James Hardie Siding & Exterior Painting in Canyon Ridge, Austin — completed project by Austin Pro

Completed August 2026

Siding & Exterior Painting in Canyon Ridge, Austin, TX

We installed James Hardie fiber cement siding and completed exterior painting on this Austin, TX home. The result was a Colonial Smooth siding profile, with paint that also covered trim, doors, gutters, and the porch ceiling.

Trades
Siding, Exterior Painting
Location
Canyon Ridge, Austin, TX
Completed

Standout outcome — The siding project also covered painted trim and other specified surfaces, rather than stopping at the wall faces.

Timeframe — Four on-site days, August 7–10, 2026.

Vendor and product — James Hardie Colonial Smooth and Sherwin Williams SuperPaint.

Job APS-4870

Drag to Compare

Before & After

After: James Hardie siding & exterior painting completed in Canyon Ridge, Austin
Before the siding & exterior painting project — home exterior in Canyon Ridge, Austin
Before
After

Scope of Work

What We Did

James Hardie Colonial Smooth Fiber Cement Siding with 7/16-Inch OSB Sheathing · Sherwin Williams SuperPaint Across Siding, Trim, Doors, and Porch Ceiling

Siding

This Siding in Austin, TX project paired James Hardie Colonial Smooth fiber cement siding with wall sheathing work. The scope specified 7/16-inch OSB sheathing rather than treating the visible siding as the whole job. Fiber cement offered a practical material choice for an exterior exposed to Austin's intense summer heat. The finished work gave the home its selected smooth siding profile.

James HardieColonial SmoothFiber Cement Siding$10k–$15k
Learn more about our siding replacement →

Exterior Painting

This Exterior Painting in Austin, TX project used Sherwin Williams SuperPaint on the siding and other exterior details. The scope extended to fascia and soffits up to 24 inches, plus the porch ceiling. Doors, garage doors, gutters, and downspouts were also included. Painting these surfaces brought the broader exterior finish into the same project.

Sherwin WilliamsSuperPaintExterior Paint$5k–$10k
Learn more about our exterior house painting →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

June 2, 2026

A James Hardie referral brought the homeowner to us on June 2, 2026. We started scoping the project on June 6.

Evaluation

The scope covered siding, 7/16-inch OSB wall sheathing, and several exterior surfaces for paint. We kept those parts of the work distinct while defining what the crews would cover.

Planning & approval

June 22, 2026

The project was approved on June 22, 2026. The plan paired James Hardie Colonial Smooth fiber cement siding with Sherwin Williams SuperPaint and included custom siding work. It also called for paint on doors, garage doors, gutters, downspouts, fascia, soffits, and the porch ceiling.

Installation

August 10, 2026

On-site work ran from August 7 through August 10, 2026. Across that four-day window, the crew handled the scoped wall sheathing, Colonial Smooth siding, and exterior paint work.

Completion

August 10, 2026

August 10, 2026, was the final on-site day. The scope included yard cleanups and punch-out work.

7 Photos

Project Photos

Every photo is this job, shot on site by our crew in Canyon Ridge, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why combine siding and painting on this Austin home?

The approved scope covered both trades, so we planned the siding finish and paint work together. That matters when you want the visible wall surfaces and nearby details addressed under one project, without assuming every exterior surface is included.

  • The homeowner came to us through a James Hardie referral on June 2, 2026.
  • We started scoping the project on June 6.
  • Approval followed on June 22, well before the August installation window.

This job covered siding and painting, not a roof, window, or gutter replacement. In Austin, hail can prompt a homeowner to look closely at the whole exterior, so it helps to keep the work you order separate from other work you might consider.

What did the wall work require beneath the siding?

The siding scope included wall sheathing, specifically 7/16-inch OSB. That told our crew the job involved more than attaching Colonial Smooth over an existing wall surface. We had to account for the backing as part of the siding work.

That distinction is useful if you are comparing siding proposals. A quote that names only the finish material may not describe what happens at the wall beneath it. Here, the scope covered both sheathing and custom Colonial Smooth work. Spelling out both made the project easier to plan and easier to check at punch-out.

Why choose Colonial Smooth fiber cement for this project?

Colonial Smooth fiber cement gave this Austin home the specified siding profile without treating paint as a substitute for new cladding. The material and finish were selected together in the approved scope, a sensible pairing for an exterior exposed to 100°+ summer days.

The smooth profile also affects how the finished wall reads. You notice the siding lines, not a heavy surface texture. A common mistake is to focus only on paint color while overlooking the siding material and the surface beneath it. This project addressed those as separate parts of the work: fiber cement for the cladding, OSB where sheathing was scoped, and SuperPaint for the painted finish.

How did we handle the multi-day installation?

This was a four-day on-site siding and painting job. The crew had to coordinate wall work, custom siding, and paint across the scheduled window.

  • The siding work included both standard Colonial Smooth and custom Colonial work.
  • Delivery fees were included for the materials needed on site.
  • Painting was part of the installation scope, not a separate future project.

The August 10 completion date marks the last day of on-site work. The earlier June dates cover first contact and approval, not weeks spent installing siding. If you are planning around a similar job, that difference matters: the planning timeline and a crew's time at your home answer two different questions.

Which details were included in the paint scope?

SuperPaint was specified for the siding, but the exterior painting scope went further. It also covered fascia and soffits up to 24 inches. Those boundaries are worth checking before you assume a painting proposal covers every edge of the house.

  • Garage doors and entry doors were painted as separate items.
  • Gutters and downspouts were included by linear-foot scope.
  • The porch ceiling was painted as its own surface.

Cedar pollen is a familiar Austin maintenance issue, especially on exposed finishes, so it helps to know exactly which surfaces were painted. That list also helps you judge the finished job without adding work that was never ordered.

What closed out the siding and painting work?

The scope called for two yard cleanups and punch items, followed by punch-out work. Those steps gave us a defined way to address remaining details after the main siding and paint tasks.

  • On-site work finished August 10, 2026.

For the homeowner, the practical result was a completed siding installation paired with the exterior paint work. When reviewing a job like this, look closely at the doors, porch ceiling, and other surfaces that are easy to miss in a quick look from the street.

Straight Answers

Questions About This Project

How long was the crew at the home?

Installation ran from August 7 through August 10, 2026. That is four on-site days for this Austin siding and painting project; the June contact and approval dates are not part of the installation duration.

What did this project cost?

This combined siding and exterior painting project fell in the $15k–$20k range .

Did the job include replacing the gutters or garage doors?

No. The project called for paint on the gutters, downspouts, and garage doors, which is different from installing new units.

What warranty covers the siding and paint?

Coverage depends on the specific James Hardie siding and Sherwin Williams paint used, so check your contract and the product warranty paperwork for details. The job also included punch-out work after the main siding and paint tasks.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment