Completed July 2025
Siding in Travis Country, Austin, TX (July 2025)
Plus Windows, Shingle Roofing, Doors, Exterior Painting, Gutters on the same job
We updated the siding and windows on a Travis Country home in Austin, TX. The work brought together new exterior materials, coordinated paint, and a completed window installation.
- Trades
- Siding, Windows, Shingle Roofing, Doors, Exterior Painting, Gutters
- Location
- Travis Country, Austin, TX
- Completed
- Brands installed
- James Hardie, NT Windows, GAF, Pella, Sherwin Williams
Standout outcome — The crew finished the coordinated exterior work on site July 15.
Timeframe — The siding and paint crew worked July 12–15, 2025; windows went in over two earlier days in July.
Neighborhood/City — Travis Country, Austin, TX 78735.
Vendors and products — James Hardie 8.25-inch Select Cedar Mill and NT Windows Presidential .
Job APS-4447
Drag to Compare
Before & After


Scope of Work
What We Did
James Hardie 8.25-Inch Select Cedar Mill Fiber Cement Siding · Two-Day NT Windows Presidential Vinyl Window Installation
Siding
This Siding in Austin, TX project used James Hardie 8.25-inch Select Cedar Mill fiber cement boards. We also addressed wall sheathing, fascia, soffit, and the porch ceiling. Fiber cement made sense for an exterior exposed to Austin’s long, hot summers. The finished siding and painted trim gave the home a consistent look.
Learn more about our siding replacement →Windows
This Windows in Austin, TX project included NT Windows Presidential vinyl windows. We planned the window work alongside new siding and brick-pocket trim. Coordinating those trades helped us address the edges where different exterior materials meet. The completed windows fit the home’s broader exterior update.
Learn more about our window replacement →Shingle Roofing
This Shingle Roofing in Austin project used GAF Timberline HDZ asphalt shingles. The roof was one part of a six-service exterior update. Coordinating it with the siding and other work kept the project under one exterior plan. The completed home has a new asphalt-shingle roof.
Learn more about our roof replacement →Doors
This Doors in Austin project included a Pella entry door. We coordinated the door work with the home’s wider exterior plan. Nearby siding and trim were also part of the scope. The finished entry fits the completed exterior update.
Learn more about our door replacement →Exterior Painting
This Exterior Painting in Austin project used Sherwin Williams SuperPaint on the siding. The scope also included fascia, soffit, and garage-door paint. Those adjoining surfaces needed attention alongside the new exterior materials. The completed paint work gave the planned areas a consistent finish.
Gutters
This Gutters in Austin project included removal of the existing gutters. Seamless aluminum gutters were part of the replacement scope. The exterior plan also included James Hardie HardieTrim details. These were trim components, not the material used to make the gutters.
Learn more about our seamless gutters →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
January 15, 2025The homeowner found us through an online search and reached out on January 15, 2025. We began discussing an exterior project that included siding and windows.
Evaluation
January 19, 2025We inspected the home on January 19, 2025, and started the estimate. The scope covered siding, windows, and adjoining details such as fascia, soffit, the porch ceiling, and garage-door jambs.
Planning & approval
April 9, 2025The homeowner approved the project on April 9, 2025. We ordered the NT Windows Presidential windows on April 18 and planned the exterior work around their arrival in late June.
Installation
We installed the windows over two days in early July, then completed the GAF shingle roof on July 8. From July 12 through July 15, the crew worked on siding and paint, including the specified trim, soffit, and garage-opening details.
Completion
July 15, 2025The crew finished on site July 15, 2025. The completed work brought together the new siding, earlier window installation, and the project's other exterior finishes.
7 Photos
Project Photos
Every photo is this job, shot on site by our crew in Travis Country, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
What did this Travis Country exterior project involve?
This was more than a change to the siding's visible surface. Our January 19 inspection and estimate covered the parts that frame the exterior, including fascia, soffit, porch ceiling, and areas around the garage opening. Those details matter on a home getting both siding and windows: a broad new siding surface can make unfinished edges much easier to see.
