Recent Project: Austin | South Austin | Siding & Windows | 09-18-23 | APS-3654

James Hardie HardiePlank Select Cedar Mill Fiber Cement Siding Installation | Coordinated Replacement Window Install with Full Exterior Repaint

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

We re-clad this South Austin home with James Hardie HardiePlank in the Select Cedar Mill profile, 8.25 inches wide. The primed fiber cement resists warping and swelling that plague older wood siding in Texas heat. We also rebuilt the fascia with 6-inch Hardie board and installed a Select Cedar Mill porch ceiling. Fiber cement was the right call for a home facing hail, cedar pollen, and long summer sun.

Learn More About Our Siding

Windows

NT Windows

New replacement windows were part of this South Austin project scope. We ordered them in late April, and they arrived in late June after a normal lead time. Installation happened in August, ahead of the siding phase, so we could seal each opening properly. Setting windows first is the correct sequence for a lasting, weather-tight fit.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through an internet search and reached out on February 21, 2023. Within two days, by February 23, the project moved into the prospect stage. Early talks centered on replacing failing siding and old windows on a South Austin home in the 78748 area.

Evaluation

We inspected the exterior and found swollen wood siding, soft fascia, and a worn front-entry flat roof. The windows were due for replacement, and the porch ceiling needed new panels. These findings shaped a combined siding, window, and paint scope with a small roofing repair.

PLanning & Approval

The scope was approved on April 12, 2023. We locked in James Hardie HardiePlank Select Cedar Mill and ordered the replacement windows in late April. Material selections included the porch ceiling panels, 6-inch Hardie fascia, and Sherwin Williams paint colors.

Installation

Windows arrived in late June and were installed in August so every opening could be flashed and sealed first. Siding began in early September using the primed 8.25-inch Cedar Mill lap. The crew also replaced the front-entry modified bitumen roof and painted the fascia, soffit, and garage doors across multiple days.

Completion

We invoiced and completed the project on September 18, 2023. A final walkthrough covered punch items, and two yard cleanups left the site clean. The job officially closed on January 18, 2024, with the home fully re-clad, sealed, and repainted.

Siding & Windows in South Austin, Austin (Sep 2023)

We re-sided a South Austin home in Austin, TX with James Hardie fiber cement and replaced its windows, turning a tired 78748 exterior into a tight, low-maintenance shell built for Texas weather.

Project at a glance

  • Services: Siding and windows
  • Neighborhood / City: South Austin, Austin, TX (ZIP 78748)
  • Vendor & product: James Hardie HardiePlank in the Select Cedar Mill profile
  • Material: Primed 8.25-inch fiber cement lap siding
  • Timeframe: Approved April 2023, windows set in August, siding and paint finished by September 18, 2023
  • Standout outcome: A sealed, repainted exterior that shrugs off heat, hail, and cedar pollen

Why did this South Austin home need new siding?

The old cladding had taken years of abuse from 100-degree summers and spring storms. Wood siding in this part of Austin tends to cup, split, and soak up moisture over time. This home was ready for a material that holds its shape.

  • Original boards showed swelling and paint failure
  • Fascia edges were soft and needed full replacement
  • The front porch ceiling required new panels
  • The garage doors were faded and out of step with the plan

What did we choose, and why fiber cement?

We went with James Hardie HardiePlank Select Cedar Mill at 8.25 inches wide. Fiber cement was the clear winner here for a simple reason. Wood swells and rots in our humidity, and vinyl can distort against a west-facing wall in July heat. Hardie holds a straight line through 100-degree afternoons and stands up to hail that would dent softer products. The Cedar Mill texture also gives you the look of real cedar grain without the constant upkeep that real cedar demands in this climate.

  • Primed 8.25-inch Select Cedar Mill lap siding
  • 6-inch Hardie fascia with a 1x2 trim detail
  • 4x8 Select Cedar Mill porch ceiling, installed and painted
  • Fascia and soffit painted up to 24 inches

How did the window and siding sequence work?

Windows drive the schedule on a job like this. We ordered them in late April, and they arrived in late June after a standard manufacturing lead time. That gap is normal for replacement windows, so we planned around it. We installed the windows in August, well before a single siding board went up. Setting them first let us flash each opening and tuck the new Hardie tight to the frames, which is how you keep wind-driven rain out for the long haul.

  • Windows ordered late April 2023
  • Windows delivered late June 2023
  • Windows installed August 2023
  • Siding began early September, ahead of paint

What else did the crew handle on site?

The front entry had a small flat roof that needed attention before we could call the exterior done. We tore off and replaced it with modified bitumen, using a CertainTeed Flintlastic SBS self-adhered system. That kind of low-slope detail is easy to overlook, but skipping it invites leaks right at the entry.

  • R&R modified bitumen over the front entry
  • CertainTeed Flintlastic SBS SA cap sheet plus base ply
  • Galvalume headwall flashing and a 26GA galvanized gravel guard
  • Karnak asphalt primer to prep the substrate

What were the results?

The home now wears one cohesive, freshly painted exterior. Siding, fascia, porch ceiling, and garage doors all match, and the new windows sit clean inside their trim. Two rounds of yard cleanup and punch-out closed the job on September 18, 2023.

  • Full exterior painting tie-in with Sherwin Williams coatings
  • Garage doors repainted to match the new palette
  • Two yard cleanups plus a punch list walkthrough
  • Project value in the $40k–$50k range

Frequently asked questions

Why install the windows before the siding?

Order matters. Setting the windows first lets the crew flash and seal each opening, then lap the siding over that flashing. Do it the other way and you fight leaks at every frame.

How well does Hardie hold up in Austin?

Very well. Fiber cement doesn't swell in humidity or soften in 100-degree heat, and it resists hail impact and cedar pollen buildup better than wood. That's why it's a go-to for South Austin homes.

How long did the whole project take?

This job was approved in April 2023 and stretched across the summer. Window lead time ran late April to late June, install landed in August, and siding plus paint wrapped by September 18, 2023.

Was the front entry roof part of the scope?

Yes. We replaced the small flat roof over the front entry with a modified bitumen system. Tackling it during the exterior work kept that vulnerable spot watertight.