James Hardie Siding & Windows in Eagle Ridge, Austin — completed project by Austin Pro

Completed October 2026

Siding & Windows in Eagle Ridge, Austin, TX

We replaced third-story siding and 12 windows at this Eagle Ridge home in Austin, TX. The finished work paired new aluminum window units with a freshly painted upper-story exterior.

Trades
Siding, Windows
Location
Eagle Ridge, Austin, TX
Completed
Brands installed
James Hardie, NT Windows

Standout outcome — A coordinated exterior update confined to the home's third story, rather than a whole-house replacement.

Timeframe — On-site work extended from September 22–October 23, including separate installation, painting, and final-check visits.

Neighborhood/City — Eagle Ridge, Austin, TX.

Vendors and products — James Hardie 8.25-inch Select Cedar Mill and NT Windows Twinsulator.

Job APS-4922

Drag to Compare

Before & After

After: James Hardie siding & windows completed in Eagle Ridge, Austin
Before the siding & windows project — home exterior in Eagle Ridge, Austin
Before
After

Scope of Work

What We Did

Third-Story James Hardie Siding with a Custom Light Yellow Finish · 12 NT Windows Twinsulator Aluminum Window Replacements

Siding

This siding project in Austin, TX, focused only on the home's third story. We used James Hardie 8.25-inch Select Cedar Mill fiber cement siding. The scope paired the exterior boards with wall sheathing and R-13 insulation for work beyond the surface. Sherwin Williams Super Paint supplied the custom light yellow finish.

James Hardie8.25" Select Cedar MillFiber Cement Siding$5k–$10k
Learn more about our siding replacement →

Windows

We installed 12 NT Windows Twinsulator aluminum replacement windows on the third story. This Austin, TX, window project paired new units with siding work on the same level. Coordinating both trades kept the upper-story exterior within one project scope. The crew installed the windows before returning for the siding.

NT WindowsTwinsulatorAluminum Replacement Windows$10k–$15k
Learn more about our window replacement →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

The homeowner found Austin Pro through an online search. The project centered on siding and replacement windows for the home's third story in Eagle Ridge.

Evaluation

We assessed the third-story siding and window scope together. The planned work included wall sheathing and R-13 insulation in addition to the exterior boards and replacement units.

Planning & approval

The selections included James Hardie Select Cedar Mill siding and NT Windows Twinsulator aluminum replacements. We ordered the 12 windows on August 13, and they arrived in mid-September. The siding finish called for Sherwin Williams Super Paint in a custom light yellow.

Installation

Our crew installed the windows on September 22–23. We installed the siding on October 5. Rain delayed painting, and the new boards received their finish coat on October 14.

Completion

We finished the final project check on October 23. That visit included paint touch-ups and hanging lights. The completed work brought the third-story siding and window scope through its remaining finish details.

7 Photos

Project Photos

Every photo is this job, shot on site by our crew in Eagle Ridge, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

What did the third-story scope actually include?

This Eagle Ridge project covered more than the visible boards and glass. The siding scope also included wall sheathing and insulation, so the work addressed parts of the wall behind the finished surface.

  • 7/16-inch OSB wall sheathing formed part of the wall assembly.
  • R-13 roll-in insulation was included alongside the exterior work.
  • Primed boards were specified for a finish applied after installation.

For a homeowner comparing siding proposals, those details matter. A board replacement and a wall project that includes sheathing and insulation are not the same scope. Here, the upper-level work included both visible materials and supporting wall components. Comparing only the siding brand would miss part of what we installed.

Why did the primed siding need a separate painting visit?

The primed Select Cedar Mill boards still needed their finish coat after installation. We used Sherwin Williams Super Paint in a custom light yellow, rather than treating the primer as the final surface. Rain delayed that step, so we kept exterior painting separate from the board installation. That distinction matters: getting the siding onto the wall did not mean the exterior was finished.

Austin homeowners often plan around 100°+ summer heat, but rain can also change an exterior schedule. On this project, wet weather affected the coating work, not the already completed window installation. We waited to complete the siding's painted finish instead of presenting the board-installation date as the end of the project. For your own siding work, ask whether the schedule covers installation alone or the finished coating too.

How did the windows fit into the siding schedule?

The homeowner's 12 replacement units were ordered on August 13 and arrived in mid-September. Our crew installed them on September 22–23, before moving into the siding portion of the project.

  • The selected product was NT Windows Twinsulator.
  • The replacement units used aluminum frames.
  • Every window in this scope was on the third story.

That sequence gave this project a clear order: windows first, exterior boards next, then paint. It also separates material waiting time from installation time. The August order date was not the start of on-site window work, and the September delivery did not mark completion. If you are planning windows in Austin, ask for those dates separately so you know what each one means.

Was the siding replacement really a one-day job?

The crew installed the siding on October 5, but that was only one part of this combined project. The homeowner still had painting and the final project check ahead, so I would not describe the overall work as a one-day installation.

  • The new siding received its finish coat on October 14.
  • Rain caused the gap between board installation and painting.
  • The last on-site work took place on October 23.

The distinction is useful if you are arranging access or planning around exterior work. A single day for installing boards can sit inside a longer schedule that includes other trades. Here, the windows had already taken their own installation visit, and the coating work needed another. The right timeframe was the full on-site window, not just the fastest part of it.

What did the final project check cover?

Our final check brought the siding and window project through the remaining finish details. We completed paint touch-ups and hung lights as part of that last visit, rather than stopping at the major installations.

  • Paint corrections addressed the newly finished exterior.
  • Light fixtures were part of the remaining completion tasks.
  • The scope included two yard cleanups alongside the final corrections.

These smaller items matter on a third-story exterior project because the main materials are only part of the finished result. New siding can be installed and painted while details still need attention. I treat that last check as part of the work, not an optional return visit. Here, it marked the completion of the homeowner's combined siding and window project.

How should you compare a similar Austin exterior proposal?

Start by checking whether the proposal covers the same building level and wall components. This Eagle Ridge project was limited to the third story, so it should not serve as a whole-house siding or window comparison.

  • Confirm whether wall sheathing is included, rather than assuming every siding price covers it.
  • Check whether insulation appears separately from the exterior boards.
  • Ask whether a primed product includes a field-applied finish in the quoted scope.

Austin's hail, cedar pollen, and intense sun give homeowners plenty to consider, but product names alone do not explain a project's coverage. For this home, the useful comparison points were the defined upper-story area, the supporting wall materials, and the separate finishing work. Those specifics tell you more than a broad promise about a new exterior.

Straight Answers

Questions About This Project

What was the investment range for this project?

The combined siding and window project fell in the $15,000–$20,000 range. That range applies to this third-story scope, not a full exterior replacement throughout the home.

Does an 8.25-inch siding board mean that much surface stays visible?

No. The 8.25-inch measurement identifies the selected James Hardie board width; lap siding overlaps during installation. Do not use that number alone to calculate finished wall coverage.

Does aluminum framing tell me how a window will perform in Austin heat?

Not by itself. For the Twinsulator units selected here, ask about the complete window's glass package and rated performance. Frame material alone is not enough to judge comfort during a 100°+ Austin summer.

Should I expect every siding project to include insulation?

No. R-13 roll-in insulation was part of this home's scope, but you should confirm that item in your own proposal. A siding replacement does not automatically mean the contractor will replace insulation behind every wall.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment