Recent Project: Cedar Park | Siding & Exterior Painting | 03-23-26 | APS-4753

James Hardie Select Cedar Mill 8.25" Fiber Cement Siding Installation | Full Sherwin Williams SuperPaint Exterior Repaint

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Siding

James Hardie

This Cedar Park siding project replaced worn cladding with James Hardie Select Cedar Mill in the 8.25-inch lap profile. We wrapped both garage door jambs and added brick pocket trim for clean, weathertight edges. Fiber cement was the right call here because it resists warping through Central Texas heat and hail. The finished walls sit flatter and straighter than the original boards ever did.

Learn More About Our Siding
Gutters to a House

Exterior Painting

Sherwin Williams

The exterior painting phase followed the new siding a few days later, using Sherwin Williams SuperPaint. We coated the siding, fascia and soffit up to 24 inches, the porch ceiling, and the garage doors. SuperPaint was chosen for its UV hold and mildew resistance in humid Cedar Park summers. The uniform finish ties the whole exterior together and protects the raw fiber cement.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through an internet search and reached out on February 24, 2026. They were tired of patching failing siding and wanted a durable, one-and-done fix for the Cedar Park home.

Evaluation

During the walkthrough we checked the sun-facing walls, the masonry transitions, and both garage door openings. The old boards showed cupping and lost paint adhesion, and the garage jambs needed wrapping. We noted the brick pocket detail as a spot where water was getting behind the cladding.

PLanning & Approval

We built an estimate covering James Hardie Select Cedar Mill siding plus a full Sherwin Williams SuperPaint scope. The homeowner approved the project on March 6, 2026. Material was scheduled for delivery through ABC Supply ahead of the crew's start date.

Installation

The siding phase kicked off on March 10 and ran a few days. The crew installed the 8.25-inch Select Cedar Mill, wrapped the split double garage door jambs, and set the 1x4 brick pocket trim at the masonry lines. Once the new boards were clean and settled, the paint crew coated the siding, fascia, soffit, porch ceiling, and garage doors.

Completion

We ran two rounds of yard cleanup and punch-out to catch every detail before finishing. The project was completed and invoiced on March 23, 2026. The homeowner is left with a sealed, freshly painted James Hardie exterior built for years of Central Texas weather.

Siding in Cedar Park | Austin Pro

We replaced the exterior cladding on this Cedar Park home with James Hardie fiber cement siding, then finished it with a full exterior paint job. The house went from tired and patchy to a clean, sealed shell built for Central Texas weather.

Project at a glance

  • Services: Siding and exterior painting
  • Location: Cedar Park, TX (78613)
  • Vendor & product: James Hardie Select Cedar Mill lap siding
  • Material: 8.25-inch primed fiber cement, plus 1x4 brick pocket trim
  • Timeframe: Approved March 6, siding started March 10, project closed out March 23, 2026
  • Standout outcome: A flatter, weathertight exterior sealed with Sherwin Williams SuperPaint

Why did this Cedar Park home need new siding?

The original cladding had taken years of abuse from hail, sun, and moisture. Boards had cupped and pulled loose in spots, leaving gaps where water and cedar pollen could work in.

The homeowner wanted a fix that would last, not another round of patching.

  • Failing sections around the garage were letting weather reach the jambs
  • Old boards had lost their paint hold on the sun-facing walls
  • The homeowner found us through an internet search and reached out in late February

What did the crew find on site?

Once we started pulling boards, the garage door openings needed the most attention. The jambs on the split double, two singles, needed to be wrapped so the new siding would seal cleanly against the frames. We also cut fresh brick pocket trim, the 1x4 detail where siding meets the masonry, so there would be no ragged edge left exposed to rain.

That brick pocket is a step a lot of crews skip. Skip it, and you get a gap that traps water against the wall and invites rot right where you can't see it. We built ours from primed material and labor on the same line, so the transition sits tight and paint-ready.

What materials did we use, and why?

We went with James Hardie Select Cedar Mill in the 8.25-inch profile. Fiber cement holds its shape through the freeze-thaw nights and 100-degree afternoons that wreck lesser boards.

The primed Cedar Mill also gives a real wood-grain texture without the maintenance headache of actual cedar.

  • JH 8.25" Select Cedar Mill primed lap boards across the main walls
  • Brick pocket trim in a 1" x 4" profile at the masonry lines
  • Garage door jambs wrapped for a sealed, finished edge
  • Material delivered through ABC Supply on a scheduled drop

How did the exterior painting go?

Paint followed the siding by a few days, once the new boards had settled and been cleaned down. We coated everything with Sherwin Williams SuperPaint, a product built to hold color under hard Central Texas UV and resist mildew through humid summers.

The crew didn't stop at the walls. We painted the fascia and soffit up to 24 inches, the porch ceiling, and both garage doors so the whole exterior reads as one finished piece.

  • Siding coated in Sherwin Williams SuperPaint for long-term color hold
  • Fascia and soffit painted up to 24 inches for a clean roofline
  • Porch ceiling and garage doors finished to match the body
  • Two rounds of yard cleanup and punch-out closed the job

What were the results?

The home now sits behind a straight, sealed wall of fiber cement with a uniform paint finish. Every edge, from the brick line to the garage jambs, is wrapped and protected.

  • Weathertight seal at all masonry and garage transitions
  • A wood-grain look that won't cup or split like the old boards
  • Full punch-out completed before we invoiced on March 23

Frequently asked questions

How long did the siding and painting take?

We started the siding phase on March 10, and it ran a few days. Painting wrapped shortly after, with the project completed and invoiced on March 23, 2026.

Why is fiber cement a good choice in Cedar Park?

The limestone-soil ground and wide temperature swings here punish wood and vinyl. Fiber cement stays dimensionally stable, so it won't warp in summer heat or crack after a hailstorm the way older cladding does.

What did this project cost?

This siding and exterior painting job fell in the $15,000 to $20,000 range. Final pricing depends on wall area, trim details, and how much of the exterior gets repainted.

Do you paint right onto the new Hardie board?

Yes. The Select Cedar Mill ships primed, so once it's installed and clean, we top it with SuperPaint. That combination seals the fiber cement and gives you the longest-lasting finish.

GAF shingle roofGAF Master Elite Certificate
No items found.