Holiday Savings

10% off every exterior project, and it stacks up to 25% off.10% off exterior projects

40 days leftSee the deals
James Hardie Siding & Exterior Painting in Southhampton Hills, Austin — completed project by Austin Pro

Completed November 2025

Siding & Exterior Painting in Southhampton Hills, Austin, TX

We installed siding and completed exterior painting at a home in Southhampton Hills, Austin, TX. The finished work pairs cedar-textured fiber cement boards with painted trim and drainage surfaces.

Trades
Siding, Exterior Painting
Location
Southhampton Hills, Austin, TX
Completed

Timeframe — November 21–24, 2025; four days of on-site work.

Vendor and product — James Hardie Select Cedar Mill siding and Sherwin Williams SuperPaint.

Result — New siding, painted fascia and soffit, plus painted gutters and downspouts.

Job APS-4646

Scope of Work

What We Did

8.25-Inch James Hardie Select Cedar Mill Fiber Cement Siding · Sherwin Williams SuperPaint Siding and Exterior Detail Finish

Siding

This siding project in Austin, TX, used James Hardie fiber cement boards in the 8.25-inch Select Cedar Mill profile. We installed primed material before the exterior paint work. Fiber cement suited a home exposed to Austin's long, hot summers. The finished siding brought a consistent cedar-grain texture to the exterior.

James Hardie8.25" Select Cedar MillFiber Cement Siding$10k–$15k
Learn more about our siding replacement →

Exterior Painting

Exterior painting in Austin, TX, covered the new siding and several adjoining exterior surfaces. We used Sherwin Williams SuperPaint on the siding. The scope also included fascia, soffit, gutters, and downspouts. Painting those areas together gave the siding work a more complete finish.

Sherwin WilliamsSuperPaintExterior Paint$2k–$5k
Learn more about our exterior house painting →

Service price ranges are for that work before any discounts. Any total project cost mentioned on this page may include applied discounts.

Wondering where this lands on price? See what siding typically costs in Austin →

How It Went

The Journey

From the first phone call to the final walkthrough — what actually happened on this project.

First contact

September 15, 2025

The homeowner reached out on September 15, 2025, after a James Hardie referral. The initial discussion concerned siding, with exterior painting also included in the eventual project.

Evaluation

September 15, 2025

We inspected the home and began the estimate on September 15, 2025. The scope that followed covered primed Select Cedar Mill siding, paint for the siding, and painting for the fascia, soffit, gutters, and downspouts.

Planning & approval

October 7, 2025

The homeowner approved the project on October 7, 2025. We planned for 8.25-inch James Hardie fiber cement siding and Sherwin Williams SuperPaint, along with delivery, cleanup, and punch work.

Installation

November 24, 2025

The crew worked on site from November 21 through November 24, 2025. The work combined siding installation with painting the new siding and the other exterior surfaces named in the scope. Cleanup and punch items were also included.

Completion

November 24, 2025

The crew finished on-site work on November 24, 2025. The completed project brought together the new cedar-textured siding, painted fascia and soffit, and painted gutters and downspouts. Punch work and yard cleanup were part of the finishing scope.

6 Photos

Project Photos

Every photo is this job, shot on site by our crew in Southhampton Hills, Austin, TX.

Want this on your house?

Book a Free Inspection
Pick Your Time

The Full Story

Inside This Project

Why pair siding and painting on this Southhampton Hills home?

The project called for more than putting new boards on the wall. Its scope included primed siding, paint for that siding, and work on several surfaces beside it. Planning both trades together let us address the exterior as one job rather than treating the paint as an unrelated add-on. That distinction matters on an older Austin home: a fresh siding surface can draw attention to adjacent areas left outside the plan.

  • The siding selection called for the Select Cedar Mill texture, which has a wood-grain appearance.
  • Separate paint items covered fascia and soffit, including a 25-to-36-inch or open-soffit category.
  • Gutters and downspouts were included for painting by linear foot.
  • The project also allowed for punch work after the main installation and paint tasks.

What did we establish before the crew arrived?

The homeowner reached out through a James Hardie referral on September 15, 2025. We inspected the home and began the estimate that same day. The resulting plan covered two services, not a siding-only installation.

  • The homeowner approved the project on October 7, 2025.
  • Primed Select Cedar Mill boards appeared in the material scope.
  • Exterior paint was specified for the siding rather than listed only for trim.
  • Delivery was included among the planned job items.
  • No roofing, window, or door replacement formed part of this project.

Why use this fiber cement profile in Austin?

We chose the specified 8.25-inch Select Cedar Mill boards to give the home a defined lap-siding pattern and cedar-like texture without using cedar boards. Fiber cement is a practical choice for a siding project facing Austin's 100°+ summers. The key measurement is the board's stated 8.25-inch size; it should not be mistaken for a promise about the visible exposure after installation. We also planned for a painted finish from the outset because the siding material was primed, not listed as factory-finished.

  • James Hardie supplied the siding specified for this home.
  • The material schedule included both primed Select Cedar Mill and 8.25-inch primed Select Cedar Mill entries.
  • Sherwin Williams SuperPaint was the named product for painting the siding.
  • The paint work extended beyond the fiber cement boards to the fascia and soffit.

How did the siding installation and paint work unfold?

Our crew worked across the scheduled multi-day installation window, then finished on November 24. The scope joined siding placement with exterior paint work, so completion meant addressing both trades. We also had delivery, cleanup, and punch items to handle around the main work.

  • On-site installation began November 21, 2025.
  • The new siding was the primed Select Cedar Mill profile selected for the home.
  • SuperPaint was specified for the siding paint portion.
  • The scope listed two yard-clean items along with punch work.
  • A separate punch-out item provided for final detail work.

Which surfaces received attention beyond the new boards?

Painting the siding alone would not have covered the full exterior painting scope. Fascia, soffit, gutters, and downspouts were also included. These are separate surfaces, and each needed to remain accounted for while the siding work moved toward completion.

  • The fascia and soffit paint item covered a 25-to-36-inch or open-soffit condition.
  • Gutter and downspout painting was measured per linear foot.
  • A general paint item appeared alongside the more specific surface entries.
  • The paint selection was Sherwin Williams SuperPaint, not a siding replacement product.
  • No gutter or downspout replacement was included in the listed services.

What did the homeowner have when we finished?

The crew completed its on-site work on November 24, 2025. At that point, the project covered the planned siding and exterior painting tasks, including the adjoining surfaces named in the scope. The result is a coordinated exterior finish without suggesting that unrelated parts of the home were replaced.

  • The project was completed in Southhampton Hills, within Austin's 78745 ZIP code.
  • The siding work used James Hardie fiber cement rather than natural cedar.
  • The painting scope included both wall surfaces and exterior detail areas.
  • Yard cleanup and punch items were part of the work plan.
  • This was a siding and painting project, not a roofing project.

Straight Answers

Questions About This Project

Did the September inspection count as installation time?

No. The homeowner contacted us and we inspected the home on September 15; approval followed on October 7. The four-day on-site window did not begin until November 21.

Was the 8.25-inch figure the amount of siding visible on the wall?

No. It identifies the specified Select Cedar Mill board size. The visible portion of lap siding depends on how the boards overlap.

What was the project's price range?

The listed value band for the primary siding service was $10k–$15k. The exterior painting service had its own $2k–$5k band; those bands are not an exact final price.

Were new gutters part of the job?

The scope called for painting gutters and downspouts by linear foot. It did not list gutter replacement.

Get Your Free Siding Estimate

Tell us about your project — we'll call you back to schedule a free inspection. No pressure, honest numbers, 4.9 stars across 474 Google reviews.

Thank you — we received it and will call you shortly.

Something went wrong — please call (512) 550-0000.

Prefer to talk now? Call (512) 550-0000 · Mon–Fri 8–8, Sat 8–6, Sun 12–5

Schedule an Appointment