Completed January 2026
Windows in The Reserve At Twin Creeks, Cedar Park, TX
We installed 48 windows at a stucco-sided home in The Reserve At Twin Creeks, Cedar Park, TX. The result was a complete window update with finished trim and sealed edges around the openings.
- Trades
- Windows
- Completed
- Brands installed
- Andersen
Standout outcome — 48 openings completed in a stucco exterior.
Vendor and product — Andersen 100 Series.
On-site timeframe — January 17–21, 2026; five days.
Job APS-4620
Scope of Work
What We Did
48 Andersen 100 Series Fibrex Composite Windows · Stucco Window Installation With Interior and Exterior Finish-Out
Windows
This Windows project in Cedar Park, TX, used Andersen 100 Series Fibrex composite units. The scope included installation, stucco work at window openings, and trim on both sides of the home. Fibrex offered a composite frame choice for a Central Texas home facing long, hot summers. The crew finished the openings with foam, caulk, and painted trim.
Learn more about our window replacement →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what windows typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
July 7, 2025The homeowner reached out on July 7, 2025, after a referral from a past customer. The conversation began around a substantial window project at the stucco-sided home.
Evaluation
July 25, 2025We inspected the home on July 25, 2025, and began the estimate. The project involved 48 window openings in stucco, which called for added installation labor and finish-out.
Planning & approval
September 10, 2025The plan paired Andersen 100 Series Fibrex composite windows with trim, foam, caulk and paint work around the openings. The homeowner approved the project on September 10, 2025.
Installation
The crew installed windows over January 17–21, 2026. The scope included work at the stucco openings, OSI closed-cell spray foam, trim installation, and interior and exterior finish-out.
Completion
January 21, 2026The crew completed the window work on January 21, 2026. The finished scope included Andersen units and work around the openings, including caulked and painted trim. No project-specific warranty or follow-up terms are stated here.
9 Photos
Project Photos
Every photo is this job, shot on site by our crew in The Reserve At Twin Creeks, Cedar Park, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Cedar Park home call for more than a standard window install?
The homeowner reached out on July 7, 2025, after a referral from a past customer. The project covered 48 windows, so a clean result depended on more than setting new units. Each opening also needed finish work where the window met the stucco and interior trim.
- The scope included separate labor for window installation and interior and exterior finish-out.
- Stucco work was accounted for at each window, not treated like a routine siding opening.
- A window technician measured the units before installation.
- The plan included 1x2 or 1x4 trim where needed for the finish.
- Delivery and removal of installation debris were part of the project scope.
What did we learn at the July inspection?
We inspected the home and began the estimate on July 25, 2025. The key condition was clear: the windows sat in stucco siding, which takes more labor to work around than a simpler exterior finish. That affects how a crew plans each opening and its final edges. A homeowner comparing window bids could miss that difference if both bids list only the window units. Here, the stucco labor and finish-out had to be considered alongside the glass and frames.
- The count was 48 windows, making repeatable measurements especially useful.
- The labor scope covered standard-size installation for units up to 132 united inches.
- Exterior trim materials were included for work around the windows.
- Interior finish-out was included, rather than leaving those edges outside the scope.
- The estimate also accounted for caulking and painting trim after installation.
Why use Andersen 100 Series windows here?
Andersen 100 Series windows use Fibrex composite frames. For this Cedar Park home, that gave us a defined product and frame material across a large group of openings. Central Texas summers can reach 100°F or more, so frame choice matters. The stucco, though, remained a separate installation concern; a good window cannot replace careful work at the wall around it.
- The homeowner approved the project on September 10, 2025.
- The selected product line was the same across the 48-window scope.
- The project included installation materials beyond the window units themselves.
- The window labor and wall finish were planned as separate parts of the job.
- Material lead time fell before the January on-site work, not within the two installation days.
How did we handle the stucco openings during installation?
The crew worked on site from January 17 through January 21, 2026. Stucco changes the pace of a window job because the crew must address the opening’s finished edges, not just place and fasten the unit. We used OSI closed-cell spray foam in the installation scope and planned trim work on both sides of the wall. Skipping those finish details would leave a very different job from the one this homeowner approved.
- The scope specified OSI foam cleaner alongside the spray foam.
- Hardie trim and paint materials were included for the window surrounds.
- The trim plan allowed 1x2 or 1x4 pieces, depending on the opening.
- Exterior and interior finish-out labor accompanied the installation labor.
- The crew’s final on-site day was January 21, not the date the project was approved.
What finished the window edges?
Finish work tied the new windows into the home’s existing surfaces. The scope called for caulking and painting trim, plus Sherwin Williams Power House white caulk at the joints. Those details matter on a stucco home: the visible edge is part of what you see every day, while the foam and caulk address gaps within the planned installation.
- Sherwin-Williams Power House 60-year White Caulk was the specified caulk product.
- Hardie trim materials formed part of the planned window finish.
- Paint materials were included for the trim work around the openings.
- The project allowed for disposal of installation debris.
- Cedar pollen is a familiar Central Texas condition, but this scope makes no claim that new windows eliminate it.
What was complete when the crew left?
The five-day on-site window installation ended January 21, 2026. At that point, the scope covered the Andersen units and the planned work around them: foam, trim, caulk and paint. That is the useful way to judge this project. It was not just a count of new windows; it was a window installation planned for a stucco exterior.
- All 48 windows belonged to this single Cedar Park project.
- The work was a retail home improvement project, not a roofing or siding replacement.
- The approved scope included both installation materials and finish-out labor.
- The project value fell in the $75,000–$100,000 range.
- January 21 marks the end of on-site work, not the start of the homeowner’s planning process.
Straight Answers
Questions About This Project
How long was the crew at the home?
The on-site window work ran for five days, January 17–21, 2026. The July inspection and September approval happened earlier and are not part of that installation window.
Why does stucco affect a window estimate?
This project included a stucco charge per window because working around those openings takes added labor. A price based on window units alone would not describe the 48-window scope here.
What size windows did the installation labor cover?
The scope listed standard-size window installation up to 132 united inches. That is a labor category, not a claim that every window in the home had the same dimensions.
Did the project include work beyond the window units?
Yes. The scope included OSI closed-cell spray foam, trim installation, caulk and paint, and interior and exterior finish-out. Those items explain why the finished opening matters as much as the selected 100 Series unit.
Get Your Free Windows Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Windows
Windows
WindowsOther work near this address
1.1 mi away
1.9 mi awayAll highlighted Austin Pro projects → · Austin Pro in Cedar Park → · Windows guides →