Siding in Montopolis, Austin, TX — completed Austin Pro project

Completed July 2024

Siding & Windows in Montopolis, Austin, TX

We re-clad a 1980s-era home in Montopolis with James Hardie board and batten siding and a full set of new windows. The finished exterior is tighter, tougher, and built for Central Texas weather.

Trades
Siding, Windows
Location
Montopolis, Austin, TX
Completed
Project value
$25k–$30k
Brands installed
James Hardie, NT Windows

Standout outcome — A full exterior rebuild finished with Sherwin Williams Super Paint

Timeframe — Approved April 12, 2024; completed July 26, 2024

Vendor and product — James Hardie fiber cement, board and batten profile

Job APS-4086

Scope of Work

What We Did

James Hardie Board & Batten Fiber Cement Siding Installation · Full Window Replacement with Sherwin Williams Exterior Finish

Siding

This Austin siding project used James Hardie Board & Batten fiber cement, installed 16 inches on center. Fiber cement holds up well against Central Texas heat, hail, and cedar pollen. Our crew also wrapped the posts, beams, and fascia, then finished with Sherwin Williams Super Paint. The result is a durable, low-maintenance exterior built for the local climate.

James HardieBoard & BattenFiber Cement Siding$15k–$20k
Learn more about our siding →

Windows

This Montopolis job included NT Windows vinyl replacement windows, installed in one day. Vinyl frames resist warping and help cut cooling costs during long Austin summers. We ordered the units in early May and set them soon after delivery in June. The tight install kept the home comfortable and sealed against Central Texas heat.

NT WindowsNT Windows Vinyl Replacement WindowsVinyl Replacement Windows$5k–$10k
Learn more about our windows →

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

March 28, 2024

The homeowner found Austin Pro through an internet search and reached out on March 28, 2024. They were looking to replace aging siding and windows on their Montopolis home. We set up an initial visit to walk the property.

Evaluation

April 3, 2024

By April 3, 2024 the project moved into the prospect stage. We inspected the existing cladding, checked the window openings, and confirmed the home was a strong candidate for fiber cement. The old surfaces showed the wear you expect from years of Austin sun and hail.

Planning & approval

April 12, 2024

The homeowner approved the job on April 12, 2024. We finalized the James Hardie board and batten selection, the 16-inch on-center layout, and the Sherwin Williams paint. Windows were ordered on May 1st to get them into the production queue early.

Installation

Windows arrived in early June and the crew set the full run in a single day. Siding began in mid-June and ran several days, with ABC Supply handling material delivery. Paint phases followed once the boards, battens, beams, and columns were wrapped.

Completion

July 26, 2024

We completed the project on July 26, 2024, closing out with two rounds of yard cleanup and punch items. A final walkthrough confirmed the sealed windows, wrapped trim, and painted fascia and soffit.

4 Photos

Project Photos

Every photo is this job, shot on site by our crew in Montopolis, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why did this Montopolis home need new siding?

The old cladding had taken years of abuse from Austin summers and spring hail. Fiber cement was the clear fix for a home in this ZIP code.

  • Board and batten gives a bold vertical line that suits older Montopolis homes
  • Fiber cement won't swell or rot the way wood does in humid stretches
  • The 16-inch on-center spacing keeps the batten pattern even and clean

What did the crew do about the windows first?

We handled the windows before touching the siding, and that order matters. Doing it backward is a mistake we see often. When windows go in after new cladding, the flashing gets awkward and the seals never sit right.

We ordered the windows on May 1st. They arrived in early June, and our team set the full run in a single day. That let us flash and seal each opening properly before the fiber cement went up around it. The result is a weather-tight envelope with no shortcuts hiding behind the boards.

What materials did we use, and why?

We chose James Hardie board and batten for its track record in heat and hail. Central Texas is hard on exteriors, and fiber cement handles it.

  • 3/8-inch Hardie trim wrapping the beams for a crisp edge
  • Wrapped porch columns to match the new siding lines
  • Specialty siding pieces for the trickier transitions
  • Fascia and soffit painted up to 24 inches

Here's the deeper reason fiber cement wins in this area. Our summers push past 100 degrees for weeks, and that heat cooks wood siding until it warps and splits. Fiber cement holds its shape through those swings. It also stands up to hail far better than vinyl, which cracks when a storm rolls through. On a limestone-heavy lot like this one, the material's stability pairs well with a home that has already settled over decades. That combination is why we specified Hardie here instead of a cheaper alternative.

How did the installation go?

The siding phase started in mid-June and ran several days. Paint followed once the boards and battens were set.

  • ABC Supply delivered the Hardie material to the site
  • We coated the siding in Sherwin Williams Super Paint
  • Two rounds of yard cleanup and punch items closed out the work
  • Final completion landed on July 26, 2024

What were the results?

The home now wears a clean, uniform board and batten exterior that reads far newer than its age. Cedar pollen season and summer sun won't chew through this finish the way they did the old one.

  • A sealed, flashed window set under fresh fiber cement
  • Painted fascia and soffit tying the roofline together
  • A single-source exterior that ages evenly

Straight Answers

Questions About This Project

How long did the whole project take?

The homeowner approved the job on April 12, 2024. Windows arrived in June and went in fast, siding ran through the summer, and we completed everything on July 26.

Why board and batten instead of horizontal siding?

Board and batten gives a strong vertical rhythm that fits the character of older Austin neighborhoods. The 16-inch spacing keeps the look balanced without feeling busy.

What did this project cost?

This retail job fell in the $25,000 to $30,000 range. That covered new windows, full James Hardie siding, trim and column wraps, and complete exterior paint.

Will the paint hold up in Austin heat?

Sherwin Williams Super Paint is built to resist fade and cracking through repeated 100-degree days. Paired with fiber cement, it protects the wall system for years before a refresh is needed.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5