree heat, and it resists hail impact and cedar pollen buildup better than wood. That's why it's a go-to for South Austin homes.

How long did the whole project take?

This job was approved in April 2023 and stretched across the summer. Window lead time ran late April to late June, install landed in August, and siding plus paint wrapped by September 18, 2023.

Was the front entry roof part of the scope?

Yes. We replaced the small flat roof over the front entry with a modified bitumen system. Tackling it during the exterior work kept that vulnerable spot watertight.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5