The siding scope called for 7/16-inch OSB wall sheathing and 1-by-4-inch brick pocket work. We treated those as separate parts of the plan rather than assuming the finish boards alone would complete each transition. We also included wrapping the double garage-door jamb and painting the garage doors. None of that is as prominent as a siding profile, but it affects whether the finished exterior looks like one project instead of several unrelated jobs.
The homeowner first reached out after an online search on January 15, 2025. That gave us time to inspect the home and work through the larger mix of trades before installation began.
Why use fiber cement siding here?
We selected James Hardie Select Cedar Mill fiber cement siding for the main siding work. Its 8.25-inch profile gave us a defined board size for the exterior plan, while the cedar-mill texture provided the intended finish. Austin summers regularly exceed 100°F, so the material choice deserved more thought than color alone. A common mistake is to focus on the board and overlook the fascia, soffit, and trim that meet it. This scope addressed those adjoining areas, including 6-inch James Hardie fascia.
- The soffit work included H-mold.
- The porch ceiling scope covered installation and paint for 4-by-8-foot panels.
- Fascia and soffit painting extended to areas up to 24 inches wide.
Those measurements shaped the crew's work at the edges of the home. They also helped us plan where the siding installation stopped and the finishing work began.
How did we coordinate windows, roofing, and siding?
The windows came first. We ordered the NT Windows Presidential units on April 18, received them in late June, and installed them over two days in early July. That sequence kept the window work ahead of the final siding and paint phase. The product specified for this home was vinyl; the project does not call for a claim about a measured change in energy use.
A GAF Timberline HDZ shingle roof followed on July 8 and took one day on site. Roofing can move on a different schedule from siding, and it did here. We then started the siding phase on July 12 and finished on July 15. Calling the whole exterior update a one-day job would miss both the earlier window work and four days devoted to siding and paint.
- A Pella entry door was also part of the exterior project.
- The gutter scope included disposal of the existing gutters by linear foot.
- New seamless aluminum gutters were included with the exterior work.
Coordinating several trades meant keeping their dates distinct. The homeowner approved the project on April 9, well before the windows arrived or the crew began the July installations.
What went into the four-day siding finish?
The July 12–15 window was for on-site siding and paint work, not for the time spent waiting on materials. The crew installed the specified siding components, then handled the paint scope using Sherwin Williams SuperPaint on the siding. Painting also covered the listed fascia, soffit, and garage doors.
- The plan included both primed Select Cedar Mill material and James Hardie Select Cedar Mill siding.
- Garage-door jamb wrapping addressed the opening beside the new exterior finish.
- The crew had two yard cleanups and punch items in the finishing scope.
A multi-day finish matters because these are different tasks. Setting boards, working around trim, painting, and cleaning the site should not be described as a single installation step. The crew completed its on-site work July 15.
What should you take from this Austin siding and window project?
The useful lesson is to plan the entire exterior, not just the largest surface. This Travis Country job paired vinyl windows with fiber cement siding, then accounted for the porch ceiling, garage opening, roof, door, and gutters. Each part had its own place in the schedule and finish.
- The window installation took two days in early July, before the siding crew's scheduled start.
- The roof's July 8 installation did not shorten the later four-day siding phase.
- The exterior paint scope included more than the siding boards themselves.
For a homeowner comparing bids, those boundaries are worth checking. Ask whether the proposed siding work covers sheathing, openings, and adjacent trim, or only the boards you see from the street. This project specified those surrounding tasks rather than leaving them implied.
Straight Answers
Questions About This Project
How long did the siding installation take?
The siding and paint crew was on site from July 12 through July 15, 2025. The two-day NT Windows installation happened earlier in July and was not part of that four-day window.
Why was there a gap between approval and installation?
The homeowner approved the project April 9, and the windows were ordered April 18. They arrived in late June before the early-July installation, so the approval date was not an on-site start date.
What was the project value range?
The combined six-service exterior project fell in the $60,000–$75,000 range. That range covers more than the James Hardie siding and NT Windows work alone.
Does this project establish a warranty or an energy-savings figure?
No specific warranty term or measured energy result is part of this project description. The documented outcome is the completed on-site exterior work on July 15, including the siding finish and the windows installed earlier that month.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address