Holiday Savings

10% off every exterior project, and it stacks up to 25% off.10% off exterior projects

40 days leftSee the deals
James Hardie Siding & Exterior Painting in San Marcos — completed project by Austin Pro

Completed August 2025

Siding in San Marcos, TX

Plus Metal Roofing, Exterior Painting, Doors, Gutters on the same job

We replaced the siding and completed exterior painting on a San Marcos, TX, property. New fiber cement siding, finished trim, and painted surfaces brought the exterior work together across a larger project.

Trades
Siding, Metal Roofing, Exterior Painting, Doors, Gutters
Completed
Brands installed
James Hardie, McElroy Metal, Sherwin Williams, Therma-Tru

Standout outcome — The crew completed the siding work, cleaned the yard, and addressed final punch items by August 4.

Timeframe — Siding installation ran August 1–4, 2025, over four on-site days; painting took three days during the broader project.

Neighborhood/City — San Marcos, TX 78666.

Vendor and product — James Hardie 8.25-inch Primed Select Cedar Mill siding; Sherwin Williams SuperPaint for the siding finish.

Job APS-4434

Drag to Compare

Before & After

After: James Hardie siding & exterior painting completed in San Marcos
Before the siding & exterior painting project — home exterior in San Marcos
Before
After

Scope of Work

What We Did

Four-Day James Hardie Fiber Cement Siding Installation · Three-Day Sherwin Williams Exterior Painting Scope

Siding

This Siding project in San Marcos, TX, included tear-off, wall sheathing, fascia, and soffit work. We used James Hardie fiber cement siding in the 8.25-inch Primed Select Cedar Mill profile. Fiber cement was a practical choice for an exterior exposed to Central Texas heat. Sherwin Williams SuperPaint finished the new siding and related trim.

James Hardie8.25" Primed Select Cedar MillFiber Cement Siding$60k–$75k
Learn more about our siding replacement →

Metal Roofing

This Metal Roofing project in San Marcos, TX, used McElroy Metal Snap Lock Standing Seam panels. The specified material was 24-gauge metal. Standing seam provides a defined roof profile for a home facing Central Texas sun and storms. We completed the roof as part of a broader exterior project that also included new siding.

McElroy MetalSnap Lock Standing Seam24-Gauge Metal Roofing$50k–$60k
Learn more about our metal roofing →

Exterior Painting

Exterior Painting in San Marcos followed the project's siding and trim scope. Sherwin Williams SuperPaint was specified for the new siding. Separate paint items covered fascia, soffit, the door, and other listed surfaces. The work gave the replaced exterior materials a finished appearance.

Sherwin Williams$15k–$20k
Learn more about our exterior house painting →

Doors

Doors in San Marcos were part of this siding, roofing, and painting project. The scope included an entry door and painting for the door surface. We handled that finish alongside the other listed exterior paint work. The entrance was completed as part of the broader four-day on-site project.

Therma-TruEntry Door$10k–$15k
Learn more about our door replacement →

Gutters

Gutters in San Marcos were included alongside new siding and metal roofing. The specified gutter material was seamless aluminum. James Hardie materials on this project applied to siding, fascia, and soffit work. The gutters completed another part of the home's wider exterior scope.

James HardieHardiePanel Vertical SidingSeamless Aluminum Gutters$5k–$10k
Learn more about our seamless gutters →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

January 31, 2025

The homeowner found us through an online search and reached out on January 31, 2025. The request grew into a plan covering siding and several other exterior trades on the San Marcos property.

Evaluation

February 7, 2025

We inspected the property on February 7, 2025, and began the estimate. The siding scope accounted for tear-off, 7/16-inch wall sheathing, fascia, soffits, and access around the electric panel and meter.

Planning & approval

April 2, 2025

The homeowner approved the project on April 2, 2025. We planned James Hardie Primed Select Cedar Mill siding and Sherwin Williams paint, along with the other exterior trades. Permits and material delivery were included in the work plan.

Installation

August 4, 2025

The siding crew worked on-site from August 1 through August 4, 2025, a four-day installation window. Work included removal, wall sheathing, new siding, fascia, and soffit details. Exterior painting took three days within the broader multi-trade project.

Completion

August 4, 2025

The crew finished on-site work on August 4, 2025. The siding scope included yard cleaning and punch items. New siding and painted exterior surfaces were complete as part of the larger roofing, door, and gutter project.

15 Photos

Project Photos

Every photo is this job, shot on site by our crew in San Marcos, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

How did this San Marcos exterior project get started?

The homeowner found us through an online search and reached out on January 31, 2025. We inspected the property on February 7 and began an estimate for work that extended beyond siding. The homeowner approved the project on April 2, giving us a basis to coordinate the trades before installation.

