Schedule Appointment
NT Windows
James Hardie

Recent Project: Kyle | Chesser | Windows & Siding | 04-09-26 | APS-4726

Whole-Home NT Twinsulator Aluminum Window Replacement | Coordinated Windows and Siding Exterior Refresh

Schedule a Free Siding Inspection
Schedule Your Free Siding Estimate
A+ BBB Accolade
4.9 Rating

wHAT wE DID

Windows

NT Windows

This Kyle project centered on a full window replacement using NT Twinsulator aluminum windows. We installed both standard units up to 120 united inches and larger openings over 120 UI. The white interior and exterior finish suited the home and reflects heat well during 100-degree summers. Aluminum frames were chosen for their strength and long service life in Central Texas weather.

Learn More About Our Siding

Siding

James Hardie

Siding was the second phase of this Chesser job, completed right after the windows. New siding sealed gaps and refreshed the exterior of this aging Kyle home. The white palette matched the new NT Windows for a consistent, clean look. The upgraded siding also adds a layer of defense against hail and shifting limestone soil around the foundation.

Learn More About Our Siding
How It works

The Journey

01
02
03
04
05

First Contact

The homeowner came to us through a family and friend referral handled by our office staff. The lead was logged on January 21, 2026, and moved to an active prospect the very next day, January 22.

Evaluation

Our window technician visited the Chesser home to measure every opening precisely. This mattered because the home had a mix of sizes, including units over 120 united inches, and each had to be ordered to fit.

PLanning & Approval

After the measure and estimate, the homeowner approved the project on February 5, 2026. We locked in NT Twinsulator aluminum windows with a white interior and exterior finish, and planned to follow the window work with new siding.

Installation

On April 9, 2026, the crew installed all windows first, then moved to the siding. Sequencing it that way let the new siding wrap the fresh openings cleanly. All debris left the site under a single dump fee.

Completion

We walked the finished exterior with the homeowner on completion day, April 9, 2026, and invoiced the same date. The project closed out on April 30, 2026, with manufacturer warranties in place on both the windows and the siding.

Siding & Windows in Chesser, Kyle | Austin Pro

We replaced every window and refreshed the siding on this home in the Chesser neighborhood of Kyle, TX. The result is a tighter, quieter, better-protected exterior built for Central Texas weather.

Project at a glance

  • Services: Windows and siding
  • Location: Chesser neighborhood, Kyle, TX 78640
  • Vendor and product: NT Windows Twinsulator aluminum units
  • Material: Aluminum-frame windows, white inside and out
  • Timeframe: Approved February 5, 2026; completed April 9, 2026
  • Standout outcome: A full exterior refresh done in a single install day

Why did this Chesser home need new windows?

The existing windows were tired and letting heat pour in. Kyle summers push past 100 degrees, and old aluminum frames without modern glazing turn a house into an oven. The homeowner wanted comfort back and a cleaner look outside.

  • Older frames had lost their seal over years of heat cycling
  • Rising cooling costs during long Central Texas summers
  • A dated exterior that no longer matched the homeowner's taste
  • Openings in a mix of sizes, some over 120 united inches

What did we choose, and why aluminum?

We went with NT Twinsulator aluminum windows for this home, and there is real reasoning behind that pick. Aluminum frames are strong and hold their shape under the constant expansion and contraction our heat causes. The Twinsulator line adds a thermal break, so you get aluminum's durability without the old problem of frames baking and transferring heat inside. White was chosen for both the interior and exterior because a light finish reflects sunlight and keeps the frames cooler to the touch. For a Kyle home that faces 100-degree afternoons for months, that combination just makes sense.

  • Standard units installed up to 120 UI
  • Larger units installed over 120 UI
  • Matching white interior and exterior finish
  • Thermal-break frames to fight heat transfer

How did the installation go?

We sequenced this job carefully. Windows went in first, then the siding followed, so the new exterior could wrap cleanly around fresh openings. Doing it in that order avoids gaps and gives a finished edge every time.

  • Window technician measured each opening before ordering
  • Delivery and staging of all units on site
  • Full window installation labor across the home
  • New siding installed after windows were set and sealed

Why replace the siding at the same time?

When you pull old windows, you expose the edges where water and air sneak in. That made it the right moment to tackle the siding too. New siding sealed those transitions and gave the whole exterior a single, consistent face. It also adds a barrier against hail and the wind-driven rain that rolls through Central Texas each spring. Handling both trades in one project spared the homeowner a second round of prep and cleanup down the road.

  • Fresh siding tied into the new window openings
  • White palette matched to the NT Windows for a uniform look
  • Interior touch-up paint supplied through Sherwin Williams
  • Debris hauled off under a single dump fee

What were the results?

The home now has a crisp, matched exterior and windows built for the climate. The homeowner gets better heat control, a quieter interior, and a look that reads brand new from the street.

  • Whole-home window replacement finished in one day
  • Cleaner, more energy-conscious envelope for summer
  • Exterior ready for hail season and shifting limestone soil

Frequently asked questions

How long did this Kyle window and siding project take?

The install itself wrapped up in a single day on April 9, 2026. The lead came in back on January 21, and the homeowner approved the work on February 5, which left time to measure and order the right units.

Why are aluminum windows a good fit for Kyle homes?

Aluminum holds up to the heavy expansion and contraction our 100-degree summers cause. Paired with a thermal break like the Twinsulator design, you keep that strength while blocking heat that older aluminum frames used to let through.

What did this window and siding project cost?

This retail project fell in the $25,000 to $30,000 range. That covered the full window package, siding, installation labor, delivery, and haul-off.

Do the new windows come with support after install?

Yes. NT Windows backs its product, and we stand behind our installation. If anything needs attention after the April completion, the homeowner can reach Austin Pro directly.

GAF shingle roofGAF Master Elite Certificate
No items found.