Located in the Queenswood neighborhood, this home required complete siding replacement due to typical Austin weather damage from intense UV exposure and storm impacts. We selected James Hardie HardiePlank Smooth 8.25" fiber cement siding for its proven performance in Texas heat and resistance to cedar pollen staining. The project included double-layer tear-off of existing materials, wrapping decorative front gable beams, garage door jamb protection, and professional-grade Sherwin Williams Super Paint application. This comprehensive siding solution now provides decades of low-maintenance protection against Austin's challenging climate.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner reached out through our community webpage on February 3rd, 2026, expressing concerns about their existing siding's condition after years of Austin weather exposure. During our initial conversation, they described visible deterioration and wanted a long-term solution that could handle Central Texas conditions. We scheduled an assessment to evaluate the full scope of work needed.

Evaluation

Our assessment revealed the need for complete double-layer tear-off rather than simple overlay work. We identified the decorative front gable beams, garage door jambs, and integrated gutter system as key areas requiring special attention. The evaluation confirmed James Hardie fiber cement as the optimal material choice for their specific exposure conditions and architectural style.

PLanning & Approval

We presented a comprehensive proposal covering the complete siding replacement, beam wrapping, and paint system on February 4th. The homeowner appreciated the detailed scope addressing both immediate needs and long-term performance. Final approval came on February 23rd after reviewing material selections and timeline expectations.

Installation

Installation began February 3rd with the careful double-layer tear-off and disposal of existing materials. Our crew methodically installed the HardiePlank system, wrapped all architectural elements, and applied the Sherwin Williams paint system throughout March and early April. Weather considerations and attention to detail kept the project moving steadily toward completion.

Completion

The final walkthrough on April 6th revealed a completely transformed exterior that exceeded expectations. Our two-phase punch process ensured every detail met our standards, from clean job site conditions to perfect paint coverage. The project was invoiced April 14th with full warranty documentation and maintenance guidelines provided.

Siding in Austin | Austin Pro

Queenswood Neighborhood Fiber Cement Upgrade

This Queenswood homeowner contacted us through our community webpage after noticing their original siding showing significant wear from Austin's relentless sun and storm damage. Years of 100°+ summers had taken their toll, and they needed a long-term solution that could handle whatever Central Texas weather throws at it.

During our initial assessment, we found the existing siding required complete removal – not just a simple overlay. The double-layer construction meant extra work, but it also presented an opportunity to properly insulate and protect the home's structure. The front gable's decorative beams needed special attention to maintain the home's architectural character while ensuring weather protection.

Material Selection for Austin Conditions

For this project, we recommended James Hardie HardiePlank Smooth 8.25" fiber cement siding. This isn't just about aesthetics – it's about performance in our specific climate. Fiber cement stands up to Austin's temperature swings, resists cedar pollen staining that plagues other materials, and won't warp or crack like wood siding often does here.

The smooth profile gives a clean, contemporary look while the 8.25" plank width provides excellent coverage and visual appeal. We paired this with Sherwin Williams Super Paint, chosen specifically for its fade resistance and ability to handle our intense UV exposure.

Comprehensive Installation Process

Our crew began with the double-layer tear-off, carefully removing both the existing siding layers and disposing of the old gutters that were integrated with the previous system. This level of removal allowed us to inspect the underlying structure and make any necessary repairs before installation.

The HardiePlank installation required precise attention to detail. We wrapped the front gable's decorative beams to maintain their architectural prominence while providing weather protection. The garage door jambs received double wrapping treatment – a critical detail that prevents water infiltration around these vulnerable areas.

Post and porch column wrapping ensured every exposed wood element received proper protection. The fascia and soffit work included both material replacement and paint application, creating a cohesive look across all exterior elements.

Paint Application Excellence

The Sherwin Williams Super Paint application went beyond just the new siding. Our team painted the fascia, soffit, and open soffit areas to create a unified appearance. This comprehensive approach means the entire exterior presents as one cohesive, professionally finished project rather than a patchwork of old and new materials.

The paint system we used provides exceptional durability against Austin's weather extremes. It resists the chalking and fading that standard paints suffer under our intense sun, maintaining its appearance for years longer than typical exterior coatings.

Project Timeline and Execution

From initial contact in early February through project completion in April, this transformation took shape over approximately ten weeks. The extended timeline allowed for proper material sourcing, weather considerations, and the meticulous attention to detail this comprehensive renovation required.

Our procurement included partnerships with local suppliers like McCoys and Gtown Lumber and Supply, ensuring materials arrived on schedule and met our quality standards. The punch-out phase included two separate yard cleanings and addressing any final detail items – a process that ensures every aspect meets our standards before we consider the job complete.

Long-Term Value for Austin Homeowners

This Queenswood project demonstrates how the right materials and installation approach create lasting value. James Hardie fiber cement siding carries a substantial warranty and requires minimal maintenance compared to traditional wood siding. The homeowner now has decades of protection against Austin's hail, heat, and humidity without the constant upkeep wood siding demands.

The comprehensive approach – from structural tear-off through final paint application – ensures every component works together as a complete weather protection system. This isn't just about curb appeal; it's about protecting one of your largest investments against Central Texas weather patterns that can be particularly hard on exterior materials.

For Austin homeowners considering siding replacement, this project shows how proper material selection and professional installation create results that perform year after year. The combination of James Hardie's engineered durability and professional-grade paint systems provides the kind of long-term performance our climate demands.