Holiday Savings

10% off every exterior project, and it stacks up to 25% off.10% off exterior projects

40 days leftSee the deals
Andersen Windows in Jester Point, Austin — completed project by Austin Pro

Completed October 2024

Windows in Jester Point, Austin, TX

We installed windows from Andersen at a Jester Point home in Austin, TX. The two-day job covered standard and oversized openings, sealing, and stone mortar repair.

Trades
Windows
Location
Jester Point, Austin, TX
Completed
Brands installed
Andersen

Standout outcome — New windows installed across two opening-size categories, with related stonework completed

Timeframe — October 8–9, 2024; two days on site

Vendor and product — Andersen 100 Series

Job APS-4214

Scope of Work

What We Did

Andersen 100 Series Fibrex Composite Window Installation · Standard and Oversized Window Openings with Stone Mortar Repair

Windows

This Windows in Austin, TX project included standard and oversized window installations in Jester Point. The homeowner selected Andersen 100 Series windows made with Fibrex composite frames, a practical fit for Austin’s summer heat. Our crew sealed the openings and completed stone mortar repair. On-site work took two days.

Andersen100 SeriesFibrex Composite Windows$40k–$50k
Learn more about our window replacement →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what windows typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

July 18, 2024

The homeowner found Austin Pro through an online search and reached out on July 18, 2024. We discussed a window project for the Jester Point home and arranged an on-site evaluation.

Evaluation

July 22, 2024

We inspected the home and began the estimate on July 22, 2024. The scope accounted for both standard and oversized window openings, plus stone mortar repair. A window technician measure was included in the plan.

Planning & approval

July 25, 2024

The homeowner approved the window project on July 25, 2024. The plan specified Andersen 100 Series Fibrex composite windows and included delivery, installation materials, and labor for both opening-size categories.

Installation

The crew installed windows at the home over two days, October 8–9, 2024. Work included standard and oversized openings, closed-cell spray foam, clear caulk specified for colored frames, and stone mortar repair. Scaffolding and disposal were also part of the scope.

Completion

October 9, 2024

The crew finished the on-site work on October 9, 2024. The completed scope covered the Andersen window installation and the related sealing and stone mortar work.

10 Photos

Project Photos

Every photo is this job, shot on site by our crew in Jester Point, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

How did the Jester Point window project take shape?

The homeowner found Austin Pro through an online search and reached out on July 18, 2024. We visited the home on July 22 to inspect the window openings and begin the estimate. That visit gave us a basis for planning the installation before anyone brought windows to the site. The homeowner approved the project on July 25, leaving time for measuring, ordering, and delivery before the October installation.

  • Window cost and a delivery fee were part of the approved scope.
  • A window technician measure was included before installation.
  • The plan called for both window installation labor and materials.

Window replacement is easy to picture as a simple swap. This project needed more planning than that: the scope included openings in two size categories and repair to surrounding stone mortar. Accounting for those tasks early helped us plan the crew’s work around the full opening, not just the new frame.

Why use Fibrex composite windows for this Austin home?

The homeowner selected Andersen 100 Series Fibrex composite windows for the Jester Point project. Fibrex gave us a composite frame option suited to a place where summer temperatures can top 100°F. Frame choice was only part of the decision, though. The installation also needed a seal around each opening and attention to the adjacent stonework; a new window alone would not complete that work.

  • The project specified clear caulk for use at colored-frame joints.
  • Closed-cell spray foam was included among the installation materials.
  • Stone mortar repair was a separate part of the window scope.

That distinction matters if you are comparing window proposals. Check whether the price covers the work around the opening, not only the units themselves. On this home, sealing materials and mortar repair were included alongside the Andersen windows.

What did measuring tell us about the openings?

The installation plan separated standard-size windows from oversized ones. That matters because the scope used a 132 UI cutoff for labor, rather than treating every opening alike. We included a technician measure so the window sizes could be checked before installation.

  • Standard installation applied to windows up to 132 UI.
  • Oversized installation applied to windows greater than 132 UI.
  • Scaffolding was included in the work plan.
  • Delivery was listed separately from installation labor.

Those details are worth checking on a home with varied window openings. A measurement threshold affects how an installer plans the work, while scaffolding affects access. Neither is something you can judge from a photo of the finished windows. Here, both were addressed in the project scope before the crew began on site.

How did the two-day installation go?

Our crew worked at the Jester Point home from October 8 through October 9, 2024. The job covered installation of both size categories, plus the materials and site work needed around the openings. We finished the on-site work on October 9; this was not a same-day window installation.

  • The crew used closed-cell spray foam as part of the window installation.
  • Clear caulk was specified for joints at colored frames.
  • Foam cleaner was included with the installation materials.
  • The scope included a dump fee for disposal.

There is a practical reason to allow time for work beyond setting the frames. Sealing and repairs take place at the edges homeowners will live with after the crew leaves. In Austin, where heat and cedar pollen put windows through regular use, those surrounding details deserve attention too. The two-day schedule allowed for the full listed scope, not just placing the units.

What happened to the stonework around the windows?

Stone mortar repair was part of this window project. We treated it as a piece of the installation, rather than assuming the new frames would cover every area around the openings. That is an important difference when you review the scope for a home with stone beside its windows.

  • The repair was listed as window-related labor.
  • Installation materials were included alongside the window units.
  • Access equipment was accounted for in the project plan.

Austin homes often have exterior finishes that require care when windows are changed. Limestone soil and long, hot seasons are part of the local setting, but they do not tell you the condition of a particular opening. We worked from this home’s measured window plan and its listed mortar repair, rather than making assumptions based on the neighborhood.

What was finished on October 9?

The crew completed the on-site window work on October 9, 2024. By then, the project covered the Andersen units, installation in standard and oversized openings, sealing materials, and the stone mortar work. The result was a completed window replacement scope, not just a delivery of new frames.

  • The approved project value was in the $40,000–$50,000 range.
  • The work was a residential retail window project.
  • No other exterior service was part of this job.

For a homeowner comparing projects, the scope is the useful takeaway. The value range reflects more than the windows themselves: measurement, delivery, access, labor, materials, repair, and disposal all appeared in this project. Those items help explain what the crew needed to complete during its two days at the home.

Straight Answers

Questions About This Project

How long did the window crew work at the home?

The on-site installation ran from October 8 to October 9, 2024. The homeowner had approved the Jester Point project in July, but that earlier planning period was not time spent installing windows.

What does 132 UI mean in this project?

UI means united inches, a window-sizing measure based on width plus height. This scope used 132 UI to distinguish standard-size installation labor from labor for larger openings; it does not state how many windows fell into either group.

Did the window price include work beyond the Andersen units?

Yes. The $40,000–$50,000 project range covered a scope that included measuring, delivery, installation, sealing materials, stone mortar repair, scaffolding, and disposal. It should not be read as the price of the window units alone.

Is there a warranty listed for these windows?

The project scope identifies Andersen 100 Series Fibrex composite windows but does not specify warranty terms. If you are comparing coverage for a similar installation, ask for the product and labor terms in writing before approval.

Get Your Free Windows Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment