Schedule Appointment
GAF
NT Windows

Recent Project: Austin | Shingle Roofing & Windows | 05-26-26 | APS-4780

Full GAF Timberline UHDZ Roofing System Replacement | Eleven-Unit NT Windows Replacement

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Shingle Roofing

GAF

This 78748 project centered on a full roof replacement using the GAF Timberline UHDZ system. We stripped the aging comp shingles, hauled them off, and rebuilt the deck with 7/16-inch OSB where needed. The system pairs GAF FeltBuster underlayment, StormGuard ice and water shield, and Z-Ridge caps for real hail and heat protection. Timberline UHDZ suits Austin roofs because its thick profile holds up under relentless summer sun and sudden storms.

Learn More About Our Siding

Windows

NT Windows

The home also received 11 new NT Windows units to seal up a dated envelope. We ordered the windows in mid-April and set them over multiple on-site days once they came in. NT Window builds locally for Texas heat, so the frames resist warping through 100-degree stretches. The new glass cuts solar gain and helps the home hold cooler air.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner found Austin Pro through an internet search and reached out in early March 2026. The lead came in on March 6, starting a conversation about both a tired roof and aging windows on this 78748 home.

Evaluation

By March 9 the project moved to the prospect stage after our on-site look. We inspected the worn comp shingles, checked the decking condition, and reviewed the 11 windows the homeowner wanted replaced.

PLanning & Approval

The homeowner approved the project on April 4, 2026. We finalized the GAF Timberline UHDZ roofing system and the NT Window selections, then placed the window order on April 13 to get the multi-week build started.

Installation

While waiting on the windows, we completed the full roof over multiple days in late April, including tear-off, new OSB decking, underlayment, and the GAF system. The 11 NT Windows arrived in mid-May and were installed over several on-site days, running May 25 into May 26.

Completion

On-site work finished May 26, 2026, with the invoice issued the same day. The home left with a complete GAF system roof, new ventilation and flashing, and 11 new windows, all backed by manufacturer warranty coverage.

Shingle Roofing in Austin | Austin Pro

We replaced the full roof and 11 windows on this South Austin home in the 78748 ZIP, swapping worn comp shingles for a GAF Timberline UHDZ system and dated glass for new NT Windows units. The home came out tighter, tougher, and ready for another Central Texas summer.

Project at a glance

  • Services: Shingle roofing and window replacement
  • Location: Austin, TX — 78748 (Shady Hollow area)
  • Vendor & product: GAF Timberline UHDZ roofing system; NT Window units
  • Material: UHDZ architectural shingles with UltraMat; new vinyl windows
  • Timeframe: Roof done in late April; 11 windows installed over multiple days, finishing May 26, 2026
  • Standout outcome: A full exterior envelope upgrade tackled in two phases around a window order

Why did this Austin home need a new roof?

The existing comp shingles had run their course. Roofs in this part of Austin take a beating from hail, hard sun, and the swing between spring storms and dry 100-degree summers.

We planned a complete tear-off rather than a layover so we could inspect the deck underneath. That choice matters more than most homeowners realize.

  • Removed and hauled off all old comp shingles
  • Inspected and replaced decking with 7/16" x 4' x 8' OSB where needed
  • Reset the base before any new material went down

What roofing materials did we use, and why?

We built the roof around the GAF Timberline UHDZ system, which uses a thicker mat than standard architectural shingles. That extra body helps it resist the cracking and granule loss that Austin heat and hail cause over time. The UltraMat construction gives it a stronger nail hold, so the roof stays put in high wind. We paired it with GAF FeltBuster synthetic underlayment for a dry, breathable layer, then added StormGuard ice and water shield in the vulnerable spots. Every piece works together as one warrantied system instead of a mix of random parts.

  • GAF ProStart starter strip along the eaves (120')
  • GAF Z-Ridge ridge caps (33')
  • FeltBuster synthetic underlayment (10 sq)
  • StormGuard ice and water shield (2 sq)
  • Electro-galvanized 1 1/4" coil nails for corrosion resistance

How did we handle ventilation and flashing?

A roof only lasts if the attic can breathe and the penetrations stay sealed. We updated the vents and flashing so heat and moisture have a clear path out.

Proper ventilation keeps attic temps down during those long triple-digit stretches, which protects both the shingles and the ceiling below.

  • Master Flow high-capacity dome vent (HCD144)
  • New galvanized steel pipe flashing, 1 1/4"–3"
  • Adjustable 6" pipe jack for larger penetrations
  • Bath exhaust vent and a Type B gas vent cap
  • A-style 2"x2" galvanized drip edge around the perimeter

Why replace the windows, and how did the timing work?

The home's old windows were leaking conditioned air and letting in too much summer heat. We ordered 11 new NT Windows units on April 13, since custom sizes take weeks to build. Rather than let the house wait, we ran the roof job during the gap. The windows arrived in mid-May, and we set them over multiple days, wrapping the whole project on May 26. NT Window builds its frames in Texas for Texas weather, so they hold their shape through the heat and seal tight against cedar pollen and dust.

  • 11 total window units replaced
  • Ordered April 13, received mid-May
  • Installed across several on-site days
  • Locally built frames suited to Central Texas swings

What were the results?

The home now has a fresh GAF system roof and a full set of new windows working together. Heat gain drops, the envelope seals up, and the roof is built to shrug off the next hail season.

  • A single-source GAF roofing system with matching warranty coverage
  • Tighter windows that ease the load on the AC
  • Two major exterior upgrades handled in one project window

Frequently asked questions

How long did the whole project take?

The roof went on over several days in late April while the windows were still being built. The 11 windows arrived in mid-May and were installed over multiple days, finishing on-site May 26, 2026.

Why choose Timberline UHDZ for an Austin roof?

Its thicker mat and stronger nail zone stand up better to hail and high wind. The heavier profile also resists the granule loss that hot Texas sun speeds along on thinner shingles.

What did this project cost?

This combined roofing and window job fell in the $25,000–$30,000 range. Final pricing depends on roof size, decking repairs, and the number and style of windows.

Do you back the work with a warranty?

Yes. Building a full GAF system with matched underlayment, starter, and ridge components qualifies the roof for stronger manufacturer warranty coverage than mixing brands would allow.

GAF shingle roofGAF Master Elite Certificate
No items found.