Completed November 2025
Siding & Exterior Painting in Windsor Park, Austin, TX (November 2025)
We replaced every board of siding on this Austin home in the 78723 area, tearing off two failing layers and installing James Hardie fiber cement finished in Sherwin Williams paint. The house went from soft, rot-prone walls to a hard, weather-tight shell.
- Trades
- Siding, Exterior Painting
- Location
- Windsor Park, Austin, TX
- Completed
- Brands installed
- James Hardie, Sherwin Williams
Standout outcome — A double-layer tear-off and fresh sheathing gave the walls a clean, solid base
Timeframe — Approved Aug 5, 2025; completed Nov 12, 2025
Job APS-4581
Drag to Compare
Before & After


Scope of Work
What We Did
Complete James Hardie Select Cedar Mill 8.25" Fiber Cement Siding Installation · Double-Layer Tear-Off With New 7/16" OSB Sheathing and Sherwin Williams Finish
Siding
This siding project in Austin, TX started with a full tear-off, including a double-layer section, down to bare studs. We hung new 7/16" OSB wall sheathing, then installed James Hardie Select Cedar Mill 8.25" fiber cement lap siding. Fiber cement holds up well against Austin's 100°-plus summers, hail, and swings in humidity. We wrapped the job with new Hardie fascia and soffit, plus a Sherwin Williams SuperPaint finish, over four days on site.
Learn more about our siding replacement →Exterior Painting
Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.
Wondering where this lands on price? See what siding typically costs in Austin →
How It Went
The Journey
From the first phone call to the final walkthrough — what actually happened on this project.
First contact
June 16, 2025The homeowner found Austin Pro through an internet search and reached out on June 16, 2025. The first conversation focused on the aging, moisture-damaged siding and what a full replacement would involve.
Evaluation
July 14, 2025We inspected the exterior by July 14, 2025. The assessment flagged two hidden layers of old siding, soft sheathing, and early rot in the fascia trim.
Planning & approval
August 5, 2025We built a scope covering tear-off, new sheathing, James Hardie siding, and fascia and soffit work. The homeowner approved the project on August 5, 2025, and we scheduled material delivery through ABC Supply.
Installation
November 12, 2025The full install included a double-layer tear-off, new 7/16" OSB sheathing, Select Cedar Mill lap siding, fascia and soffit, plus an electrical mast detach and reset by a licensed electrician. The crew completed it on November 12, 2025.
Completion
November 12, 2025We completed the job on November 12, 2025, after painting the siding, fascia, and soffit with Sherwin Williams Super Paint. Two yard cleanups and a punch-out closed the site, and the job formally closed on April 2, 2026.
2 Photos
Project Photos
Every photo is this job, shot on site by our crew in Windsor Park, Austin, TX.
Want this on your house?
The Full Story
Inside This Project
Why did this Austin home need new siding?
The old siding had reached the end of its life. Years of hard summers and spring hail left it soft, cracked, and letting moisture reach the wall behind it. This 78723 home sits in an established Austin neighborhood where 1980s and 1990s builds are common.
- Prior owners had layered new siding over old, hiding damage
- Cedar pollen and rain had worked into the seams
- Trim boards at the fascia showed early rot
- The wall needed a full reset, not a patch
What did we find once the old siding came off?
The tear-off told the real story. Under the top layer sat a second, older layer of siding, so we ran a double-layer tear-off to get down to the studs. That extra step matters, because you can never trust siding installed over a hidden problem.
What we found underneath was sheathing past its prime. Rather than reuse it, we installed new 7/16" OSB wall sheathing across the whole home. Fresh sheathing gives the fiber cement a flat, sound surface to fasten to, and it seals up gaps where Austin's wind-driven rain used to sneak in. Skip this step and even the best siding will telegraph every dip and soft spot behind it.
What materials did we use, and why?
We went with James Hardie Select Cedar Mill 8.25" lap siding. It carries the look of real cedar grain but won't warp, swell, or feed the rot that plagues wood in our climate.
- 8.25" lap profile for a bold, clean reveal on the wall
- JH Fascia 6" with a 1x2 detail to finish the roofline
- JH Soffit with H-mold for a tidy underside
- Boards came primed, then topcoated on site
Fiber cement earns its keep in Central Texas. It holds up to 100°-plus summers without buckling, takes hail far better than wood or vinyl, and doesn't soften when cedar pollen and spring storms settle into the seams.
How did the installation go?
Tear-off, sheathing, siding, fascia, and soffit all moved in sequence so no wall sat open overnight. The crew completed the full scope on November 12, 2025.
- A licensed electrician handled the mast detach and reset
- ABC Supply delivered the Hardie material to the site
- Two rounds of yard cleanup and punch items closed out the job
- Fascia and soffit painting covered the 25" to 36" open soffit runs
What did the finished home look like?
The walls, trim, and eaves now read as one clean, painted surface. We finished the siding in Sherwin Williams Super Paint, which locks color into the fiber cement and stands up to UV.
- Uniform lap lines across every wall
- Matched fascia and soffit color for a seamless roofline
- No exposed rot or soft spots anywhere
- A durable shell built to outlast the old material by decades
Straight Answers
Questions About This Project
Why is fiber cement a good choice for Austin homes?
It resists the three things that wreck exteriors here: extreme heat, hail impact, and moisture in the seams. Unlike wood, it won't rot or attract pests, so it's a strong fit for older 78723 homes.
What did a full siding replacement like this cost?
This retail project fell in the $25,000 to $30,000 range. That covered tear-off, new sheathing, all James Hardie material, paint, and the electrical mast work.
How long did the job take from start to finish?
The install itself wrapped on November 12, 2025. The larger timeline ran from first contact in June through approval in August, with the job closing out in spring 2026.
Do I need to paint James Hardie siding myself later?
Not for a long time. The boards were topcoated with a quality exterior paint on site, so you get years of color life before any refresh is due.
Get Your Free Siding Estimate
Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.
Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5
Keep Exploring
More Austin Pro Work
Siding
Siding
SidingOther work near this address