Schedule Appointment
James Hardie
Pella

Recent Project: Austin | Cutler Ridge | Siding & Windows | 12-17-24 | APS-4217

James Hardie HardiePlank Select Cedar Mill Siding Installation | Energy-Efficient Window Replacement with OSI Closed-Cell Air Sealing

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

This Austin siding project wrapped the home in James Hardie HardiePlank Select Cedar Mill in the 8.25-inch profile. Fiber cement was chosen because it shrugs off hail, heat, and cedar pollen better than wood. Every seam was locked down with Sherwin-Williams Power House 60-year caulk. The finished exterior looks sharp and needs far less upkeep.

Learn More About Our Siding

Windows

Pella

We installed the new windows in Cutler Ridge first, then moved to siding for a clean, sealed integration. Standard openings ran up to 132 united inches, with a few oversized units above that. Each frame was foamed with OSI closed-cell spray foam for a tight air seal. The upgrade cuts heat gain during Austin's brutal summers.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through an internet search and reached out on July 8, 2024. They wanted the home's dated exterior and leaky windows addressed together. We moved the inquiry to an active prospect two days later, on July 10.

Evaluation

During the site visit we found weathered cladding with movement at the seams and windows that were letting in heat. A window technician later took exact measurements to confirm which openings were standard and which ran oversized past 132 united inches. That measure step kept the window order accurate.

PLanning & Approval

We walked the homeowner through the James Hardie HardiePlank Select Cedar Mill product and the 8.25-inch profile. The scope combined new windows with a full siding re-clad. The client approved the plan on July 25, 2024.

Installation

Both trades ran on December 17, 2024. The crew set the new windows first, air-sealed each frame with OSI closed-cell spray foam, then cleaned up any overspray. Siding installation followed, with every joint locked in using Sherwin-Williams Power House 60-year caulk.

Completion

The team hauled off the old cladding and completed a final walkthrough the same day the work was invoiced, December 17, 2024. The home came away with a tight, hail-ready exterior. The project file closed out on July 21, 2025.

Siding & Windows in Cutler Ridge, Austin | Austin Pro

We replaced the windows and re-clad this Cutler Ridge home in James Hardie fiber cement, finishing both in a tight December turnaround. The home now has a sealed, low-maintenance exterior built for Austin weather.

Project at a glance

  • Services: Siding and windows
  • Location: Cutler Ridge, Austin, TX 78749
  • Vendor & product: James Hardie HardiePlank Select Cedar Mill
  • Material: 8.25-inch fiber cement lap siding
  • Timeframe: Approved July 25, 2024; installed and invoiced December 17, 2024
  • Standout outcome: A fully air-sealed, hail-ready exterior with new windows behind it

Why did this Cutler Ridge home need new siding?

The older cladding had taken a beating from years of sun and storms. Wood siding in this ZIP tends to swell, split, and fade once the heat and cedar pollen get to work. Swapping it for fiber cement solved the upkeep problem for good.

  • Old boards showed weathering and movement at the seams
  • Cedar pollen and grime had settled into the surface texture
  • Fiber cement resists the swings between 100-degree afternoons and cool nights

What materials did we use, and why?

We chose James Hardie HardiePlank in the Select Cedar Mill texture and 8.25-inch width. That profile gives a strong shadow line without looking busy, and the wood-grain face reads like real cedar from the curb. Fiber cement matters here because Central Texas throws hail and relentless UV at a home every year. Wood and vinyl both give up eventually. This product holds its shape and paint through all of it. We sealed every joint with Sherwin-Williams Power House 60-year caulk so water stays out where boards meet trim.

  • Sourced siding and trim through ABC Supply and McCoy's
  • Caulk color matched to the finish for a seamless look
  • Fasteners and flashing spec'd to Hardie's install guide

How did we handle the windows?

We set the new windows first, then ran the siding over them. Doing it in that order lets the cladding tuck cleanly against the frames and flashing. It also gives us one continuous water barrier instead of two seams fighting each other. Most homeowners try siding first and then wrestle windows into a finished wall, which almost always leaves gaps. Our sequence closes those gaps before they can start.

  • Standard units installed up to 132 united inches
  • A few oversized openings ran greater than 132 UI
  • Each frame air-sealed with OSI closed-cell spray foam
  • Overspray cleaned up with OSI foam cleaner before trim went on

What did the installation involve?

Both trades ran on December 17, 2024, with a window technician measuring ahead of the install. The crew pulled the old units, set the new ones level, then foamed and flashed each opening. Siding followed once the openings were sealed and dry.

  • Window measure fee handled before order to confirm sizing
  • Delivery and dump fees covered demo haul-off
  • Closed-cell foam chosen for its moisture block, not just insulation
  • Old cladding removed and disposed of same day

What were the results?

The home reads clean and modern from Cutler Ridge Place, with tighter windows behind a durable shell. Heat gain through the old frames is gone, and the new siding will hold its finish for years. This retail project landed in the $25k–$30k range.

  • Continuous air seal from window frame through siding
  • Wood-grain look without wood's rot and repaint cycle
  • One-day turnaround with no lingering demo mess

Frequently asked questions

Why install windows before siding?

Setting windows first lets the new cladding lap over the frames and flashing in one motion. That builds a single, unbroken barrier against Austin's wind-driven rain and hail.

Does fiber cement really hold up in Austin heat?

Yes. Unlike wood, it won't swell or split when afternoon temps push past 100 degrees. It also resists the hail that regularly hits this part of Central Texas.

What keeps water out at the window openings?

Every frame was sealed with OSI closed-cell spray foam, which blocks both air and moisture. Exterior joints then got Sherwin-Williams Power House 60-year caulk for a long-term seal.

How long did the whole project take?

The homeowner approved the work in late July 2024, and both trades were installed in a single day on December 17, 2024. Ordering and scheduling the windows accounted for most of the gap.

GAF shingle roofGAF Master Elite Certificate

HERE sOME OF THE PROJECT IMAGES

After image
Before image
Before
After
No items found.