
Completed July 2026
Siding in Maple Run, Austin, TX (July 2026)
Plus Exterior Painting, Gutters on the same job
We replaced the exterior siding and gutters on this Maple Run home in Austin, TX, using James Hardie HardiePlank Select Cedar Mill. The finished exterior looks sharp, sits on a solid new sheathing base, and is built for Central Texas weather.
- Trades
- Siding, Exterior Painting, Gutters
- Location
- Maple Run, Austin, TX
- Completed
- Brands installed
- James Hardie, Sherwin Williams
Standout outcome — A wood-look exterior that resists heat, hail, and humidity
Finish — Sherwin Williams Super Paint
On-site window — July 17 to July 20, 2026 (4 days)
Job APS-4849
Drag to Compare
Before & After


Scope of Work
What We Did
Complete James Hardie HardiePlank Select Cedar Mill Fiber Cement Siding Installation · Full Gutter Replacement with New OSB Wall Sheathing and Sherwin Williams Finish
Siding
This siding project in Austin, TX used James Hardie HardiePlank Select Cedar Mill 8.25" fiber cement over new 7/16" OSB wall sheathing. Fiber cement holds up to Central Texas heat and hail far better than old wood siding. We wrapped the double garage door jambs and painted the fascia, soffit, and porch ceiling too. Sherwin Williams Super Paint sealed everything for durable curb appeal.
Learn more about our siding replacement →Exterior Painting
Gutters
For this gutter job in Austin, TX we hauled off the old gutters and fitted new Senox seamless aluminum gutters. Seamless aluminum resists rust and handles heavy Texas downpours without splitting at the seams. Fewer joints also mean fewer clogs from cedar pollen and debris. Paired with the new James Hardie siding, the gutters help keep water away from the walls and foundation.
Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
June 2, 2026The homeowner found Austin Pro through our Local Service Ads and reached out on June 2, 2026. The first conversation covered the aging exterior and the plan to replace both siding and gutters on the Maple Run home.
Evaluation
June 3, 2026By June 3, 2026, we had evaluated the home's cladding, gutters, and fascia. The inspection confirmed the old siding was weathered and the gutters were near the end of their life, and it flagged the need for new wall sheathing underneath.
Planning & approval
June 4, 2026The project was approved on June 4, 2026, just two days after first contact. During planning we locked in James Hardie HardiePlank Select Cedar Mill, the 7/16-inch OSB sheathing, and the Sherwin Williams Super Paint color, along with the gutter removal scope.
Installation
July 20, 2026Crews were on site from July 17 through July 20, 2026, a four-day window. Work moved from new OSB sheathing to hanging the 8.25-inch HardiePlank, wrapping the double garage door jambs, and setting the new gutters, with painting following the siding install.
Completion
July 20, 2026We wrapped the job on July 20, 2026, with two yard cleanups and a final punch-out. The project closed out that day, leaving a fresh fiber cement exterior, painted fascia and porch ceiling, and gutters ready for the next Central Texas storm.
4 Photos
Project Photos
Every photo is this job, shot on site by our crew in Maple Run, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Maple Run home need new siding?
Many homes in this pocket of southwest Austin were built in the 1980s and 1990s. Their original cladding tends to fade, crack, and pull away from the wall over time. That opens the door to moisture and pests.
This home showed the usual wear you would expect from decades of sun and storms.
- Aged siding with visible weathering
- Old gutters near the end of their service life
- Fascia and soffit ready for a fresh coat
- A double garage door jamb that needed proper wrapping
What did we find once we opened the walls?
Siding jobs always tell you the truth once the old material comes off. On this home, we pulled the existing cladding and inspected the wall behind it before anything new went up. That is the step most homeowners never see, and it is where a job is won or lost. We chose to install fresh 7/16-inch OSB wall sheathing to give the new HardiePlank a flat, dependable surface to fasten to. Skip that base and you get wavy walls, loose panels, and gaps that let water in.
- New 7/16" OSB sheathing across the walls
- A level plane for clean, straight siding lines
- Solid fastening depth for every course
What materials did we use, and why?
We went with James Hardie HardiePlank in the Select Cedar Mill texture, 8.25 inches wide. Fiber cement is the right call for Austin. It does not warp in 100-degree summers, it handles hail far better than wood, and it will not feed the mold that our humid stretches encourage. The Select Cedar Mill grain gives you the look of real cedar without the upkeep. Cedar pollen season alone is hard enough here without adding wood rot to your list.
- 8.25" Select Cedar Mill primed lap siding
- Field-finished with exterior paint from Sherwin Williams
- Double garage door jamb wrapped for a clean edge
- Fascia and soffit painted up to 24 inches
- Porch ceiling painted to match
How did the gutter work fit in?
New siding and old gutters do not belong on the same house. We removed and disposed of the existing gutters by the linear foot, then reset the run against the refreshed fascia. Good drainage matters a lot on Austin's limestone soil, where standing water near the slab can shift a foundation.
- Full removal and haul-off of the old gutter run
- New line aligned with the freshly painted fascia
- Runoff directed cleanly away from the foundation
How did the installation go?
Crews worked the home over four days, from July 17 through July 20, 2026, with paint following the siding install. We sheathed, hung the HardiePlank, wrapped the garage door jambs, and set the gutters. Two yard cleanups and a punch-out closed things out.
- Day-by-day progression from sheathing to finish coat
- Materials delivered through ABC and Southern Shingles
- Two full yard cleanups plus a final punch list
- Completed and closed on July 20, 2026
Straight Answers
Questions About This Project
How long did the siding and gutter project take?
On-site work ran four days, from July 17 to July 20, 2026. The homeowner first reached out in early June, so planning and approvals happened well before crews arrived.
Why is fiber cement better than wood siding in Austin?
Fiber cement stands up to hail and does not warp under repeated 100-degree heat. It also resists moisture and rot, which matters during our humid summers and long allergy seasons.
What does a project like this cost?
This retail siding and gutter job fell in the $20,000 to $25,000 range. Final pricing depends on wall area, sheathing needs, and paint scope, so every home is quoted individually.
Does the new siding come with a warranty?
James Hardie backs HardiePlank with a strong manufacturer warranty on the fiber cement product. Our installation workmanship is covered as well, so you have support on both the material and the labor.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address










