Completed August 2026
Siding in Tanglewood Forest, Austin, TX
Plus Windows, Shingle Roofing, Exterior Painting, Gutters on the same job
We installed new siding and completed exterior painting for an Austin, TX, home, alongside window, roof, and gutter work. The result was a coordinated exterior update finished on site August 12, 2026.
- Trades
- Siding, Windows, Shingle Roofing, Exterior Painting, Gutters
- Location
- Tanglewood Forest, Austin, TX
- Completed
- Project value
- $60k–$75k
- Brands installed
- James Hardie, Pella, GAF, Sherwin Williams
Standout outcome — Five exterior trades formed one completed project rather than five separate jobs.
Timeframe — August 9–12, 2026, for the recorded on-site installation window.
Neighborhood and city — Austin, TX 78748; the project record does not identify a subdivision.
Vendor and product — James Hardie 8.25-inch Select Cedar Mill siding and Sherwin Williams SuperPaint.
Job APS-4812
Drag to Compare
Before & After


Scope of Work
What We Did
James Hardie 8.25-Inch Select Cedar Mill Fiber Cement Siding · Sherwin Williams SuperPaint Exterior Painting Across a Five-Trade Project
Siding
This Siding in Austin, TX project included James Hardie fiber cement boards in an 8.25-inch Select Cedar Mill profile. Their wood-grain look suited the home's exterior without calling for wood siding. Fiber cement is a practical choice for a house exposed to Austin's long, hot summers. The completed work gave the siding a consistent profile across the project.
Learn more about our siding →Windows
Windows in Austin were included in this five-service project. The selected units were Pella vinyl replacement windows. Vinyl was the specified frame material; the record does not list window sizes or performance ratings. Their replacement was coordinated with the surrounding exterior work.
Learn more about our windows →Shingle Roofing
Shingle Roofing in Austin was one part of this exterior project. The scope included removing and disposing of the existing composition shingles. GAF Timberline HDZ asphalt shingles were the selected roof covering. The worksheet also listed underlayment, starter strip, ridge shingles, and ventilation components.
Learn more about our shingle roofing →Exterior Painting
Exterior Painting in Austin, TX was part of this home's larger exterior project. The paint selection was Sherwin Williams SuperPaint. We coordinated the painted areas with the new siding so the trades produced a unified finish. Painting formed one part of a four-day on-site installation window.
Learn more about our exterior painting →Gutters
Gutters in Austin were included in the combined exterior scope. The specified runs were 5-inch seamless aluminum. Plans listed 3-by-4-inch downspouts for single-story and two-story locations, plus standard screens. The record associates GAF with this service but does not identify a GAF gutter product.
Learn more about our gutters →Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
February 11, 2025The homeowner reached Austin Pro through the website, with the lead recorded on February 11, 2025. The project moved to prospect status on February 15. Those dates mark the early conversation, not the start of installation.
Evaluation
The evaluation covered a proposed five-trade exterior scope, including siding, painting, windows, roofing, and gutters. The worksheet flagged steep-slope, two-story roof access and listed both front and back gutter work. It does not date the site assessment or describe the old siding's condition, so those details remain unconfirmed.
Planning & approval
May 3, 2026The project reached approved status on May 3, 2026. Selections in the record included James Hardie Select Cedar Mill siding, Sherwin Williams SuperPaint, Pella vinyl replacement windows, and GAF Timberline HDZ shingles. The supplied details do not identify a permit milestone.
Installation
August 12, 2026The recorded on-site installation window ran from August 9 through August 12, 2026. Crews handled a multi-trade exterior scope that included siding, painting, replacement windows, roof work, and seamless aluminum gutters. The roof worksheet also called for removing and disposing of the old composition shingles.
Completion
August 12, 2026August 12, 2026, is the recorded last day of on-site work. The completed scope brought five exterior services into one project, and invoicing followed on August 13. No walkthrough finding, warranty term, or follow-up visit is documented in the supplied record.
10 Photos
Project Photos
Every photo is this job, shot on site by our crew in Tanglewood Forest, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why was siding part of this Austin exterior project?
The homeowner's approved scope went beyond a single surface: it paired James Hardie siding with painting, replacement windows, a shingle roof, and gutters. That matters on a multi-trade job. You need to know which work touches another trade before crews arrive, especially where siding meets a window opening or a roof edge. We treated the exterior as a connected project, not a list of unrelated products.
Austin's 100°+ summer days also affect how a homeowner thinks about exterior materials. The siding selection was 8.25-inch Select Cedar Mill fiber cement, a defined product rather than a generic request for “new siding.” The records do not say what condition the old siding was in, so I would not claim that heat caused its replacement. What we can say is that the homeowner chose a specific material within a broader exterior plan.
- The siding was the primary service in the project record.
- Exterior painting was listed as the secondary service.
- The job was retail work, not an insurance-claim repair.
What did the roof scope tell us before crews started?
The worksheet flagged steep-slope, two-story roof access. That is a real planning detail: moving a roofing crew and materials safely around a taller section takes more thought than a simple, low-slope layout. The scope also included 7/16-inch OSB in its sheathing and decking section. I would not read that line as proof that the entire roof deck was damaged; it tells us what material was included in the plan.
The shingle work called for removing and disposing of the existing composition shingles. It also specified starter strips, synthetic underlayment, ice-and-water shield, flashing, and a ridge-vent component. Those parts matter because a roof is more than the visible shingle. After Austin hail, it is easy to focus only on the surface you can see from the yard. This worksheet documented the less visible roof components too, without claiming that hail caused this particular job.
- The specified shingles were GAF Timberline HDZ.
- The roof scope listed ProStart starter strip and Z-Ridge.
- Cobra Rigid Vent 3 appeared among the roof ventilation items.
- The access line specifically identified a two-story section.
Why pair fiber cement siding with SuperPaint?
The siding and paint had different jobs. James Hardie's Select Cedar Mill was the specified fiber cement siding, while Sherwin Williams SuperPaint was the specified exterior coating. Choosing both within one project let us coordinate the siding and painting trades during the recorded August work window. It does not mean every piece of siding received paint; the record does not map the painted surfaces that closely.
Fiber cement was a reasonable material choice for an Austin exterior exposed to sustained summer heat. The 8.25-inch Select Cedar Mill specification also gave the crew a clear siding profile to work from. A homeowner comparing bids can miss that distinction: “fiber cement siding” describes the material, but the listed product and width tell you more about what the job includes. We kept those details tied to the approved scope rather than guessing at a color or finish that was not recorded.
- SuperPaint was the named exterior-paint product, not a paint color.
- The siding material was recorded separately from the coating.
- No paint sheen or color selection appears in the supplied project details.
How did five exterior trades fit into the installation window?
The recorded on-site window ran four days, from August 9 through August 12, 2026. That does not make every trade a one-day job. The project notes describe a large, multi-trade effort with work and coordination extending over a month, while the dated install field identifies this final on-site window. We should keep those two measures separate.
The other trades had defined materials and tasks. Pella vinyl replacement windows were part of the job, and the roof worksheet called for shingle removal with haul-off. Gutter details covered both the front and back, with downspouts specified for single-story and two-story locations. Those details gave us more to coordinate than a siding-only installation.
- The gutter specification called for 5-inch seamless aluminum runs.
- Downspouts were listed at 3 by 4 inches.
- Standard gutter screens appeared in the scope.
- Pipe-flashing and gas-vent-cap items were included in the roof worksheet.
What can homeowners take from the completed job?
The authoritative completion date is August 12, 2026: that is the last recorded day of on-site work. By then, the project record covered siding, exterior painting, windows, shingle roofing, and gutters as one finished exterior job. The record does not provide a paint color, a window count, or a documented walkthrough result, so I would not add those details after the fact.
There is a useful lesson here for anyone reviewing an exterior estimate in Austin. Ask whether it identifies the visible materials and the supporting components. This job named the siding profile and paint product, but it also recorded roof underlayment, flashing, and downspout sizes. Those specifics make it easier to understand what was approved and what should be checked against the finished work.
- The lead came through the website on February 11, 2025.
- The project reached approved status on May 3, 2026.
- The completion milestone preceded invoicing on August 13, 2026.
Straight Answers
Questions About This Project
Did this whole exterior project take only four days?
No. August 9–12 is the recorded on-site install window, not the full sales and planning cycle. The project notes also describe multi-trade work and coordination over a longer period; they do not give separate installation dates for each trade.
Why does the siding specification matter in Austin?
The record identifies both the fiber cement material and the 8.25-inch Select Cedar Mill product. That gives you a more useful basis for reviewing the siding scope than a broad material label alone, especially on a home exposed to Central Texas heat.
What was the project's price range?
The recorded value band for all five services was $60k–$75k. It covers the combined exterior project, not just the siding or painting.
Is a warranty or follow-up visit documented?
No warranty term or follow-up visit is included in the supplied record. The job later reached closed status on September 28, 2026; homeowners should check their written project documents for any applicable warranty terms.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address