James Hardie Siding in Circle C North, Austin — completed project by Austin Pro

Completed July 2026

Siding & Gutters in Circle C North, Austin, TX

We completed siding and gutters on an Austin, TX home over four on-site days. New fiber cement siding, painted trim, and seamless aluminum gutters gave the exterior a finished, coordinated look.

Trades
Siding, Gutters
Location
Circle C North, Austin, TX
Completed
Project value
$20k–$25k
Brands installed
James Hardie

Standout outcome — The siding scope included a repair at the patio's back-left corner, not just new boards on the wall.

Timeframe — July 25–28, 2026; four days of on-site work.

Vendor and product — James Hardie 8.25-inch Primed Select Cedar Mill siding; custom Senox 6-inch seamless gutters.

Job APS-4868

Drag to Compare

Before & After

After: James Hardie siding completed in Circle C North, Austin
Before the siding project — home exterior in Circle C North, Austin
Before
After

Scope of Work

What We Did

James Hardie 8.25-Inch Cedar Mill Fiber Cement Siding · Custom 6-Inch Seamless Aluminum Gutters and Exterior Trim Work

Siding

This Siding in Austin, TX project used James Hardie fiber cement in the 8.25-inch Primed Select Cedar Mill profile. Brick-pocket trim and garage-door jamb wraps addressed transitions beyond the siding panels. Fiber cement was a practical choice for an exterior exposed to Austin’s intense summer heat. Sherwin Williams SuperPaint completed the primed siding.

James Hardie8.25" Primed Select Cedar MillFiber Cement Siding$10k–$15k
Learn more about our siding →

Gutters

This Gutters in Austin, TX project included custom-specified Senox 6-inch seamless aluminum gutters. The six-inch size provides a wider channel for roof runoff during heavy rain. Seamless aluminum also limits joints along each gutter run. The gutters completed the home’s siding and exterior-paint scope.

CustomSenox 6" Seamless Aluminum GuttersSeamless Aluminum Gutters$2k–$5k
Learn more about our gutters →

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

May 15, 2026

The homeowner reached Austin Pro through the website on May 15, 2026. The project moved to the prospect stage on May 16. The initial request developed into a siding and gutter scope for the Austin home.

Evaluation

The evaluation covered the siding section and the adjoining exterior details listed in the scope. Those included brick-pocket trim, garage door jamb wraps, and a birdsmouth repair at the patio's back-left corner. The record does not give a separate inspection date or document hidden wall damage.

Planning & approval

June 19, 2026

The plan specified James Hardie Primed Select Cedar Mill fiber cement siding and custom 6-inch seamless aluminum gutters. It also included Sherwin Williams Super Paint and front-entry door installation using homeowner-supplied materials. The project reached the approved milestone on June 19, 2026.

Installation

July 28, 2026

The crew worked on site from July 25 through July 28, 2026. The scope covered siding, brick-pocket trim, patio-corner repair, garage door jamb wraps, gutters, and listed paint work. The front-entry door line called for installation only, with no interior painting.

Completion

July 28, 2026

On-site work finished July 28, 2026. The project scope included punch-out items and two yard cleans as part of the finishing work. The record does not document a separate warranty visit or follow-up repair.

5 Photos

Project Photos

Every photo is this job, shot on site by our crew in Circle C North, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

What did this Austin exterior project need to cover?

The website inquiry arrived May 15, 2026. By May 16, the project had moved to the prospect stage. The eventual scope went beyond a siding section: it also listed brick-pocket trim, paint, gutters, and work around the front entry and garage openings. Those details matter because siding changes the edges of a house, not only its broad wall surfaces.

The worksheet identified a birdsmouth repair at the back-left corner of the patio. That gave us a specific repair point to address within the exterior scope. It did not establish that every wall had hidden damage, so we would not describe this as a whole-house structural repair. For an Austin homeowner reviewing a siding proposal, that distinction helps separate documented work from assumptions about what crews might find behind a wall.

Why use this fiber cement siding here?

We selected 8.25-inch Primed Select Cedar Mill fiber cement siding for the recorded siding section. The primed boards gave the paint crew a defined finish surface, while the Cedar Mill texture set the look of the new work. Fiber cement was a practical choice for an Austin exterior exposed to long stretches of 100°+ summer heat.

Board selection was only part of the decision. The scope also called for 1-by-4 brick-pocket trim where the siding work met that detail. A homeowner comparing bids could miss that line item and focus only on the board price. Here, the trim was part of the planned installation, so the edge treatment had its own material and labor allowance. That is a more useful picture of the job than a siding product name alone.

How did the four-day installation come together?

On-site work ran from July 25 through July 28, 2026. During that window, the crew handled the siding section and its related trim, repair, and finish tasks. The record does not assign each task to a particular day, so the four-day window is the most accurate way to describe the installation.

  • The scope included a wrap for a split-double garage door jamb, noted as two singles.
  • A separate garage door jamb wrap appeared on the worksheet.
  • Front-entry door installation was included, with materials to be supplied by the homeowner before siding installation.
  • That entry-door line covered installation only; it did not include interior painting.

Those opening details can affect how finished siding reads from the curb. A wall may have clean new boards, yet still look incomplete if the nearby jambs remain outside the scope. This project accounted for those transitions without treating them as part of the gutter work.

What exterior painting was included?

The paint scope reached farther than the new siding. It included fascia and soffit up to 24 inches, garage doors, the front door, and the porch ceiling. That breadth let the crew address the surfaces listed beside the siding work rather than leave each one for a separate exterior visit.

  • The siding paint line specified Sherwin Williams Super Paint.
  • The worksheet listed door paint separately from garage door paint.
  • Porch-ceiling paint had its own line item.
  • The fascia and soffit line set a 24-inch limit.

Those limits are worth reading closely. A paint allowance for fascia and soffit up to 24 inches does not mean every painted surface on the home was included. On this Austin job, the written lines show which surfaces belonged to the exterior finish scope and which claim would go beyond it.

How did the gutter work fit the siding project?

The gutter portion specified custom Senox 6-inch seamless aluminum gutters. We treated it as a separate service within the same exterior project, not as a siding accessory. The six-inch size gives runoff a wider channel during Austin's heavy rain, while the seamless construction keeps joints along a run to a minimum.

  • The gutters were recorded under a custom vendor designation rather than the James Hardie siding line.
  • Aluminum was the specified gutter material; fiber cement was reserved for the siding.
  • The approved project scope included both trades before installation began.

Keeping those lines distinct helps you compare exterior proposals. A siding quote does not automatically include new gutters, even when both meet at the roof edge. This homeowner's project included each service explicitly, so the completed work covered both the wall finish and its listed gutter scope.

What was complete when the crew left?

July 28, 2026, is the recorded last day of on-site work. The scope included punch-out items and two yard cleans, which are easy to overlook beside siding and paint. They still matter: the final stage of an exterior job includes dealing with work-area details, not just installing the main material.

The project record later shows invoicing and closure on September 14. Those are administrative milestones, not extra installation days. The on-site timeframe remains July 25–28, and the record provides no separate dated warranty visit or later repair to report.

Straight Answers

Questions About This Project

How long was the crew on site?

The installation window was four days, from July 25 to July 28, 2026. The May inquiry and June approval were earlier project milestones, not days spent installing siding.

Was the front entry door part of the siding price?

Front-entry door installation appeared in the project scope, but the homeowner was responsible for supplying its materials before siding work. The listed installation did not cover interior door painting.

What was the project's budget range?

The recorded range for the overall retail project was $20,000–$25,000. That range covers the project as recorded; it is not a stand-alone quote for siding or gutters on another home.

Does this record list a warranty or follow-up visit?

No warranty terms or dated follow-up visit appear in the provided project data. The documented completion milestone is July 28, 2026; homeowners should check their own project paperwork for coverage details.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5