Completed July 2025
Siding in West Oak Hill, Austin, TX (July 2025)
Plus Windows, Exterior Painting on the same job
We replaced the siding and windows on a home in West Oak Hill, Austin, TX, then completed the exterior painting. The work brought all three parts of the exterior project together by July 22, 2025.
- Trades
- Siding, Windows, Exterior Painting
- Location
- West Oak Hill, Austin, TX
- Completed
- Brands installed
- James Hardie, Simonton, Sherwin Williams
Standout outcome — The crew finished the siding, window, and painting work as one coordinated exterior project.
Vendors and products — James Hardie 8.25-inch Select Cedar Mill siding; Simonton Daylight Max windows; Sherwin Williams exterior painting materials.
On-site timeframe — Windows took three days in early July. Siding and painting ran July 19–22, 2025, across four days.
Job APS-4465
Scope of Work
What We Did
James Hardie 8.25-Inch Select Cedar Mill Fiber Cement Siding · Simonton Daylight Max Vinyl Replacement Windows
Siding
This Siding in Austin, TX project used James Hardie fiber cement in the 8.25-inch Select Cedar Mill profile. The material suits an exterior exposed to Central Texas heat. Siding work was paired with window replacement and exterior painting. The finished home has a coordinated new exterior.
Learn more about our siding replacement →Windows
This Windows in Austin, TX project used Simonton Daylight Max vinyl replacement windows. A technician measured the openings before installation, which included standard and oversized window categories. The crew used closed-cell spray foam among the installation materials. White interior and exterior window finishes completed the work.
Learn more about our window replacement →Exterior Painting
This Exterior Painting in Austin project was completed with siding and window replacement. Sherwin Williams was the specified painting vendor. The combined scope kept the exterior trades within one project. The painting work was finished by the crew’s final on-site day, July 22.
Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
April 14, 2025The homeowner found Austin Pro through an online search and reached out on April 14, 2025. The conversation began a project involving siding, replacement windows, and exterior painting in West Oak Hill.
Evaluation
We inspected the home on April 15 and began the estimate. The planned window work called for technician measurements and included both standard and oversized installation categories. We assessed the siding and painting work as part of the same exterior project.
Planning & approval
April 23, 2025The homeowner approved the project on April 23, 2025. The selections included James Hardie 8.25-inch Select Cedar Mill fiber cement siding and Simonton Daylight Max vinyl windows. We ordered the windows on May 29; they arrived in late June.
Installation
The window crew installed the replacement windows over three days in early July, using materials that included OSI closed-cell spray foam. Siding and exterior painting then ran from July 19 through July 22. Those were four on-site days, separate from the earlier window installation.
Completion
July 22, 2025The crew finished the on-site siding and painting work on July 22, 2025. The completed project brought together the James Hardie siding, Simonton windows, and exterior painting. Sherwin-Williams Power House 60-year White Caulk was among the specified materials; its name alone does not establish a project-wide warranty.
8 Photos
Project Photos
Every photo is this job, shot on site by our crew in West Oak Hill, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why was this West Oak Hill project planned in separate parts?
The homeowner found us through an online search and reached out on April 14, 2025, about the exterior project. We inspected the home the next day and began the estimate. The agreed work included siding, replacement windows, and painting—not just a change to one surface. That mix shaped the schedule because the windows had to be measured and ordered before installation.
The homeowner approved the project on April 23. We ordered the Simonton windows on May 29, received them in late June, and installed them over three days in early July. The siding and paint work followed later that month. Keeping those visits distinct matters: the time spent waiting for windows was not time spent installing them.
What did we account for before ordering the windows?
The window work included a technician measurement, which gave us a basis for the replacement order. The installation scope also separated standard-size openings, up to 132 united inches, from oversized openings above that measure. That is a useful distinction for a homeowner: a large opening is not simply another standard window. It calls for its own installation planning.
We also planned the materials used around the new frames, including OSI closed-cell spray foam and foam cleaner. Foam belongs at the installation joint; it is not a substitute for measuring the opening correctly. The specified window color was white on both the interior and exterior. Those choices were set before the three-day window visit, rather than decided while the crew was fitting the frames.
Why use fiber cement siding for this Austin home?
We used James Hardie 8.25-inch Select Cedar Mill fiber cement for the siding work. Its cedar-mill texture gave this West Oak Hill exterior a defined siding profile without choosing wood siding. That was a practical material choice for a project in Austin, where summer temperatures can pass 100°F. It also gave the painting crew a clear siding scope to follow.
- The 8.25-inch product width identifies the siding selected for this home; it is not a measurement of every wall.
- Exterior painting was part of the approved work, not a separate future phase.
- The siding and paint crews worked within the July 19–22 on-site window.
- The project included delivery and debris disposal in its scope.
How were the replacement windows installed?
The window crew completed its work in early July, before siding installation began. The scope covered installation labor for both the standard and oversized window categories. We treated those as planned parts of the same Simonton replacement project, rather than assuming every opening would take identical work.
- The selected line was Daylight Max, a vinyl replacement window.
- OSI closed-cell spray foam was listed among the installation materials.
- OSI foam cleaner was included with those materials.
- The windows arrived in late June, ahead of the early-July installation visit.
How did the siding and painting work proceed?
The crew began the final on-site phase on July 19 and finished on July 22. Over those four days, we carried out the James Hardie siding work and exterior painting. This was not a one-day siding job; painting was part of the same phase and needed its own place in the sequence.
- Sherwin-Williams Power House 60-year White Caulk was specified for the project.
- The caulk's product name does not, by itself, describe a labor warranty.
- Siding was the primary service, with painting included alongside the window replacement.
- July 22 was the last day of work at the home, not the date the homeowner first contacted us.
What was finished at the West Oak Hill home?
By the end of July 22, the planned siding, window, and exterior painting work was complete on site. The result brought a cedar-mill siding profile and new vinyl windows into the same exterior update. The record identifies the products and work completed; it does not establish a measured change in energy use or a history of hail damage at this home.
- The siding material was fiber cement rather than wood.
- Replacement windows had matching white interior and exterior color selections.
- The project covered three trades: siding, windows, and painting.
- The total project value fell in the $30,000–$40,000 range.
Straight Answers
Questions About This Project
Did the windows and siding take four days altogether?
No. The windows took three on-site days in early July. The four-day July 19–22 period describes the later siding and painting work, not the full span of every installation visit.
Did the caulk's “60-year” name mean the whole project had a 60-year warranty?
No such project-wide warranty is specified here. “60-year” appears in the name of the Sherwin-Williams Power House White Caulk selected for the work; it should not be read as a promise covering every material or installation task.
Why measure the windows before placing the order?
This Simonton project included openings in two installation size categories. A technician measurement helped plan the order and the work needed at those openings before the windows arrived.
Was the exterior painting included in the project value?
Yes. Exterior painting was one of the three approved services within the $30,000–$40,000 total range, along with siding and windows. That range is for the combined project, not for painting alone.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address