Schedule Appointment
James Hardie
Sherwin Williams

Recent Project: Austin | Shady Hollow | Siding & Exterior Painting | 01-05-23 | APS-3499

Full James Hardie HardiePlank Cedar Mill Siding Replacement | Durable Sherwin Williams Exterior Painting Finish

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

This Shady Hollow project centered on a full siding replacement with James Hardie fiber cement. We installed HardiePlank in the Cedar Mill 8.25-inch profile across the home's exterior. Fiber cement was the right call here because it shrugs off hail, cedar pollen buildup, and relentless Central Texas heat. The finished walls look sharp and need far less upkeep than the original siding.

Learn More About Our Siding
Gutters to a House

Exterior Painting

Sherwin Williams

Exterior painting followed the siding install to protect and finish the new boards. Our painters used Sherwin Williams coatings chosen for UV resistance and long life in Austin's sun. We ran full prep and priming before applying the topcoat for even coverage. The two-day paint phase gave the home a clean, cohesive look that stands up to weather.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner first found Austin Pro through Yelp and reached out about their aging exterior. Early contact records trace back to September 2019 as the project took shape. The conversation focused on a lasting fix rather than another round of repairs.

Evaluation

We inspected the full exterior and found siding worn from years of sun, hail, and cedar pollen. The south and west walls showed the heaviest damage. That assessment pointed clearly toward a full James Hardie replacement instead of spot repairs.

PLanning & Approval

We walked the homeowner through the HardiePlank Cedar Mill profile and the Sherwin Williams paint plan. The project was approved on September 30, 2022. From there we scheduled the siding and painting phases back to back for a clean handoff.

Installation

The crew spent three days removing old siding and installing the new HardiePlank, then two days on prep, primer, and topcoat. The overlapping schedule kept the project moving without gaps.

Completion

We finished all on-site work on January 5, 2023, and walked the exterior with the homeowner. The new siding and Sherwin Williams finish left the home weather-ready and low-maintenance.

Siding in Austin | Austin Pro

We replaced the full exterior siding on this Shady Hollow home with James Hardie fiber cement, then painted it to match. The result is a tougher, cleaner facade built for Central Texas weather.

Project at a glance

  • Services: Siding replacement plus exterior painting
  • Location: Shady Hollow, Austin, TX (78748)
  • Vendor & product: James Hardie HardiePlank, Cedar Mill profile
  • Material: Fiber cement lap siding, 8.25-inch exposure
  • Timeframe: Siding took 3 days, paint two days
  • Standout outcome: A low-maintenance wall system finished with durable Sherwin Williams paint

Why did this Shady Hollow home need new siding?

Many homes in this pocket of 78748 date back to the 1980s and 1990s. Their original siding takes a beating from our summers and spring hail. This home was no exception.

  • The old boards showed wear typical of decades in the Texas sun
  • Cedar pollen and moisture had settled into worn seams
  • The homeowner wanted a fix that would not need constant repainting or repair

What did the crew find during inspection?

When we walked the exterior, the story was familiar for older Shady Hollow builds. The existing siding had lost its ability to hold paint well, and the surface was tired. Sun exposure on the south and west walls had done the most damage over the years. That kind of wear is not just cosmetic. Once boards start failing, water and pollen find their way behind them, and small problems grow. We planned a full replacement rather than a patch so the whole wall system would age evenly.

What materials did we use, and why?

We chose James Hardie HardiePlank in the Cedar Mill 8.25-inch profile. Fiber cement is the right material for Austin homes for a few clear reasons. It does not warp when temperatures push past 100 degrees, and it stands up to hail far better than wood or vinyl. Cedar pollen wipes off its painted surface instead of staining it. The Cedar Mill texture gives a natural wood-grain look without the upkeep real cedar demands in this climate. For a home that sees limestone-soil ground movement and hard sun, that durability matters.

  • Full-home HardiePlank lap siding install
  • 8.25-inch board exposure for a clean, traditional line
  • Fiber cement rated for the heat, hail, and humidity swings here

How did the installation go?

The siding phase ran over three days. Our crew removed the old material, checked the wall for any hidden issues, and set the new HardiePlank course by course.

  • Old siding removed and disposed of
  • New fiber cement fastened and sealed at seams and edges
  • Walls left ready for paint prep

How did the exterior painting finish the job?

Paint followed the siding and took two days. We prepped and primed the new boards before applying Sherwin Williams coatings. That order matters. Painting fiber cement properly means clean, dry boards and the right primer, so the color bonds and resists UV fade for years. Skipping prep is the mistake homeowners often make on their own, and it shows within a season. Our finish gave the home even coverage and a unified look.

  • Full surface prep on new siding
  • Primer coat before topcoat for adhesion
  • Sherwin Williams products chosen for sun and weather resistance

What were the results?

The home now has a fresh, cohesive exterior that will need far less maintenance than the original. The siding and paint work together as one weather-tight system. It looks sharp on the street and is built to hold up.

  • Uniform, hail-tough facade
  • Low-upkeep surface that sheds pollen and resists fade
  • Completed on schedule by January 5, 2023

Frequently asked questions

How long did the whole project take on site?

Siding took three days, and painting took the final two, overlapping at the end.

Why is fiber cement a good choice in Austin?

It handles our extremes. Fiber cement holds its shape in 100-degree heat, resists hail impact, and does not rot or feed pests the way wood can in humid stretches.

What did this siding and painting project cost?

This retail project fell in the $30,000 to $40,000 range. The final figure depends on home size, siding condition, and paint scope.

Do you paint over new James Hardie siding, or is it pre-finished?

On this job we field-painted the boards with Sherwin Williams after install. That lets the homeowner pick an exact color and gives us full control over prep and coverage.

GAF shingle roofGAF Master Elite Certificate
No items found.