Siding in Milwood, Austin, TX — completed Austin Pro project

Completed August 2024

Siding & Windows in Milwood, Austin, TX (August 2024)

We re-clad a 1980s-era home in Milwood with James Hardie fiber cement siding and replaced four windows, giving this Austin exterior a fresh, weather-tough shell. The job wrapped on August 30, 2024.

Trades
Siding, Windows
Location
Milwood, Austin, TX
Completed
Project value
$20k–$25k
Brands installed
James Hardie, NT Windows

Standout outcome — A sealed, uniform exterior finished in Sherwin Williams Super Paint

Timeframe — Approved May 3, 2024; windows in June; siding and paint in July; closed September 19, 2024

Job APS-4119

Drag to Compare

Before & After

After: Siding in Milwood, Austin, TX by Austin Pro
Before: Siding in Milwood, Austin, TX
Before
After

Scope of Work

What We Did

Complete James Hardie 8.25" Select Smooth Fiber Cement Siding Installation · Four-Window NT Window Replacement with Full Exterior Repaint

Siding

This home in the Milwood neighborhood got a full siding refresh with James Hardie 8.25" Select Smooth fiber cement. We added 10" and 12" Hardie trim, then painted the siding, fascia, soffit, and gutters in Sherwin Williams Super Paint. Fiber cement was the smart pick here because it resists warping and pests through brutal Central Texas heat. For durable siding in Austin, TX, this material shrugs off hail and cedar season with ease.

James HardieJames Hardie 8.25" Select SmoothFiber Cement Siding$10k–$15k
Learn more about our siding →

Windows

Four aging windows were swapped for NT Windows Executive vinyl replacements at this Milwood property. The order went in during May and the windows shipped in June, so we could install them well before the siding phase. Vinyl was chosen for its tight seal and low upkeep in Austin's punishing summers. For energy-smart replacement windows in Austin, TX, this locally built NT product is a proven fit.

NT WindowsExecutiveVinyl Replacement Windows$2k–$5k
Learn more about our windows →

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

April 29, 2024

The homeowner reached out to Austin Pro on April 29, 2024, through a family and friend referral passed along by our office staff. Early conversations focused on tired wood siding and aging windows on this Milwood home.

Evaluation

May 2, 2024

By May 2, 2024, the project had moved into the prospect stage. We inspected the exterior and found weathered wood cladding, worn fascia and soffit, and four windows worth replacing before any siding work began.

Planning & approval

May 3, 2024

The project was approved on May 3, 2024. We locked in James Hardie 8.25" Select Smooth siding with matching 10" and 12" trim, ordered the four NT Window units in May, and scheduled material delivery through ABC Supply Co.

Installation

The windows arrived in June and went in over a single day. Siding installation followed in July, with James Hardie panels and trim going up before our painters coated everything in Sherwin Williams Super Paint.

Completion

August 30, 2024

We returned late in July for punch-out and two rounds of yard cleanup to catch every detail. The job was invoiced and completed on August 30, 2024, and formally closed on September 19, 2024.

4 Photos

Project Photos

Every photo is this job, shot on site by our crew in Milwood, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why did this Milwood home need new siding?

Milwood is full of homes built in the '80s and '90s, and the original wood siding on this one had run its course. Sun and heat had done real damage over the years.

  • Older cladding was breaking down after decades of 100-degree summers
  • Wood trim showed the kind of wear that invites rot and pests
  • The homeowner wanted a low-upkeep exterior that would hold up long-term

What did we find during the inspection?

When we looked over the exterior, the story was pretty clear. The wood siding had soaked up years of Texas weather, and the fascia and soffit needed attention too. We flagged the windows early, since replacing them first made the most sense for a clean install sequence. Doing windows before siding lets us tie the new cladding right into fresh window flanges, which is where a lot of homeowners get leaks wrong. A sloppy order of operations leaves gaps that show up as drafts and water intrusion two summers later.

What materials did we use, and why?

We chose James Hardie 8.25" Select Smooth fiber cement for the main body. Fiber cement is the right call for Central Texas because it won't warp, swell, or crack the way wood does in our brutal heat. It also stands up to hail far better than most alternatives, and cedar pollen wipes off a smooth finish with ease.

  • 8.25" Prime Smooth panels for the primary siding sections
  • James Hardie trim in both 10" and 12" per LF widths for corners and detail
  • Primed Select Smooth stock, ready for paint on install
  • ABC Supply Co. handled material delivery to the site

How did the window replacement go?

We ordered the four windows through NT Window in May, and they arrived in June. Installation took a single day once they were on site. Swapping them before the siding meant we could seal each opening properly and integrate it with the new Hardie panels.

  • Four full-frame replacement units from NT Window
  • One-day install, completed in June 2024
  • Openings sealed and prepped for the siding tie-in

What did the finish work involve?

Once the siding was up in July, our painters took over. Sherwin Williams Super Paint went on the siding, fascia, soffit, and even the gutters and downspouts for a fully unified look. Painting fiber cement after install locks in the color and adds another layer of protection against UV and moisture. We came back later in the month for punch-out to catch every last detail.

What were the results?

The home went from tired and weathered to sharp and sealed. New windows tightened the envelope, and the Hardie shell gives the homeowner decades of low-maintenance protection. Everything closed out clean on September 19, 2024.

  • A uniform, painted exterior from siding to gutters
  • A tighter building envelope after the window swap
  • A finish built for Austin's heat, hail, and pollen

Straight Answers

Questions About This Project

Why is fiber cement a good fit for Austin weather?

It holds its shape through 100-degree summers and resists the cracking that hail causes on lesser materials. It also won't feed the rot and insect problems that plague aging wood siding around Milwood.

How long did the whole project take?

The windows arrived and went in during June, then siding and paint happened across July. We finished punch items late that month and closed the job on September 19, 2024.

What did this project cost?

This retail job landed in the $20k–$25k range. That covered four windows, full James Hardie re-siding, trim, and complete exterior paint.

Do you paint the siding, or does it come pre-finished?

We installed primed Select Smooth panels and painted them on site with Sherwin Williams Super Paint. Painting after install gives a seamless color across siding, trim, and gutters, and adds real UV protection.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5