James Hardie Siding & Doors in Steeds Crossing, Pflugerville — completed project by Austin Pro

Completed June 2026

Siding & Doors in Steeds Crossing, Pflugerville, TX

We replaced siding and installed an exterior door at a Steeds Crossing home in Pflugerville, TX. The finished project pairs painted James Hardie fiber cement siding with a Provia door installed before the siding work.

Trades
Siding, Doors
Completed
Brands installed
James Hardie, Provia

Standout outcome — The door went in first, followed by siding replacement and paint.

Timeframe — June 20–23, 2026; four days of on-site work.

Vendors and products — James Hardie JH 8.25-inch Select Cedar Mill and Provia Heritage Series Energy Star DLA-UV.

Job APS-4801

Drag to Compare

Before & After

After: James Hardie siding & doors completed in Steeds Crossing, Pflugerville
Before the siding & doors project — home exterior in Steeds Crossing, Pflugerville
Before
After

Scope of Work

What We Did

James Hardie 8.25-Inch Select Cedar Mill Siding Replacement · Door-First Provia Heritage Series Installation

Siding

This Siding in Pflugerville, TX project included tear-off, new cladding, paint, and final cleanup. We used James Hardie 8.25-inch Select Cedar Mill fiber cement siding. Fiber cement was a practical choice for a home exposed to Central Texas heat. Sherwin Williams SuperPaint gave the primed boards their finished look.

James HardieJH 8.25" Select Cedar MillFiber Cement Siding$2k–$5k
Learn more about our siding →

Doors

This Doors in Pflugerville, TX project included a Provia Heritage Series Energy Star DLA-UV exterior door. We paired the door work with the home's new siding. Its specified energy rating made it a sensible choice for Pflugerville summers. The crew completed both exterior trades within the scheduled four-day installation.

ProviaHeritage Series Energy Star DLA-UVExterior Door$5k–$10k
Learn more about our doors →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

April 20, 2026

The homeowner found us through an online search and reached out on April 20, 2026. The conversation led to a plan to evaluate both siding and an exterior door at the Steeds Crossing home.

Evaluation

We inspected the home on April 21 and began the estimate. The siding scope included double-layer tear-off, replacement boards, and paint. We also assessed the door as part of the same project.

Planning & approval

The homeowner approved the siding and door project on April 28. The plan paired James Hardie Select Cedar Mill siding with a Provia Heritage Series door and included permits. We set the door installation ahead of the siding replacement.

Installation

June 23, 2026

The crew worked on site from June 20 through June 23, 2026. We installed the exterior door first, then removed and replaced the siding. The siding work also included painting with Sherwin Williams Super Paint.

Completion

The crew finished on June 23 after completing the door, siding, and paint work. Final punch items and two yard cleanups were included in the scope.

6 Photos

Project Photos

Every photo is this job, shot on site by our crew in Steeds Crossing, Pflugerville, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why replace the siding instead of painting over it?

The siding work at this Steeds Crossing home called for a double-layer tear-off. That is a different job from coating the surface you can already see. If we had treated it as paint alone, the layers scheduled for removal would have remained behind the new finish. We planned the removal and replacement as separate steps, then included paint for the new siding. It is a useful distinction for homeowners comparing a siding bid with a painting bid: the finished color may look similar, but the work beneath it is not.

The homeowner reached out after an online search on April 20, 2026. We inspected the home and began the estimate the next day, giving the homeowner a chance to review the siding and door work before approving it on April 28.

Which siding and door products did we use?

We selected 8.25-inch Select Cedar Mill fiber cement siding for the replacement areas. The product provides a defined board size and cedar-mill texture without making this a wood-siding installation. Central Texas summers can top 100°F, so the material choice matters as much as the paint color. The homeowner also needed an exterior door selected as part of the same project, not a separate job left for later.

The door was a Heritage Series Energy Star DLA-UV exterior door. We did not need to guess how new siding would meet an old door: our installation plan put the new door in place first. That sequence gave the siding crew the installed opening to work around. It also kept the work in one coordinated on-site window rather than asking the homeowner to schedule the two trades independently.

How did the four-day installation unfold?

Our crew began on June 20 and finished on June 23. The Provia door installation came first; siding removal and replacement followed. That order was part of the job plan, not a claim that both services were completed in one day.

  • The siding scope included both tear-off and double-layer tear-off work.
  • Delivery was included for the replacement siding materials.
  • The plan included permits and a permit fee.
  • The crew used the four-day window for the door, siding, paint, and final punch work.

How was the new siding finished?

The replacement boards were primed Select Cedar Mill siding, so painting was part of the siding job rather than a separate cosmetic suggestion. We used Sherwin Williams Super Paint for the siding finish. The paint step gave the installed fiber cement a completed exterior appearance before the crew wrapped up.

  • The specified board profile was 8.25 inches, which affects the look of each siding course.
  • The finish scope called for painting the siding, not just delivering primed boards.
  • This home’s plan paired siding replacement with exterior painting.
  • Paint materials were included in the project scope.

What should homeowners notice about the door-first sequence?

The order of work matters where two exterior trades meet. On this project, we did not replace the siding and then return to install the Heritage Series door. We installed the door first, then completed the surrounding siding work. A homeowner reviewing a similar project should ask which crew goes first; otherwise, the plan can sound clear until installation begins.

  • The door was the project’s secondary service, but it led the on-site sequence.
  • Siding was the primary service and included removal, replacement, and finishing.
  • Both services were completed during the June 20–23 visit.
  • The homeowner approved the combined project on April 28, well before installation began.

What marked the end of the work?

The crew finished on June 23 after the siding and door work. The scope also included punch items and two yard cleanups. Those details matter on a siding replacement: removed material, delivery packaging, and finish work all need attention before the crew leaves.

  • The completed exterior combines James Hardie siding with a Provia entry product.
  • Sherwin Williams Super Paint was the specified siding coating.
  • The on-site work lasted four days, from the first installation day through completion.
  • The project covered one Pflugerville home in Steeds Crossing, not a neighborhood-wide installation.

Straight Answers

Questions About This Project

How long passed between the first call and installation?

The homeowner contacted us on April 20 and approved the project on April 28. On-site work began June 20; the weeks before that date were not installation days.

What does double-layer tear-off mean for this siding project?

It means the siding scope allowed for removing two existing layers where that work was specified. That removal is part of preparing for the new fiber cement siding, not an extra coat of paint.

What was the project’s price range?

The combined siding and door project fell in the $10,000–$15,000 range. That range covers this project’s scope; another home may need a different amount of removal, material, or finish work.

Why choose fiber cement for a Pflugerville exterior?

James Hardie fiber cement gave this homeowner a specified 8.25-inch siding profile for a home exposed to Central Texas weather. Product choice still needs to be paired with the right removal, installation, and paint plan, as it was here.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5