Completed April 2025
Siding in Castlelake, Marble Falls, TX
Plus Windows, Exterior Painting, Doors on the same job
We replaced the full exterior on this Marble Falls home with James Hardie fiber cement siding and new NT Windows. The work was completed on April 17, 2025. The home traded worn, layered siding for a durable Hill Country exterior built to last.
- Trades
- Siding, Windows, Exterior Painting, Doors
- Location
- Castlelake, Marble Falls, TX
- Completed
- Brands installed
- James Hardie, NT Windows, Sherwin Williams, Pella
Standout outcome — A double-layer tear-off and a full re-clad
Timeframe — Approved December 16, 2024; installed April 17, 2025
Job APS-4351
Drag to Compare
Before & After


Scope of Work
What We Did
Complete James Hardie HardiePlank Custom Colonial Cedar Mill Siding Installation · Energy-Efficient NT Windows Vinyl Replacements with New Storm Door
Siding
This Marble Falls siding project replaced worn cladding with James Hardie HardiePlank in the Custom Colonial Cedar Mill texture. Fiber cement holds up to Central Texas heat and hail far better than older wood siding. We handled a full tear off, new fascia and soffit, and a Cedarmill porch ceiling. A coat of Sherwin Williams SuperPaint sealed the whole exterior for years of protection.
Learn more about our siding →Windows
This window replacement in Marble Falls used NT Windows, a Texas-built line made for our climate. New units seal tighter than aging frames, cutting heat gain during long summers. Better seals also keep out cedar pollen and dust. Installed alongside the new James Hardie siding, they gave the home a clean, energy-smart exterior.
Learn more about our windows →Exterior Painting
Doors
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
November 20, 2024The homeowner found Austin Pro through our Better Business Bureau listing and reached out on November 20, 2024. Early conversations focused on replacing tired siding and aging windows on their Castlelake home in Marble Falls.
Evaluation
December 3, 2024We completed an on-site review by December 3, 2024. We flagged the worn siding, dated fascia and soffit, and noted the porch ceiling would need rebuilding. The inspection also revealed a likely second layer of siding hidden beneath the surface.
Planning & approval
December 16, 2024The homeowner approved the scope on December 16, 2024. We finalized the James Hardie HardiePlank Custom Colonial Cedar Mill profile, the NT Windows replacement package, and a Sherwin Williams SuperPaint finish. Material orders were coordinated through ABC Supply, Lansing Building Products, and FG Lumber.
Installation
April 17, 2025The crew handled the full job: a complete double-layer tear-off, new Hardie siding, fascia, and soffit, a rebuilt porch ceiling, NT Windows replacements, and a new storm door. Two yard cleanups and a punch pass kept the site tidy through completion on April 17, 2025.
Completion
September 11, 2025The project wrapped in April, with the exterior painted and punch items closed out. A final walkthrough confirmed the siding, windows, and trim all tied together cleanly. The job was fully closed on September 11, 2025.
10 Photos
Project Photos
Every photo is this job, shot on site by our crew in Castlelake, Marble Falls, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Marble Falls home need new siding?
The old siding had reached the end of its life and was hiding a second layer underneath. Central Texas is hard on exteriors, and this home showed it. Years of 100-degree summers, spring hail, and swelling from limestone-heavy soil had taken a toll.
- Two full layers of old cladding had to come off
- Fascia and soffit were worn and due for replacement
- The porch ceiling needed a full rebuild
What did the crew find during tear-off?
The biggest surprise was the double layer of siding. Someone had installed newer siding right over the original instead of removing it first. That traps moisture and adds weight, and it hides rot that can spread unseen for years. We tore both layers down to the sheathing so we could inspect and start clean. This is where homeowners often get burned by cheaper bids, because a proper tear-off costs more up front but prevents far bigger repairs later.
- Complete double-layer tear-off down to the wall
- Two full yard cleanups plus a punch-item pass
- Materials staged through ABC Supply and Lansing Building Products
What materials did we use, and why?
We went with James Hardie fiber cement in the HardiePlank Custom Colonial Cedar Mill profile. Fiber cement holds up to hail and heat far better than wood or vinyl, and it won't warp or feed cedar pollen buildup the way soft materials can. The Cedar Mill texture gives the home a natural wood-grain look without the rot and repainting that real cedar demands in this climate. We finished it with Sherwin Williams SuperPaint, chosen for its color hold under harsh Hill Country sun.
- HardiePlank Custom Colonial Cedar Mill lap siding
- 8-inch Hardie fascia with 1x2 trim detail
- Hardie soffit installed with H-mold
- 4x8 select cedarmill porch ceiling, painted
How did the window replacement fit in?
We swapped the home's aging units for NT Windows vinyl replacements while the exterior was open. Doing both jobs together let us seal the window flashing cleanly against the new siding. That tighter seal matters a lot in older homes that leak air around every frame.
- NT Windows replacement units throughout
- New storm door installed at the entry
- Flashing tied into the fresh Hardie envelope
What were the results?
The home now has a clean, cohesive exterior that should shrug off the next round of hail and heat. The new siding, fascia, soffit, and porch ceiling all read as one finished package. The homeowner gets lower maintenance and a tighter, quieter interior.
- Install completed April 17, 2025
- Full paint on siding, plus fascia and soffit up to 24 inches
- Project closed out September 11, 2025
Straight Answers
Questions About This Project
Why does fiber cement make sense in Marble Falls?
It resists the hail, heat, and moisture swings that come with living over limestone soil. Unlike wood, it won't rot or attract pests, and it holds paint through brutal summers.
How long did the whole project take?
The on-site work was completed on April 17, 2025. The homeowner first contacted us in November 2024 and approved the project that December.
What did this project cost?
This project fell in the $40,000 to $50,000 range. That covered the double-layer tear-off, full re-clad, new windows, a storm door, and all paint work.
Was the paint included?
Yes. The siding was finished in Sherwin Williams SuperPaint, and fascia and soffit were painted up to 24 inches as part of the scope.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5