Completed March 2026
Siding & Exterior Painting in Palos Verdes, Lakeway, TX
We re-sided a home in the Palos Verdes neighborhood of Lakeway with James Hardie fiber cement, then painted the full exterior to match. The finished house now wears a tight, low-maintenance shell built for Central Texas weather.
- Trades
- Siding, Exterior Painting
- Location
- Palos Verdes, Lakeway, TX
- Completed
- Brands installed
- James Hardie, Sherwin Williams
Standout outcome — New sheathing, new siding, and a full repaint as one coordinated project
Timeframe — Siding started mid-March 2026, wrapped March 30
Job APS-4727
Drag to Compare
Before & After


Scope of Work
What We Did
James Hardie HardiePlank Select Cedar Mill Siding Installation · Full Sherwin Williams SuperPaint Exterior Repaint
Siding
For this Lakeway siding project, we installed James Hardie HardiePlank Select Cedar Mill 8.25" fiber cement over fresh 7/16" OSB sheathing. Fiber cement stands up to Central Texas heat and hail far better than the original boards. Our team replaced 10 squares of failing sheathing and rewrapped the garage door jamb during the four-day install. The result is a durable, cedar-textured exterior built to last through 100-degree summers.
Learn more about our siding replacement →Exterior Painting
This Lakeway exterior painting job used Sherwin Williams SuperPaint across the whole home. We coated the fresh HardiePlank siding, plus fascia, soffit, two shutters, the garage doors, gutters, downspouts, and porch ceiling. SuperPaint holds its color and resists fading under harsh Central Texas sun. Painting followed right after the siding install and gave the home a clean, uniform finish.
Learn more about our exterior house painting →Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
The homeowner found Austin Pro through an internet search and reached out in mid-January 2026. We heard from them on January 14, and the early conversation covered re-siding an aging Palos Verdes home and refreshing the full exterior.
Evaluation
January 20, 2026We started scoping the project on January 20, 2026, after an on-site look. Our inspection flagged failing wall sheathing and old cladding that no longer held paint, which shaped the scope.
Planning & approval
February 5, 2026The project was approved on February 5, 2026. Selections locked in James Hardie HardiePlank Select Cedar Mill at 8.25" and Sherwin Williams SuperPaint for the exterior finish.
Installation
Crews started the siding install in mid-March, replacing about 10 squares of OSB before hanging the new lap boards. They wrapped the double garage door jamb and reset corrugated roofing, then the painting phase followed close behind.
Completion
March 30, 2026We completed the job on March 30, 2026, with two yard clean and punch passes to finish. The job closed out on April 23, 2026, leaving a sealed exterior and a uniform painted finish.
4 Photos
Project Photos
Every photo is this job, shot on site by our crew in Palos Verdes, Lakeway, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Lakeway home need new siding?
The old exterior had reached the end of its life. Some wall sections were soft, and the surface no longer held paint well.
Fiber cement was the right call for this address. Here is what drove the decision:
- Lakeway sits on limestone soil with long stretches of 100-degree heat
- Wood and composite siding warp and swell in that kind of climate
- Spring hail is a real threat here, and thin materials dent easily
- Cedar pollen season coats everything, so a washable surface matters
What did the crew find during teardown?
Once the old cladding came off, we found the OSB underneath had taken on moisture and lost its bite. Fiber cement is heavy, and it needs a flat, sound base to fasten into. If you nail new siding over soft sheathing, the fasteners pull loose and the boards wave over time. We removed about 10 squares of that failing OSB and installed fresh 7/16" sheathing before a single plank went up. That step is invisible when the job is done, but it is the difference between siding that lasts decades and siding that fails in a few years.
What materials went on the home?
We used HardiePlank Select Cedar Mill lap in the 8.25" profile. The Cedar Mill texture gives a soft woodgrain look without the upkeep of real cedar.
Key parts of the job:
- Primed Select Cedar Mill lap boards across the walls
- New 7/16" OSB wall sheathing where the old panels were removed
- Double garage door jamb wrap for a clean, sealed edge
- Removed and reset the corrugated roofing to work behind it
- ABC Supply delivery for material staging on site
How did the painting phase go?
The repaint followed close on the heels of the siding install. We coated every exterior surface with Sherwin Williams SuperPaint, which holds its color under relentless Texas sun.
Prep came first, and that is where most DIY jobs go wrong. Old paint on the garage doors and porch ceiling was peeling, so we stripped it back before priming. Painting fresh coats over failing paint just traps the problem underneath. Once the surfaces were sound, we rolled and sprayed the siding, then hit the trim and details by hand.
Surfaces we painted:
- The new HardiePlank siding and primed lap
- Fascia and soffit up to 24"
- Both garage doors and a set of two shutters
- Gutters and downspouts, priced per linear foot
- The porch ceiling
What was the final result?
The home now has a sealed, weather-ready exterior and a uniform finish from the porch to the roofline. Two rounds of yard cleanup and punch items closed out the job with nothing left behind.
- Siding and paint completed March 30, 2026
- Two full yard clean and punch passes
- Garage jamb, fascia, and soffit all detailed to match
- Project closed out April 23, 2026
Straight Answers
Questions About This Project
How long did this project take?
The siding install began in mid-March 2026 and ran across several days. Painting followed right after, with everything finished by March 30 and the job closed out on April 23.
Why is fiber cement worth it in Lakeway?
Fiber cement resists the swelling, cracking, and pest damage that plague wood siding in our climate. It also stands up to hail far better than thin composite, which matters every spring in the Hill Country.
What did a project like this cost?
This job landed in the $15,000 to $20,000 range. That covered the siding, new sheathing, the double garage jamb wrap, and the complete exterior repaint.
Do I need to seal HardiePlank myself later?
No. The SuperPaint finish protects the boards, and fiber cement does not need annual staining like cedar. A simple wash to clear pollen and dust each spring keeps it looking sharp.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address
0.2 mi away
3.9 mi awayAll highlighted Austin Pro projects → · Austin Pro in Lakeway → · Siding guides →