
Completed August 2025
Siding in Hogeye, Manor, TX
Plus Windows, Exterior Painting, Doors on the same job
We replaced every window and re-clad the entire exterior of a home in Hogeye, Manor, TX, swapping old cladding for James Hardie fiber cement. The finished house is tighter, tougher, and built for Central Texas weather.
- Trades
- Siding, Windows, Exterior Painting, Doors
- Location
- Hogeye, Manor, TX
- Completed
- Brands installed
- James Hardie, NT Windows, Sherwin Williams, Pella
Standout outcome — A full exterior reset with a Sherwin Williams Super Paint finish
Timeframe — First contact in February 2025, completed August 21, 2025
Job APS-4490
Drag to Compare
Before & After


Scope of Work
What We Did
Full James Hardie Cedar Mill 8.25" Lap Siding Installation · NT Windows Replacement With New OSB Sheathing
Siding
This Manor, TX siding project used James Hardie Primed Select Cedar Mill 8.25" lap, a fiber cement built for our climate. We first installed new 7/16" OSB wall sheathing to give the siding a solid, flat base. Fiber cement shrugs off the swings between 100-degree summers and spring hail far better than wood. We finished everything in Sherwin Williams SuperPaint, including fascia, soffit, and the doors.
Learn more about our siding →Windows
For this Manor, TX window job we installed the NT Windows Executive series, a vinyl replacement window. We set the windows before the siding so the new fiber cement could tie in tight around every frame. Vinyl resists warping in 100-degree heat and needs almost no upkeep. The upgrade improves comfort and helps lower cooling bills through the long Central Texas summer.
Learn more about our windows →Exterior Painting
Doors
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
February 13, 2025The homeowner found Austin Pro through an internet search and reached out on February 13, 2025. The first conversation covered worn siding and dated windows on their Hogeye home. We set up a site visit to see the full exterior in person.
Evaluation
March 3, 2025During the assessment, we inspected the cladding, sheathing, fascia, and soffit along with every window opening. The old walls showed hail damage and sun wear, and the sheathing was soft in places. By March 3, 2025, we were working up the estimate, with a clear scope forming.
Planning & approval
May 12, 2025We walked the homeowner through James Hardie Cedar Mill options, NT Windows units, and a Sherwin Williams color plan. Material and delivery were coordinated through ABC Supply Co. and Garrett James. The homeowner approved the full plan on May 12, 2025.
Installation
August 21, 2025The crew completed the work on August 21, 2025. Windows went in first, followed by new 7/16" OSB sheathing, then the 8.25" Cedar Mill lap siding. Painters finished the siding, fascia, soffit, and three exterior doors before punch-out.
Completion
September 9, 2025After a full walkthrough and two yard cleanups, we cleared the punch list. The finished exterior gave the home a fresh, weather-ready envelope. The job closed out on September 9, 2025.
5 Photos
Project Photos
Every photo is this job, shot on site by our crew in Hogeye, Manor, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Hogeye home need new siding?
The old cladding had taken years of Central Texas abuse. Between hail hits, cedar pollen buildup, and summers over 100 degrees, it was worn past the point of patching.
- Original walls needed all-new sheathing, not just a resurface
- Fascia and soffit showed sun damage up to the 24" mark
- Three exterior doors, one French and two singles, needed refinishing too
What did we find once we opened the walls?
Pulling the old siding told the real story. The sheathing underneath had softened in spots, so we didn't gamble on it. We installed brand-new 7/16" OSB wall sheathing across the whole home before a single board of siding went up. That extra step matters here. Manor's limestone soil and heat cycles put constant stress on a wall assembly, and a solid, uniform substrate is what keeps fiber cement flat and fastened for decades. Skipping it is the most common shortcut we see, and it always comes back to haunt the homeowner.
Why James Hardie Cedar Mill for this house?
We chose the Primed Select Cedar Mill 8.25" lap because it delivers a real wood-grain look without wood's weaknesses. Fiber cement won't rot, warp, or feed the moisture that cedar pollen loves to trap.
- 8.25" exposure gives a clean, generous shadow line
- Primed boards took the Sherwin Williams Super Paint evenly
- Painted fascia and soffit tied the trim into the body color
- Material and delivery ran through ABC Supply Co. and Garrett James
Why replace the windows first?
Sequence is everything on a combined job. We set the new windows through NT Windows before the siding, so each unit could be flashed and sealed against the fresh sheathing. Doing it in that order stops water from ever sneaking behind the cladding. It also means the siding laps neatly over the window flanges instead of butting awkwardly against them. A homeowner who reverses this order often ends up with leaks at the corners and no easy way to fix them. Tight, well-flashed windows also hold cooled air inside through the worst of an Austin-area summer.
How did installation day go?
With planning done, the crew handled the full scope in a focused push on August 21, 2025. Windows went in, then sheathing, then siding, then paint and punch-out.
- New OSB sheathing installed across all walls
- Cedar Mill lap fastened and sealed
- Sherwin Williams Super Paint on siding, fascia, soffit, and doors
- Two yard cleanups plus a full punch list closed the job
Straight Answers
Questions About This Project
How long did the whole project take from start to finish?
The homeowner reached out on February 13, 2025, and approved the plan on May 12. Field work wrapped on August 21, 2025, and the job closed out on September 9.
Is fiber cement worth it in the Manor heat?
Yes. Fiber cement stays dimensionally stable when temperatures push past 100 degrees, unlike wood that swells and shrinks. It also stands up to hail and won't rot in humid stretches after storms.
What did this exterior overhaul cost?
This full siding-and-window project landed in the $50k–$60k range. That covered new sheathing, James Hardie lap siding, replacement windows, and a complete paint finish including three doors.
Why paint primed siding instead of leaving it?
Primed board is ready for paint but not weatherproof on its own. The Sherwin Williams Super Paint topcoat seals the surface, locks in color, and adds another shield against Central Texas sun and rain.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5