The building was a sorority house, so this was more than a single-surface replacement. Siding, paint, metal roofing, an entry door, and gutters all had a place in the overall plan. The work unfolded over several months rather than one continuous four-day job.

  • The project included insurance-related work.
  • Permit costs were part of the siding scope.
  • Material delivery was planned alongside the exterior trades.

What did the siding scope tell us to check first?

The siding plan called for tear-off, including double-layer removal in portions of the work. It also called for 7/16-inch OSB wall sheathing. That matters because a new board cannot make the wall beneath it sound; the sheathing has to be addressed where the scope requires it. We planned the wall work before treating paint as the final step.

Fascia and soffit needed attention too. The scope included removal of existing aluminum or vinyl material in those areas, followed by James Hardie fascia and soffit components. Homeowners often focus on the large siding panels, but unfinished edges can leave a replacement looking incomplete. Here, those smaller surfaces were part of the same exterior plan.

  • The fascia specification called for 6-inch James Hardie pieces with 1-by-2 trim.
  • The soffit specification included H-mold.
  • Electric panel and meter removal was included to allow siding demolition and installation in that area.

Why use primed fiber cement siding on this property?

We specified 8.25-inch Primed Select Cedar Mill fiber cement siding from James Hardie for the replacement. Its primed surface fit the separate painting scope, while the cedar-mill texture set the appearance of the new boards. Fiber cement is a practical choice for a San Marcos exterior facing Central Texas summers that can pass 100°F. The important distinction is that the board and its coating do different jobs: installing primed siding does not finish the paint work.

This choice also shaped the order of operations. The crew needed to complete removal and wall preparation before the new siding could go on. Paint could then cover the installed boards and the trim surfaces included in the scope. Keeping those steps distinct helped us manage a project with several trades.

  • The siding scope included separate wall-sheathing work and a delivery allowance.
  • Sherwin Williams SuperPaint was specified for painting the siding.
  • Paint for fascia and soffit surfaces up to 24 inches was included.

How did we manage four siding days within a larger job?

The siding crew worked from August 1 through August 4, 2025. Across those four on-site days, the scope moved from tear-off and wall work to new siding and finish details. The full project involved multiple trades over several months, so the siding dates should not be mistaken for the duration of every exterior task.

The sequence mattered at the electric panel and meter. Their removal was included so the crew could reach siding in that area rather than stopping the replacement short. We also had to account for fascia and soffit work, which followed their own removal and installation steps. A large exterior project runs better when each trade has room to finish its part.

  • The roofing portion specified McElroy Metal Snap Lock standing-seam panels in 24-gauge metal.
  • The broader scope also included an entry door and seamless aluminum gutters.
  • Yard cleaning and punch work were listed as final siding tasks.

What did the exterior painters cover?

Painting was a separate three-day part of the project. The plan covered the primed siding, fascia, soffits, and doors, using Sherwin Williams paint products. That broader scope matters: coating only the new siding would have left adjacent surfaces outside the planned finish work.

We kept the paint description tied to the surfaces in the scope. SuperPaint was specified for the siding, while the other listed work covered trim and doors. No color selection is needed to explain the result: the replacement materials received their planned painted finish.

  • Fascia and soffit painting was measured separately from siding painting.
  • Door painting was included in the exterior scope.
  • Additional painted surfaces were allowed for by area.

What was complete when the crew left?

The crew finished on-site work on August 4, 2025. The siding scope included yard cleanup and punch items, the details that help a large job reach a clean stopping point. The completed exterior work paired new siding with painted surfaces, while the roof, door, and gutter work formed part of the wider project.

Those boundaries are worth keeping clear. Four days describes the siding installation window, not the time from the homeowner’s first call to the last trade. Painting had its own three days. For a property with several exterior systems in play, a clear sequence is more useful than calling the whole project a quick siding job.

  • The final on-site date was August 4, 2025.
  • The siding scope included two yard-cleaning tasks and punch items.
  • The work covered both wall surfaces and fascia/soffit details.

Straight Answers

Questions About This Project

Was the whole exterior project finished in four days?

No. August 1–4 was the siding installation window. Painting took three days, and the roofing, door, and gutter work belonged to a broader project that spanned several months.

Why paint James Hardie siding after installation?

This project used primed Select Cedar Mill siding, not a specified factory-finished color. The Sherwin Williams SuperPaint step supplied the planned finish for those new boards.

What price range applied to the siding and painting work?

The siding value band was $60,000–$75,000, and exterior painting was $15,000–$20,000. Those are separate service ranges, not a quoted total for the full multi-trade project.

Did the scope include cleanup or follow-up work?

Yes. The siding scope listed yard cleaning and punch items before the crew finished on August 4. It did not specify a warranty term, so we would confirm any warranty details from the final project documents rather than assume them.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment