Holiday Savings

10% off every exterior project, and it stacks up to 25% off.10% off exterior projects

40 days leftSee the deals
Shingle Roofing in North LBJ Drive, San Marcos, TX — completed Austin Pro project

Completed December 2024

Shingle Roofing in North LBJ Drive, San Marcos, TX

We replaced the shingle roofing across an entire apartment complex on North LBJ Drive in San Marcos, giving every building a fresh, matched GAF roof built for Central Texas weather.

Trades
Shingle Roofing
Completed
Brands installed
GAF

Standout outcome — One uniform, hail-ready roof system covering every unit on the property

Timeframe — First contact in July 2024, approved November 5, install wrapped December 3, 2024

Job APS-4327

Scope of Work

What We Did

Full Apartment Complex GAF Timberline Natural Shadow Roof Replacement · Multi-Building Shingle Roofing Staged Over Several Weeks

Shingle Roofing

This large shingle roofing project in San Marcos, TX covered a full apartment complex near North LBJ Drive. We installed GAF Timberline Natural Shadow asphalt shingles, chosen for their dimensional look and proven performance in Texas storms. The scale required careful planning over several months before crews began. The finished roofs give the property a consistent, weather-ready surface built to last through hail and 100-degree summers.

GAFTimberline Natural ShadowAsphalt Shingles$100k+
Learn more about our roof replacement →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what shingle roofing typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

The owner came to us through one of our salesmen who had worked with them on a past project. That first conversation kicked off in mid-July 2024. The scope was clear from the start: a full re-roof of an apartment complex on North LBJ Drive in San Marcos.

Evaluation

August 11, 2024

Our estimator inspected every building on the property before writing a single line of the scope. We documented each roofing section on its own, noting granule loss and general wear from years of San Marcos sun and hail. We began working up the estimate on August 11, 2024.

Planning & approval

November 5, 2024

A job this size needed careful planning. We built out a full apartment complex estimate covering materials, labor, and office fees. The owner approved the project on November 5, 2024.

Installation

The crew staged the work building by building so tenants kept covered roofs throughout. We tore off the old shingles, checked each deck, and installed the GAF Timberline Natural Shadow system to matched specs. Materials came through ABC Supply Co. Inc.

Completion

December 3, 2024

We wrapped the full install on December 3, 2024. Every building now carries one uniform, weather-ready roof.

17 Photos

Project Photos

Every photo is this job, shot on site by our crew in North LBJ Drive, San Marcos, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why did this apartment complex need a new roof?

The existing shingles had reached the end of their life. Years of San Marcos sun, wind, and hail had worn the surface granules thin and left the property owner facing repeated repairs. A patch-by-patch approach no longer made sense on a building this size.

  • Multiple roofing sections across separate apartment buildings
  • Aging asphalt shingles with granule loss and weathering
  • Owner wanted a single, consistent roof instead of mismatched repairs
  • Project value landed in the $100k+ range for the full complex

What did our crew find during the inspection?

Our estimator walked every building before we wrote the scope. Large commercial-scale roofs hide problems that a quick look from the ground misses. On a complex like this, one worn section often signals the same wear everywhere, since all the roofs age under the same sun and the same storms. We documented each roofing section separately so nothing got skipped in the estimate. That upfront detail is what let us plan the job cleanly and avoid change orders mid-install.

What materials did we use, and why?

We installed GAF Timberline Natural Shadow architectural shingles across the whole property. This is one of the most trusted shingle lines in the country, and it holds up well to the heat and hail we see here. The dimensional design also gives the buildings a cleaner, layered look than flat three-tab shingles.

  • GAF Timberline Natural Shadow architectural shingles on every building
  • Rated for high winds common with Central Texas storm fronts
  • Thicker profile that resists cracking under 100-degree roof-deck heat
  • Materials supplied through ABC Supply Co. Inc.

Heat is the quiet enemy of any roof in San Marcos. A dark shingle surface can climb far past the air temperature on a summer afternoon. Cheaper shingles get brittle and curl under that cycle of daily heating and nightly cooling. The Natural Shadow line is built to flex with those swings, which is why it made sense for a property the owner plans to hold long term. It also stands up better to the hard hail hits that roll through the I-35 corridor.

How did the installation go?

This was a months-long effort, not a weekend job. Planning ran from summer into fall, and the install itself took multiple weeks across the buildings. We staged the work section by section so tenants kept dry roofs over their heads the whole time.

  • Tear-off and haul-away of old shingles, building by building
  • Deck inspection before new underlayment went down
  • Full GAF shingle system installed to matched specs across the complex
  • Labor and office fees were part of the scope

What were the results?

The complex now wears one clean, uniform roof that reads as a single property again. The owner traded ongoing patch repairs for a long-term system built to shed water, wind, and hail. Every building matches, top to bottom.

  • Consistent GAF roof across all units
  • Weather protection sized for Central Texas summers and storm season
  • Completed December 3, 2024; job closed out December 12

Straight Answers

Questions About This Project

How long does a full apartment complex re-roof take?

This one ran multiple weeks of active install after months of planning. First contact was in July 2024, and we completed the work by December 3. Large multi-building jobs need staging so no tenant is ever left exposed.

Why choose GAF Timberline shingles for a San Marcos property?

They balance cost, durability, and looks well for our climate. The architectural profile handles heat swings and hail better than basic three-tab shingles. That matters on the I-35 corridor, where storms hit hard.

What does a project like this cost?

A full-complex re-roof of this scale falls in the $100k+ range. The exact figure depends on the number of buildings, roof sections, and deck condition found during tear-off. Each section gets measured and priced on its own.

Do you handle large commercial and multi-family roofs?

Yes. Austin Pro planned and installed this entire apartment complex roof, from inspection through completion. We manage the tear-off, materials, and labor as one project.

Get Your Free Shingle Roofing Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment